OUTLINE
Introduction Protection System Single Line Diagram of Ramah Grid Busbar Protection Transformer Protection Distance Protection Implementation Conclusion & Recommendations
Introduction
The graduation Project of our group is proposed from TRANSCO to UAE University. Transco Company is building now new Grid Substation in RAMAH to provide the enough power to that area.
Introduction
Substation is the place where the power is stepped up or down. Substation contains: Feeder Transformer Busbar Bus coupler. Other Protection equipment Ramah Grid Substation power is stepped down by transformers from 220 KV to 33 KV.
Introduction
Objectives
Design a complete Protection System of 220 KV / 33KV Grid Station using ADWEA standard.
Comparing the design results with existing systems and simulated results.
Introduction
Environmental Effects
Building a grid substation is very expensive. The protection of power system is the first thing that designer thinks about to safe the money and efforts. Any small mistake in the protection system can cause large damages and the designers will be blamed. The three goals of this protection are:
Protection System
Complete arrangement of protection equipments and other devices. Protection Equipments:
Current & Voltage Transformers ( CT & VT ). Circuit Breaker (CB) Relay
Protection System
Relay
Relays are like human brain A device that measures the (Current or voltage) of the system.
Protection System
CT
CT steps down the current to small value to be Suitable to the relay.
Protection System
Circuit Breaker
A switch like a (fuse) that used to interrupt the current flow. It opens on Relay Command.
Protection System
Protection Zones
Reasons for Zones:
Amount of power carried Physical Structure. Function.
Bus-Bar Protection
Single Line Diagram
The busbar is a bar of copper or aluminum built in switchgear
Incoming1
Outgiong1
Incoming2
Outgiong2
Bus coupler
Bus-Bar Protection
In Fault Condition
Bus-Bar Protection
Simulated System in Normal Condition
Bus-Bar Protection
Simulated System in Fault Condition
Bus-Bar Protection
Logics of Busbar Protection
Tripping CBs
Incoming Current
Differential Current
0 A B Ctrl CB1 Ctrl = 1
I1 I2
D + + F
D + F
| X|
Ix
1 2 TripSignal
I3
++ F
I4
I5
Outgoing Current
Bus-Bar Protection
Logics of Busbar Protection
Fault Starts after 1 s
Bus-Bar Protection
Simulation
Transformer Protection
The electrical protection of the Transformer comprises of the following:
Differential Current Protection.
REF (Restricted Earth Fault). AVR (Automatic Voltage Regulator). Over current protection.
Transformer Protection
Differential Current Protection
Id = I1 I2 0
Transformer Protection
Simulated System
Transformer zone
Transformer Protection
Logics of Differential Protection
Transformer Protection
Over Current Protection
In the event of failure or nonavailability of the primary protection some other means of ensuring that the fault is isolated must be provided. These secondary systems are referred to as back-up protection. Back-up protection
Back- Up protection
Transformer Protection
Logics of Transformer Protection
Back- Up protection
B1
Transformer Protection
System in Normal Condition
Advanced Graph Frame
B1
1.5k 1.0k
CT1_a
CT1_a
y
CB1 1.0e-006
-0.5k -1.0k -1.5k 0.60 0.40 CT1_aa CT2_ab Id IP=0.155
y
#2 #1
-0.20 -0.40
#3
50 [MW]
50 [MVAR]
CB2
T3 1.0e-006
CT1
0.5k 0.0
0.20 0.00
-0.60 1.280 1.300 1.320 1.340 1.360 1.380 1.400 ... ... ...
CT2
1.0e-006 1.0e-006
Transformer Protection
System in differential fault condition
A dvanced Graph Fram e
B1
150.00k 100.00k
CT1_a
CT1_a
y
-50.00k -100.00k -150.00k
CB1
#1
#2
#3
CB2
50 [MW]
T3
1.0e-006
50.00k 0.00
Id
IP =0.155
1.0e-006
CT1
CT2
1.0e-006 1.0e-006
50 [MVAR]
SF
1.000
1.020
1.040
1.060
1.080
1.100
1.120
1.140
1.160
1.180
Transformer Protection
System in differential fault condition
Advanced Graph Frame
B1
150.00k 100.00k
CT1_a
CT1_a
y
CB1 1.0e-006
-50.00k -100.00k -150.00k 300 200 CT1_aa CT2_ab Id IP=0.155
#1
#2
#3
CB2
50 [MW]
T3 1.0e-006
CT1
50.00k 0.00
CT2
1.0e-006 1.0e-006
50 [MVAR]
1.0
Trip signal ( CB1 CB 2)
2.0
3.0
4.0
5.0
-0.40 0.0 1.0 2.0 3.0 4.0 5.0 ... ... ...
Transformer Protection
System in over current fault condition
B1 CB1
#2
#3
#1
50 [MW]
50 [MVAR]
CB2
T3
1.0e-006
1.0e-006
CT1
0.4 s
CT2
1.0e-006 1.0e-006
Transformer Protection
Simulation
Distance Protection
Distance protection is used mainly for overhead lines protection.
The main function of distance relays is to make high and fast protection system for the overhead lines.
Distance Protection
Single Line Diagram of outgoing OHLs
Distance Protection
RAMAH ALANJAH Overhead Line
Distance =30 Km Zone1 covers 80% (24 km) Zone2 covers 100% (30 km)
Distance Protection
Distance Protection is applied to this line
Distance Protection
Distance Protection
CB1 A CB2
c
B
If fault happens in A:
CB1 will operate after time t1
If fault happens in B:
CB2 will operate. if it is not operated. CB1 will operate after time t1+0.3s
If fault happens in C:
CB1 and CB2 will not operate
Distance Protection
The impedance of the Line is :
The calculated impedance by Relay:
Z < 80 % Zline
Fault happens in zone-1
Z> Zline
No Fault happens in Line
Distance Protection
If calculated impedance in Zone-1:
s
If calculated impedance outside zones:
Distance Protection
Simulated System in Normal Condition
Distance Protection
Fault occurs in Zone-1
Distance Protection
Fault occurs in Zone-1
Distance Protection
Fault occurs in Zone-1 & CB2 doesnt operate
Distance Protection
Logics of Distance Protection
Voltage Magnitude Voltages and phases for sequences Phase
vam vbm vcm 1 2 3 Va Mag1 Mag2 Mag3 (7) (7) (7) X1 Ph1 (7) FFT Ph2 X2 (7) X3 F = 50.0 [Hz] dc1 dc2 Ph3 (7) dc3
vam vap
1
|A| /_A
vpm
1 2 3
vap
2
|B|
vbp
3
vcp
Frequency Scanner
Sequence Filter
Distance Protection
Logics of Distance Protection
Current Magnitude
iam ibm icm 1 2 3 Ia Mag1 Mag2 Mag3 (7) (7) (7) X1 Ph1 (7) FFT Ph2 X2 (7) X3 F = 50.0 [Hz] Ph3 (7) dc1 dc2 dc3
iam iap
|A| /_A
ipm
1 2 3
iap
2
ibp
3
icp
Frequency Scanner
Sequence Filter
Distance Protection
Logics of Distance Protection
Trip CB1
vam VM vap VP iam IM
iap IP izm I0M
R-X Plane
Va I + kI
a 0 R X RMS RMS Ra
R X 21
O1
Delay T
izp I0P
Xa
S Open Breaker B1
Delay
B1
V&I parameters
2 X D + + F 2 X X Ix Ix > Ioc
TripSignal
Trip CB2
Define the Zone of fault
Delay T
0
S Open Breaker B2
B2
Distance Protection
Distance Protection
Simulation
Implementation
Conclusion
In this GP; there were long steps of calculations and simulation using PSCAD program which allows the designer to simulate the large values of power in details.
After doing all these steps; the simulated results will be sent to Transco Company to be as a real setting for the protection system..