Sub base
Site Clearing
It is the first operation to be done in highway earth work It consists of removing removing trees, stumps, roots and top soil
Embankment Construction
An embankment is necessary when ever it is required to raise the grade line of a road above the ground level
Embankment Filling
Sub grade
Sub grade is the lowest point of the pavement structure It is the level at which excavation ceases and construction starts It is also known as the formation level
Construction of Structures
Hume pipe Culverts Box Culverts Bridges Retaining Walls
Base Construction
The Base,which comes immediately over the sub base, is the medium through which the stresses imposed are distributed evenly. Generally it is constructed using rock based products In most of road constructions in Sri Lanka, the Aggregate Base Course (ABC ) is used as the base construction material
Shoulder Construction
Shoulder is a portion of roadway and is intended for Lateral support of base and surface courses Accommodation of pedestrians Accommodation for stopped vehicles Emergency use
Surface Course
Surface Course is the top most layer and function of the surface course are, To perform as a structural portion of the pavement To resist the abrasive forces of the traffic To reduce the amount of surface water penetrating the pavement To provide a smooth, uniform and skid resistant surface.
DBST
DBST