Академический Документы
Профессиональный Документы
Культура Документы
1/26
DELHI METRO
The Delhi Metro is a rapid transit system serving Delhi, Gurgaon, Noida and Ghaziabad in the National Capital Region of India. Delhi Metro is being built and operated by the Delhi Metro Rail Corporation Limited (DMRC). Began operation: 24 December 2002.
2/26
9/2/2012
9/2/2012
3/26
9/2/2012
4/26
9/2/2012
5/26
6/26
7/26
PRICES
Tourist Card: For unlimited travel over short periods. There are two kinds of cards - 1 day and 3 day. - Value of 1-Day Card: Rs 100 - Value of 3-Day Card: Rs 250 - Refundable Deposit: Rs 50/- payable at purchase (refundable on return of card) Token: - Single-Journey Token: For one way journey - Value will depend on the destination. Valid only on the day of purchase. - Minimum Fare Rs. 8/- and Maximum Fare Rs. 30/9/2/2012
8/26
Method of Distribution
How to use your Token: - Hold your token close to the machine for the gates to open. - At exit, drop a Single-Journey token into the machine. How to use your Smart Card/ Tourist Card: - For entry to the station, please exhibit your travel card at the entry gate for the flap to open. - For exit please exhibit your travel card at the exit gates for the flap to open and to do an exit from the station.
9/2/2012
9/26
Government Policy
The DM had been provided with the following concessions by GOI to make the project viable, namely a) The cost of land equivalent to Rs. 2180 million has been provided as an interest free subordinate loan by GOI/GNCTD to be repaid by the DM. (b) The risk associated with the exchange rate fluctuations is borne by government in case of foreign debt, (c) The DM is exempted from payment of income tax, capital gains tax, property tax and customs duty on imports, (d) The DM is permitted to generate resources through property development over a period of 6-20 years and (e) No dividend is paid on GOI share of equity till the senior debt is repaid fully by the twentieth year.
9/2/2012
10/26
TECHNICAL ANALYSIS
9/2/2012
11/26
7772
56341
64063
11
Total Cost
Engineering Works Electrical Works
Land, 3339
Engineering Works, 31327
Rolling Stock
Land
12/26
TECHNICAL ANALYSIS
The Delhi Metro (DM) planned in four phases is part of the MRTS. As of August 27, 2011, the whole of Phase-I and Phase-II are complete, with the network comprising six lines with 142 metro stations and a total length of 189.7 km (117.9 mi) Phases III (112 km) and IV (108.5 km) are planned to be completed by 2015 and 2021 respectively, with the network spanning 413 km (257 mi) by then.[
9/2/2012
13/26
14/26
9/2/2012
14
9/2/2012
15/26
PHASE 1
The 1st Phase consists of 3 corridors divided in to 9 sections
Corridor Under Ground Corridor Elevated Corridor Grade Rail Corridor Length (Km) 13.17
47.43 4.5
Total Length
65.10 km
9/2/2012
16/26
16
PHASE 2
The 1st Phase consists of 3 corridors divided in to 12 sections
Corridor Under Ground Corridor Elevated Corridor Grade Rail Corridor Total Length Length (Km) 8.93
42.24 1.85
53.02 km
9/2/2012
17/26
FINANCIAL ANALYSIS
9/2/2012
18/26
9/2/2012
19/26
9/2/2012
20/26
21/26
22/26
9/2/2012
23/26
9/2/2012
24/26
24/26
25/26
THANK YOU
9/2/2012
26/26