Академический Документы
Профессиональный Документы
Культура Документы
Overview
India's largest passenger car company, accounting for over 45% of the
First company in India to mass-produce and sell more than a million cars
It offers 14 brands and over 150 variants ranging from peoples car Maruti
800 to the stylish hatchback Ritz
The Problem
Fall In Demand
Expected fall in demand during crucial festive season, when car sales touch the peak
The Manesar plant is the hub for the key 'Swift' model, which runs a huge backlog in the retail market
The bookings for the new Swift and waiting list of customers are very
Loss In Output
Estimated loss of more than 90 million $ On August 24, 1,230 cars were planned to be produced, but only 437 were assembled. Out of which, just 96 cars could pass quality check
Halt in production on the 5th September, around 4000 workers rallied till the highway to block it
Poor dispatch numbers with respect to meeting targets and quality control
Cont.
With only around 20-25 of 950-odd workers agreed to sign the Good Conduct undertaking Production was stalled as the company barricaded various entrances to prohibit entry of those who refused to sign the 'good conduct bond'.
Cont.
Revenge for June's strike Cockroaches and dead flies found in the food in the hurried lunch-break that workers earn in the canteen km from the working station
The tea was without tea leaves or sugar in the 7 minute break The company doctor give heavy doses of instant medicines even on minor complaint so that disruption of work could be prevented
Cont.
One days wage cut of Rs.1500, two days Rs.2200, three days cut of Rs.78000 is implemented, so that almost the total months wage is cut
One second late into punching-card entry is a days wage cut, but they have to give full production for that day too
Workers Demand
company
Cont.
Workers indulging in deliberate attempts to reduce output and are compromising customer interests
Refused to sign good conduct form which aims at ensuring the production of
good quality products
Employees are being charged with sabotage and causing quality problems in
the cars produced
Cont.
"In the last three days, a series of serious quality problems have been
observed in the vehicles produced. For example, vehicle door was not
properly clamped leading to doors falling during production, wiring
harnesses were found cut in produced vehicle, dents were noticed on the
body and critical components were not fitted on to vehicles. Such deliberate acts, if not detected during quality checks, would have led to serious implications and directly harmed customers," a senior company official said.
Suspension of 10 workers
Dismissal of five
Discontinued the services of six trainees
Cont.
30th on false charges demanding a good-conduct bond with the state police
and administration, the media, and bouncers on its payroll as its willing pawns.
The Maruti Suzuki Employees Union (MSEU) is demanding as an immediate measure, the withdrawal of the charge-sheet, termination, suspension of the 49 workers. The workers are sitting day-and-night at the factory gate, peeling off the layers of Maruti Suzukis way of life.
Facts
June 1) 13-days strike demanding the recognition of the MSEU at the Manesar plant 2) Production loss of 12,600 cars, valued at about Rs 630 crore. July 1) Production stopped for a day at the same plant because of strike by some workers. August 1) Reported 12.74 per cent fall in sales for August to 91,442 as compare to the sale of 1,04,791 units in the same month last year September 7 1) Loss suffered is estimated at about 8,550 units, valued at about Rs 425 crore. Source: Economic Times
Production is right now at a stop at Manesar Third production halt in three months at Manesar.
Solution
1. 2. 3.
Identified reasons of the conflict:Establishment of separate union for Manesar Plant Code of Conduct- Falling standards of manufacturing Basic sanitary enhancements demanded by the workforce
Trade union would be established with prior conditions: Members of the trade union to be nominated with consent of both workers and management
2. 1.
The leader of this union would be appointed by the management If not agreed then management would move to plan B Technology oriented operations reducing demand of man power
Unfreezing