Вы находитесь на странице: 1из 19

CENTRAL BOARD OF EXCISE & CUSTOMS

Meeting with Officers and Custodians of proposed ICES locations 11th December, 2008

DIRECTORATE GENERAL OF SYSTEMS & DATA MANAGEMENT

www.cbec.gov.in

www.icegate.gov.in

Overview of
Indian Customs EDI System (ICES)

Date here PricewaterhouseCoopers

Directorate General of Systems & Data Management

Objectives
Reduce time taken in clearance of cargo (dwell time) Reduce interface between Trade and Customs Promote accuracy, transparency, accountability Ensure uniform practices Ensure better monitoring & control Improve quality of data collection Faster disbursal of export incentives

Features
Electronic filing of Declarations

- Service Centre - Electronic Commerce/Electronic Data Interchange Gateway (EC/EDI- Gateway) ICEGATE
Automation of Customs workflow E-payment of Customs duly (optional) Message exchange with business partners through ICEGATE Direct credit of Drawback in Exporters bank account Automated transmission of Shipping Bills after export to DGFT

Import Declarations
Importer Submission of Declaration RMS No

Value < 0.1 million Message to Bank For duty BE/ Challan Print AC Value >0.1 million Appraising Officer

Goods Registration

Examination

Out of Charge

Release of goods

Print Bill of Entry

Date here PricewaterhouseCoopers

Directorate General of Systems & Data Management

Export Declarations
Exporter Submission of Declaration
Value above Certain limits

Export under Schemes ?


No
Yes

Registration

AC

Appraising

Examination

Let Export

Print

Grant of Export Incentives


PricewaterhouseCoopers

EGM

Export of Goods
Date here

Directorate General of Systems & Data Management

Components of ICES Version 1.0 (at existing sites)


Distributed Systems UNIX based single tier architecture Runs on Sun Microsystems Hardware Operating System SOLARIS 2.6 Relational Database ORACLE 7.1 SQL Forms 3 Terminal Emulation Software for PCs Dumb Terminals for Data Entry

ICES Existing Implementation

35 Customs locations covering major Seaports, Airports, Inland Container Depots and Land Customs Stations

85% of Countrys International Trade covered.


Approximately 98% of Exports and 95% of imports Declarations processed electronically at ICES locations.

Components of ICES Version 1.5 (under implementation)

Centralized System Unix based three tier architecture Application will run from Data Centre at Delhi with Disaster Recovery Centre at Chennai Operating System HP_UX Relational Database ORACLE 10g. Thin clients at users end Service Centre Access to Database through ICEGATE

ICES Version 1.5- Current Status

Application Primary Modules (Exports and Imports)-ICD Version- running at Pilot Site at Dadri and extended to adjacent 4 private ICDs at Dadri Group VII modules for imports under EP Schemes developed by NIC and under testing Service Centre Module for access through ICEGATE under development by NIC Air & Sea Version under development by NIC Message generation and integration is under development/ testing.

ICES Version 1.5- Rollout Plan


Pilot sites at Dadri would be provided access to Application to be hosted at Data Centre in January, 2009 After stabilization of operations (which may take1-2 months), new locations (ICDs) would be provided access to Application hosted at Data Centre Thereafter, new ACC locations would be provided access to Application (Air Version) hosted at Data Centre Thereafter, new Seaport locations would be provided access to Application (Sea Version) hosted at Data Centre Thereafter, new LCS locations would be provided access to Application (Land Version) hosted at Data Centre Existing ICES locations would be considered for migration to Data Centre only after successful migration of pilot/new site of respective version of Application at Data Centre

MESSAGE EXCHANGE WITH CUSTODIANS

All Message specifications for ICES 1.5 have been finalized by NIC; Message specifications can be downloaded from the hyperlink Message formats for ICES 1.5 on ICEGATE website: http://www.icegate.gov.in/ICES1.5.htm Upgraded ICEGATE will have Multiple Message formats i.e. proprietary Flat File, XML and UN-EDIFAC; XML schema for Port messages have already been developed in consultation with IPA; Document Tracking system on ICEGATE website; Trading partners/ Custodians can use MPLS, Leased line or Internet connectivity to send messages to data centre in New Delhi and disaster recovery site in Chennai;
Date here

PricewaterhouseCoopers

Directorate General of Systems & Data Management

MESSAGE EXCHANGE WITH CUSTODIANS (contd.)

VSNL contact person for connectivity is Mr. Debashish Mandal 9250001033(M); Has the capability to use secure communication protocols like AS1, AS2 (Preferred), SFTP, HTTPS, PGP, secure Email using digital signature etc.; What is required to start AS2 communication: AS2 Software Firewall permissions Public Keys needs to be exchanged Private Keys needs to be retained Agree on encryption algorithm being used URL at which data needs to be posted Port at which the server is being hosted
Date here

PricewaterhouseCoopers

Directorate General of Systems & Data Management

Schematic Diagram WAN / LAN


Data Centre (DC)
Centrally Hosted Applications ICES / ACES

INTERNET MPLS/Leased Line

Disaster Recovery (DR)

MPLS
WAN
Banks Importer / Exporter

BCP Custodians

LAN
Central Excise Customs

PricewaterhouseCoopers

Directorates & Other Offices

Date here

Directorate General of Systems & Data Management

Brief LAN Components


Thin Client Thin clients perform the same functionality as PCs except that there is no local storage Used for accessing the applications hosted at the Data center Scanners The scanning facility will be available in the LAN at the Utility Area in specified CBEC offices Print servers Used for supporting the printing and scanning functions. Printers DeskJet Printers To be connected to a Thin client or redeployed PC. Network Laser Printers Shared by all LAN Users. Will be placed in Utility areas, easily accessible for all LAN Users Dot Matrix Line Printers Heavy duty printers for printing Bills of Entry and shipping bills and other documents at Customs locations
Date here PricewaterhouseCoopers

Directorate General of Systems & Data Management

Brief LAN Components

Power Backup
UPS
UPS with in-built redundancy -15 min back up. Provide interim power between mains power failure and DG set switching on.

Diesel Generator (DG) Set


The Diesel Generator (DG) set (or sets) will used for powering on the LAN equipment. The ACs, Fans, lights and any other non LAN equipment not to be connected to the DG set. During a power failure, the DG set will switch on automatically within 3 to 4 minutes.

Detailed presentation on LAN Project is available at www.cebce.gov.in/rhs.misc/LAN_Ph8.ppt & www.icegate.gov.in/LAN_Prez_Install_Phase8.pps


Date here PricewaterhouseCoopers

Directorate General of Systems & Data Management

Site Preparation
OFC Link between Office & Sheds (2 exclusive strands for Customs) Infrastructure for Message Exchange with Customs EDI System Service Centre: Min. 150 Sq ft. for 2 nodes (extra 50 sq ft per seat)

Creation/Identification of cabin space in examination areas/shed


Identification of Rooms for Appraising/Audit/Drawback Staff Communications Room to contain :

Rack with router and modems installed as part of WAN Project Telecom Multiplexer installed as part of WAN project 15U/42U rack with LAN equipment & UPS
Secure room with restricted access of min. Area 8 x 6desirable if the room size is 10 X 15

Offices/Cabins to be:

- Dust Free & Air Conditioned - temperature between 2225deg C - Pest control measures required to prevent damage Date here PricewaterhouseCoopers seepage - No water Directorate General of Systems & Data Management

Frequently Observed deficiencies in WAN Project Equipments not powered ON 24 X 7 due to which monitoring/testing of site cannot be done

UPS not available for WAN equipments AC not available in Communications Room Communication room not dust free

Detailed presentation on WAN Projects available at www.cebce.gov.in/WAN-proj/cbec-WAN_13.0.ppt & www.icegate.gov.in/CBEC_WAN.ppt


Date here PricewaterhouseCoopers

Directorate General of Systems & Data Management

THANK YOU

Date here PricewaterhouseCoopers

Directorate General of Systems & Data Management

Вам также может понравиться