Вы находитесь на странице: 1из 112

MANAGEMENT of HEALTH, SAFETY, ENVIRONMENT and QUALITY SYSTEMS

Master HSE&Q

University of Pisa Master Universitario di II livello

MANAGEMENT of HEALTH, SAFETY, ENVIRONMENT and QUALITY SYSTEMS

M.9
ENI E&P and the environment
Prof. Leonardo Tognotti University of Pisa
Module M.9 Environmental Management
2

Program of the day


1 Introduction to Environmental Engineering

Master HSE&Q

2 ENI E&P and Environment: the documents

Environment fundamentals: mass and energy transfer

4 Environment fundamentals: environmental chemistry

Module M.9 Environmental Management

ENI E&P documents: some examples

Master HSE&Q

1.3.0.01 Directive - Organization of the Health, Safety, Environment and Public Safety Integrated Management System

1.3.0.03 Standard: HSE Risk Management 1.3.0.05 Standard : HSE Risk Reporting
1.3.4.01 Standard Identificazione aspetti ambientali significativi 1.3.4.02 Procedura Applicativa: Identificazione aspetti ambientali e valutazione della loro significativit 1.3.4.04 Standard: Environmental and Social Impact Assessment (ESIA) in E&P Operations

Module M.9 Environmental Management

Master HSE&Q

ENI Doc. 1.3.0.01: Organisation of the HSE and PS Integrated Management System

Module M.9 Environmental Management

HSE IMS

Master HSE&Q

Module M.9 Environmental Management

Master HSE&Q

Module M.9 Environmental Management

Master HSE&Q

Module M.9 Environmental Management

ENI Doc. 1.3.0.01: Organisation of the HSE and PS Integrated Management System

Master HSE&Q

SCOPE Every Subsidiary and Affiliated Company in Italy and abroad (hereinafter Company, Business Unit or Organization) shall implement its own HSE IMS in compliance with this Directive and with any other specific principles and requirements, depending on the Organizations business needs and the local context in which it operates.
Any Business Units HSE IMS shall: (a) consider the management of HSE aspects of its own activities and those undertaken in joint venture with other operators.

(b) report, justify and document the above-mentioned further principles and requirements in a dedicated Conformance Matrix.
(c) plan a periodical review in order to check and ensure full compliance the basic principles and requirements of the E&P Divisions HSE IMS.

Module M.9 Environmental Management

E&P Division: HSE IMS organisation

Master HSE&Q

Module M.9 Environmental Management

10

Master HSE&Q

Module M.9 Environmental Management

11

Master HSE&Q

Module M.9 Environmental Management

12

Master HSE&Q

Module M.9 Environmental Management

13

Master HSE&Q

Module M.9 Environmental Management

14

Master HSE&Q

Module M.9 Environmental Management

15

Risk management: example (see Directive)

Master HSE&Q

Module M.9 Environmental Management

16

Risk management: example (see Directive)

Master HSE&Q

Module M.9 Environmental Management

17

Master HSE&Q

Module M.9 Environmental Management

18

Master HSE&Q

Module M.9 Environmental Management

19

Master HSE&Q

HSE Risk Management Doc. N. 1.3.0.03

Module M.9 Environmental Management

20

HSE Risk Management Doc. N. 1.3.0.03

Master HSE&Q

Provides the assessment criteria to be used in the activities of Risk Evaluation and Identification of Reduction Measures. The tolerability of risk is referred to: People the health protection and promotion and safety of people involved in Eni E&P division operations and activities or of other people who could be affected by them. Critical Equipment Protecting Personnel - damage to or loss of equipment and facilities playing a vital role in protecting personnel from hazardous events. Environment damage to the environment deriving from operational activities or from incidents. Assets and Operations damage to the Companys assets and/or impacts on projects and/or production losses. Reputation damage to the business or to the License to Operate or to the overall value of the Company deriving from HSE risks; it includes, inter alia, the image.

Module M.9 Environmental Management

21

RISK AND CATEGORIES OF RISK


EVENT RISK

Master HSE&Q

Risk is a function of the likelihood of an event and the severity of its consequences. The risk from a particular event, the Event Risk is the HSE risk associated with a specific, discrete scenario (such as helicopter crash, transport accident, oil spill, etc.) in terms of effects on people, environment, assets and reputation and is usually assessed qualitatively. ENVIRONMENTAL RISK The Environmental Risk is the risk to the environment from different activities that fall under the responsibility of the Company. As a consequence, environmental risk management should take account of the exposure of the environmental resources to a variety of activities which constitute, as a whole, the sustainable development of the Company itself

Module M.9 Environmental Management

22

Master HSE&Q

Module M.9 Environmental Management

23

IDENTIFICATION OF HAZARDS AND EFFECTS

Master HSE&Q

The identification of potential HSE hazards and effects covers all phases of the Companys processes and related activities at the appropriate level of accuracy, taking also into account all phases in the life of any installation, including temporary conditions dictated by maintenance activities.
For each activity, the most significant hazards are identified and the likely effects are then assessed to determine whether each hazard is significant or not in relation to health, environment, assets and Company reputation Hazard
Anything with the potential to cause harm, including ill health or injury, damage to property, plant, products or the environment; production losses or increased liabilities. (OGP report 6.36/210, 1994 Guidelines for the development and application of health, safety and environmental management systems).

Module M.9 Environmental Management

24

RISK EVALUATION
(REF. HSE IMS B-1.3) Risk evaluation requires consideration of both the severity of the consequences of a potential hazard and the likelihood of their realisation. Each risk is assessed by consideration of the following factors: how often the hazard is likely to occur; the likelihood of the hazard resulting in an accident; the severity of the consequences.

Master HSE&Q

Such information can be retrieved from various sources, including: internal knowledge and experience of line / project / department managers and HSE experts; industry frequency and failure rate databases and co-operative research programmes; relevant international, national and Eni E&P Division standards and codes of practice; industry and trade association codes of practice and other guidance

Module M.9 Environmental Management

25

MEASUREMENT OF RISK

Master HSE&Q

In order to interpret risk to people, reputation etc. some means of measurement of risk is required. Since risk is in its simplest terms consequences times frequency, obvious types of measure may be: Fatalities / occupational illness per year ( risk to people) Spills per transfer operation (risk to the environment) Financial losses per year (asset losses) Apart from financial loss which is relatively easy to measure in risk terms, all other areas present problems. Environmental risk is particularly difficult to define except in terms of specific items such as spills as detailed above.

Module M.9 Environmental Management

26

MEASUREMENT OF RISK

Master HSE&Q

Environmental risk is particularly difficult to define except in terms of specific items such as spills as detailed above. Some of the problems with the measurement of environmental risk are described below: Some environmental discharges are continuous but have indeterminate effects Some environmental hazards are short term in duration but have long term effects changing over time Some environmental hazards may have quite different effects on for example, air quality, water quality and ecology, making a global measure of environmental risk difficult to define. These problems make the use of matrices discussed later, particularly helpful for environmental risk measurement.

Module M.9 Environmental Management

27

HSE Risk Management Doc. N. 1.3.0.03


Event Risk Screening Matrix:

Master HSE&Q

Provides definition of consequences and a range of qualitative criteria to estimate likelyhood / probability or frequency. This shall be used in the identification of high level HSE risks during risk screening (Major Hazard Analysis, Environmental Impact Assessment, etc.)

Module M.9 Environmental Management

28

HSE Risk Management Doc. N. 1.3.0.03

Master HSE&Q

Module M.9 Environmental Management

29

HSE Risk Mangement Doc. N. 1.3.0.03


committee for oil spills to sea and has been extended to on-shore activities too.

Master HSE&Q

Environmental risks: Matrix derived from a document prepared by OLFs environemental

Module M.9 Environmental Management

30

HSE Risk Mangement Doc. N. 1.3.0.0

Master HSE&Q

Module M.9 Environmental Management

31

RISK REGISTERS

Master HSE&Q

From the risk identification process a list of significant risks should be identified and transferred to Risk Registers for that particular project / operating unit. The Risk Registers should demonstrate that: all hazards, effects and threats have been identified the likelihood / probability / frequency and consequences of a hazardous event have been assessed controls to manage potential causes (threatened barriers) are in place recovery preparedness measures to mitigate potential consequences have been taken. The Risk Register is a live document and is passed from phase to phase of a development through to abandonment. The purpose of the Risk Registers is to provide an assurance process that demonstrate appropriate and effective controls are in place. A Risk Register Proforma is included in Appendix D.

Module M.9 Environmental Management

32

Master HSE&Q

Module M.9 Environmental Management

33

Master HSE&Q

Module M.9 Environmental Management

34

Master HSE&Q

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04

Module M.9 Environmental Management

35

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04
Company operations can be broken down in four main areas of activity: 1. Exploration (e.g. Seismic, drilling of exploration wells) 2. Development (e.g. construction, drilling of development wells, piping installation) 3. Production.(e.g. plant and facility operations, revamping, etc) 4. Decommissioning

Master HSE&Q

The highest complexity of impact assessment studies, in terms of environmental components, technical challenges, stakeholders engagement and costs can be found in type 2 and 3 activities (development and production). A list of project activities with some examples of associated impacts (not exhaustive) is illustrated in Annex A.

Module M.9 Environmental Management

36

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04

Master HSE&Q

Module M.9 Environmental Management

37

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04

Master HSE&Q

Module M.9 Environmental Management

38

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04

Master HSE&Q

Module M.9 Environmental Management

39

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04

Master HSE&Q

Module M.9 Environmental Management

40

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04

Master HSE&Q

Module M.9 Environmental Management

41

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04
RATIONALE OF AN E(S)IA The basic technical goal of any E(S)IA process is to predict, evaluate and mitigate the impacts due to a proposed project. The HSE Manager is responsible for ensuring that the environmental and social issues are integrated in a timely and cost-effective way during project preparation and implementation

Master HSE&Q

Prediction Prediction of the magnitude of impacts requires the use of specific techniques and tools (e.g. HazId, HazOp, Risk Assessment, models for the dispersion of contaminants in air and water, etc...). Evaluation Evaluation of the significance and acceptability of the impacts needs a threshold level to be taken as a reference exceeded which the environmental damage is considered unacceptable and the proposed project is environmentally incompatible.

Module M.9 Environmental Management

42

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04
RATIONALE OF AN E(S)IA (cnt)

Master HSE&Q

In defining this threshold level, it is necessary to refer to country regulations first, apply Company standards and then consider the following criteria:

Magnitude and Intensity: defined as the potential to affect a wide area, a large number of receptors, or affect receptors with a significant intensity.
Duration (short term/long term): evaluated considering the time span of duration of the activity causing the impact. Sensitivity of Receptors: characteristic that describes the level of resilience of the environment to the considered impacts. Reversibility of the Impacts: defined as the potential to cause temporary or permanent changes to any aspect of the environment. Comparison with legal requirements, policies and standards.

Module M.9 Environmental Management

43

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04
RATIONALE OF AN E(S)IA (cnt)

Master HSE&Q

Mitigation Mitigation measures will be built into the design phase through continuous interaction between the engineering design process and the predict/evaluate/mitigate sequence in the E(S)IA process.

The aim is to avoid or minimize as many of the potentially significant environmental and social impacts as practicable, while enhancing the positive benefits of the project wherever possible. This is achieved by assessing a wide range of options against numerous criteria including environmental and social impact, safety, technical feasibility, cost, and stakeholder concerns.

Module M.9 Environmental Management

44

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04
Mitigation

Master HSE&Q

Module M.9 Environmental Management

45

Environmental and Social Impact Assessment (ESIA) in E&P operations Doc. N. 1.3.4.04

Master HSE&Q

Monitoring The last key element of the E(S)IA process is the monitoring programme, voluntarily defined by the Company or required by regulators. This will bridge the gap between the predict/evaluate/mitigate sequence of the E(S)IA process and the inclusion of the findings/commitments in the HSE-IMS. It also sets elements for the monitoring environmental/social impacts of the project and/or the effectiveness of mitigation measures. The monitoring programme should continue throughout the entire lifecycle of the project until decommissioning and restoration take place. Specifically, it provides: a specific description and technical details of monitoring measures, including: parameters to be tracked, methods to be used, sampling locations, frequency of measurements and definition of thresholds that will signal the need for corrective actions, and monitoring and reporting procedures to ensure early detection of conditions that necessitate particular mitigation measures and to provide information on the progress and results of mitigation.

Module M.9 Environmental Management

46

Environmental Assessment Impact studies

Master HSE&Q

In general, depending on the type, location, sensitivity of projects and on the nature and magnitude of their potential impacts, different types of instruments can be used to satisfy E(S)IA requirements and to report the E(S)IA process and its findings. 1. Environmental Screening 2. Scoping 3. Preliminary Environmental Impact Assessment 4. Environmental Impact Assessment 5. Environmental and social impact assessment 6. Strategic Environmental Impact Assessment

Module M.9 Environmental Management

47

1. Environmental Screening

Master HSE&Q

An Environmental Screening is performed, basically, for activities whose potential impacts are marginal. These impacts are site-specific, usually reversible and in most cases mitigation measures can be designed in advance.

The Environmental Screening should be carried out in order to: describe the environmental sensitivity of the area affected by the project; provide an analysis of the main case histories related to projects that caused similar HSE issues and/or impacts; provide an analysis of the potential significant HSE hazards related to the projects.
The final document is a report aimed at focusing on a projects potential environmental effects which are considered to be minimal or not requiring the development of a full E(S)IA report. It may vary from project to project, providing full and detailed justification for the levels and approaches chosen for the particular project or site. .

Module M.9 Environmental Management

48

Content of an Environmental Screening


Analysis of geographic location

Master HSE&Q

Describes the projects technical, geographic, environmental and temporal context, in order to provide an understanding of the environmental sensitivity of the area involved. Available data will be collected from bibliography and completed by a specific survey in the field. In particular, the following will be provided: brief description of the project geographical data about the dimension of the area involved (including land maps) information about the territorial administrative framework (including identification of main land uses and any protected areas, and development of relative thematic maps) HSE issues such as a brief characterization of water resources, geology and soil, ecosystems, landscape, public health and social-economic aspects.

Module M.9 Environmental Management

49

Content of an Environmental Screening


Analysis of historical precedents Analysis of the main case histories related to similar projects which caused HSE issues. Analysis of Known Hazards

Master HSE&Q

Provide an identification of potential significant HSE hazards related to the projects on the basis of the following criteria: Magnitude and Intensity: defined as the potential to affect a wide area, a large number of receptors, or affect receptors with a significant intensity; Duration (short term/long term): evaluated considering the time span of duration of the activity causing the impact; Sensitivity of Receptors: characteristic that describes the level of resilience of the environment to the considered impacts; Reversibility of the Impacts: defined as the potential to cause temporary or permanent changes to any aspect of the environment; Comparison with legal requirements, policies and standards.

Module M.9 Environmental Management

50

2. Scoping

Master HSE&Q

The scoping process is carried out in order to identify specific HSE issues and to develop the Terms of Reference (TOR) for the E(S)IA report. Scoping is a specialist activity that requires evaluation of the project proposal, a review of potential environmental/social hazards and their significance and an appraisal of the most appropriate techniques for impact prediction. Therefore, during this phase, likely environmental/social impacts are qualitatively identified and the projects area of influence is preliminarily defined. As a part of this process, information about the project and its likely environmental/social effects is provided to local stakeholders, including local authorities, affected communities and NGOs, followed by consultation with stakeholder representatives. The main purpose of consultation is to focus the E(S)IA on issues of concern at a local level.

Module M.9 Environmental Management

51

3. Preliminary EIA

Master HSE&Q

The main aims of a Preliminary EIA report are to: characterize the sensitivities of the area affected by the project; identify main hazards and evaluate impacts; define a strategy to avoid potential significant impacts on the identified sensitive locations; highlight relevant legislative constraints. It is usually carried out according to Company Project Management System in the early project phase (feasibility/concept selection), with a lower level of detail than a full EIA report and is not submitted to authority for approval. In addition, it could outline requirements for possible specific studies to be performed in the following phases (e.g. Full EIA report).

Module M.9 Environmental Management

52

Content of a Pre-EIA Report

Master HSE&Q

A Preliminary EIA report is conducted in order to provide an analysis of project alternatives in the early project phase (feasibility). This task will be performed by collecting available environmental data from bibliography and providing a description of the sensitivities of the area affected by the projects and an evaluation of the relevant environmental constraints. The analysis of alternatives will define requirements for specific studies to be performed in the following phase (Full EIA). The Pre-EIA report includes the following topics, as minimum: Executive Summary: presents significant findings and recommended actions. Sponsor presentation: briefly describes the sponsors policy and activities and explains how the proposed project fits in with them. Description of policy, legal and administrative framework: defines the policy, legal, and administrative framework within which the Pre-EIA is carried out. Includes the description of applicable international agreements (including transboundary issues), national and regional instruments, production sharing contracts, applicable mining codes, land and nature protection codes. Project description: concisely describes the proposed project alternatives in their early phases (feasibility) and includes maps showing the projects sites and areas of influence.

Module M.9 Environmental Management

53

Content of a Pre-EIA Report

Master HSE&Q

Environmental description: assesses the dimensions of the area involved in the project and describes the existing physical, biological and socio-economic conditions in order to provide an understanding of the quality of the potentially affected environment. Data should be relevant to decisions about project location, design, operations or mitigation measures. Available data on terrestrial and marine environments will be collected from bibliography and satellite images and if necessary supplemented by field reconnaissance surveys. Information to be provided for onshore projects includes: Meteorology: meteorological data recorded by the closest meteorological stations (air temperature and humidity, rainfall, winds including seasonal and annual wind roses, stability classes statistics, visibility, site-specific parameters). Air Quality: air quality data from Local Air Quality Guidelines, if existing, and/or air quality monitoring networks and values (including, but not limited to, particulate matter, nitrogen oxides, sulphur oxides, and volatile organic compounds); identification and description of the most probable receptors.

Module M.9 Environmental Management

54

Content of a Pre-EIA Report


Land Use: identification of main land uses and any protected areas, and development of relative thematic maps. Geology and Soil:

Master HSE&Q

geologic and geomorphologic characterization (including the identification of the main land features, such as slope, landslides, slope instability and surface expression of faults); soil characterization (describing types and quality); geotechnical characterization; geohazards (including landslides, seismic risk and subsidence).

Water resources:
Surface Water: hydrographic, hydrologic and hydrochemical characterization of the main surface water bodies; characterization of the aquatic ecosystem situated in the area of influence (including sediment quality); Groundwater: hydrogeological characterization of groundwater and its usage, identifying recharge areas, springs, mean groundwater depth and predominant flow direction, hydraulic conductivity of main formations, vulnerability degree, groundwater hydrochemistry, well location and depth.

Module M.9 Environmental Management

55

Content of a Pre-EIA Report

Master HSE&Q

Vegetation, Biota and Ecosystems: characterization of flora and vegetation; characterization of fauna; description of potential critical and sensitive elements, protected, rare and endangered species (including breeding seasons, migratory routes, etc); characterization of the ecosystems with identification of the main ecological corridors; identification of potential criticalities related to anthropic pressure. Landscape and Cultural Heritage: characterization of the main morphological, historical-archaeological and cultural aspects of the territory. Noise and Vibration: characterization of noise and vibration in the area of interest and identification and description of potential receptors. Public Health: characterization of public health conditions in the area of influence of the project; Socio-Economic Aspects: political organization, population and demographic characteristics, employment profile, economy and production activities, household income, infrastructure and services (water, sewage and waste management, electricity, roads and communications), health system and pressure factors, education, poverty indicators, civil society (NGOs), land rights and landholding, culture, religion, tradition and tourism. These aspects are to be analysed in a very in-depth way only in the Pre-ESIA report.

Module M.9 Environmental Management

56

Content of a Pre-EIA Report

Master HSE&Q

Information to be provided for offshore projects includes: Meteorology: meteorological data recorded by the closest meteorological stations (air temperature and humidity, rainfall, winds including seasonal and annual wind roses, stability classes statistics, visibility, site-specific parameters). Oceanography: data about bathymetry, sea temperature, ocean circulation and currents, upwelling and tides. Coastal Environments: characterization of shoreline and coastal areas (including photographic interpretation of satellite images, if available). Marine Habitat:
Sediment: physiochemical characterization of the seabed; Water: physiochemical characterization of the water column to identify any stratification phenomenon, define its richness and primary productivity levels and evaluate its quality conditions; Ecosystems: characterization of the biological environments (including information about fish communities, migration and breeding times; fish nursery areas, plankton and benthic communities, birds and other marine species of importance).

Socio-Economic Aspects: general information about the site (e.g. geographic position, number
of inhabitants/families, etc., as for onshore projects); specific information about fisheries (e.g. intensity of fishing activities in the area, including industrial and handcraft, fishing agreements, number of fishermen/boats, type of fish caught, fish production and marketing, fishing season, etc.); information about existing oil & gas activities in the area, port activities, shipping and transport, tourism. These aspects are to be analysed in a very in-depth way only in the Pre-ESIA report. . Module M.9 Environmental Management

57

Content of a Pre-EIA Report

Master HSE&Q

Environmental impact assessment: for each project alternative, identifies and assesses positive and negative potential impacts. Identifies mitigation measures and any residual negative impacts that cannot be mitigated. Proper large-scale indicators useful in the assessment of the significant potential impacts will be selected from different project alternatives for each environmental component.
Comparison of alternatives: summarises project alternatives, comparing them and stating the basis for project selection. Conclusions: defines requirements for specific studies to be performed in the following phase (Full EIA) for the selected project. Appendixes: should include the following items:
List of people involved in the Pre-EIA report preparation (individuals and organizations); Project outlines and documents, used and/or produced cartographies; Tables presenting important data referred to or summarized in the main text; References: list of bibliographic materials used in the study preparation.

Module M.9 Environmental Management

58

Environmental Impact Assessment

Master HSE&Q

An Environmental Impact Assessment (EIA) report is a tool aimed at identifying and assessing potential environmental impacts of a proposed project on the relative area of influence, at evaluating alternatives and at designing appropriate mitigation, monitoring and management measures. An EIA report is carried out in order to define specific legislative constraints: systematic examination of all relevant applicable legislation and associated codes of practice, all current and applicable standards and all contractual agreements; identify key environmental sensitivities in terms of nature conservation value or local interest, relevant to the area involved in the project (e.g. climatic conditions, water quality, groundwater, surface water, sea water, air quality, GHG emissions, noise and vibration, accidental pollution, biodiversity, land use, geology and soil, subsidence); analyse the projects environmental disturbance on the receiving environment and the significance of the environmental effects, using predefined acceptance criteria; indicate actions to avoid and/or reduce environmental impacts, identifying mitigation measures and designing proper methods to monitor environmental effects.

Module M.9 Environmental Management

59

Environmental and Social Impact Assessment (ESIA)

Master HSE&Q

An Environmental and Social Impact Assessment (ESIA) report is focused on the potential impacts of a proposed project on both the environment and communities (often restricted to socio-economic impacts). It is also aimed at evaluating alternatives and at designing appropriate mitigation, monitoring and management measures. The ESIA analysis is largely based on a sectorial approach, with three main segments: environmental, social and integrated environmental-social. The integrated aspects to be covered in the ESIA will include an evaluation of the impacts of a proposed project on the general social and environment issues, encompassing health, safety, economic well-being, social and local development, cultural heritage, institutional context, etc. It should be emphasized that the ESIA represents the natural evolution of the EIA report, from a strictly technical tool toward an extensive instrument also able to analyse development prospects and recommend options, including development activities based on environmental and social sustainability criteria.

Module M.9 Environmental Management

60

Environmental and Social Impact Assessment (ESIA)

Master HSE&Q

The specific objectives of an ESIA report are to: define specific legislative constraints through systematic examination of all relevant applicable legislation/standards/agreements and associated codes of practice; identify key sensitivities in terms of environmental value or local interest and regarding local communities potentially affected and/or involved in the project activities; assess the environmental, economic, and social impacts of the project on local communities and, if appropriate, on the region and society in general; analyse and recommend how positive effects might be increased and negative impacts avoided and/or reduced, identifying mitigation measures and designing proper monitoring methods. In particular, a useful document to be taken into consideration is the Eni Guide on Social Impact Assessment (2006) that provides a methodology and a framework of concepts to help and support Eni operating units in addressing social issues within its activities, designing an approach to be adapted to specific Eni needs and local features.

Module M.9 Environmental Management

61

Strategic Environmental Impact Assessment (SEIA)

Master HSE&Q

SEIA is an appraisal procedure that examines the likely environmental impacts of proposed policies, programmes and plans. Strategic Environmental Impact Assessment is applied by the public sector (governments, regional administration) to assess the implication of policies, plans and programmes. It may be applied at national and regional level. In specific strategic projects a SEIA can be conducted on a voluntary basis by the Company when the project to be developed is economically, socially and environmentally sensitive and has the potential for significant long term and large scale positive/negative impacts.

Module M.9 Environmental Management

62

Project Classification Matrix

Master HSE&Q

Module M.9 Environmental Management

63

Glossary

Master HSE&Q

Ecosystem A dynamic complex of plant, animal and micro-organism communities and their non-living environment interacting as a functional unit (Convention on Biological Diversity, CBD, 1992) Environment Surroundings in which an organization operates, including air, water, land, natural resources, flora, fauna, humans and their interrelation (ISO 14001:2004) Environmental Impact Any change to the environment, whether adverse or beneficial, wholly or partially resulting from an organizations environmental aspects (ISO 14001:2004)

Environmental Impact Study Study included in a process which makes environmental considerations an integral part of project preparation; the study must identify possible impacts on environment and proper mitigation measures in order to fulfil all environmental compatibility requirements.

Module M.9 Environmental Management

64

Master HSE&Q

Habitat The place or type of site where an organism or population naturally occurs (Convention on Biological Diversity, CBD, 1992) Hazard Anything with the potential to cause harm, including ill health or injury, damage to property, plant, products or the environment; production losses or increased liabilities. (OGP report 6.36/210, 1994 Guidelines for the development and application of health, safety and environmental management systems) Source, situation, or act with a potential for harm in terms of human injury or ill health (3.8), or a combination of these (OHSAS 18001:2007).

Risk Combination of the likelihood of an occurrence of a hazardous event or exposure(s) and the severity of injury or ill health that can be caused by the event or exposure(s) (OHSAS 18001:2007)

Module M.9 Environmental Management

65

Master HSE&Q

Sensitive Impact Impact that may be irreversible or affect vulnerable groups or ethnic minorities, involve involuntary displacement or resettlement or affect significant cultural heritage sites (OP 4.01 The World Bank Operational Manual abridged) Short-term impact Any immediate change to the environment that lasts only for a limited period and will cease on completion of the activity as a result of mitigation measures, natural recovery or source removal Stakeholder Individuals and organisations that are actively involved in the project or whose interests may be positively or negatively affected as a result of project execution or project completion. They may also exert influence over the project and its results Long-term impact An impact that will continue over an extended period.

Module M.9 Environmental Management

66

ESIA in E&P operations Doc. N. 1.3.4.04


ALARP As Low As Reasonably Practicable BAT Best Available Technologies DMS Development Management System EIA Environmental Impact Assessment EIS Environmental Impact Statement EMP Environmental Management Plan EMS Exploration Management System ESIA Environmental & Social Impact Assessment HSE Health Safety Environment IMS Integrated Management System OMS Operations Management System OPDS Opportunity and Project Development System OPES Opportunity and Project Exploration System OPOS Opportunity and Project Operations System SEIA Strategic Environmental Impact Assessment TOR Term Of Reference

Master HSE&Q

Module M.9 Environmental Management

67

Master HSE&Q

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Module M.9 Environmental Management

68

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

The Eni E&P Management Systems (MS) provide a common framework to be implemented for the hydrocarbon field Exploration and Development Processes in the Exploration & Production (E&P) Division. This framework aims to optimise, along the entire assets life, all project activities in order to reduce the overall Company Time to Market. It also provides rules and operating tools to add value to the Processes in place. The main objectives of the Management Systems are: to increase project team performance; to provide a set of Best Practices for managing explorative and development projects; to set a common language within the Division in accordance with international standards; to identify operative tools to collect, share and use E&P know-how.

Module M.9 Environmental Management

69

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

The EMS is structured as follows: The OPES (Opportunity & Project Exploration System) defining what is required and when during the exploration process Three supporting systems to define how those requirements can be met.

Module M.9 Environmental Management

70

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

The DMS is is constituted by two main elements: The OPDS (Opportunity & Project Development System) stating what is required and when during the Development process in terms of general governance and road map; Three supporting systems to define how those requirements can be met.

Module M.9 Environmental Management

71

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Technology Management System The Technology Management System (TMS) is one of the three supporting systems that constitute both the EMS and DMS. The Technology Management System provides a comprehensive and structured set of knowledge and an integrated framework to manage and execute technical activities, thus ensuring an effective and efficient use of the Companys resources. Scope and Objectives A.1.1 TMS Scope The TMS describes the technical activities to be executed during exploration and development projects. The system is structured on seven areas, covering different technical competencies:

Module M.9 Environmental Management

72

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Exploration: general co-ordination activities, exploration potential generation and evaluation Drilling & Completion: exploration well planning, executing, testing and abandoning, wells pre-feasibility and feasibility, wells engineering, drilling and completion execution management, production optimisation and well intervention Geology & Geophysics: geological and geophysical activities for reservoir study, support in exploration well and wells definition and execution Facilities: facilities pre-feasibility and feasibility studies, basic design, front-end engineering design, detailed engineering, construction, installation, precommissioning and commissioning Health, Safety, Environment: environmental and health impact assessments,risks analysis, definition of health and safety measures and emergency plan Operations: production and maintenance management Reservoir: reservoir static and dynamic model definition, reservoir management

Module M.9 Environmental Management

73

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Module M.9 Environmental Management

74

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

TMS Objectives The primary objectives of TMS are: To standardise project technical activities performed by each professional area setting best practices To integrate project technical activities within a unique framework To align project technical activities with OPDS objectives and guiding principles The TMS is not intended to be a fully prescriptive system, which attempts to formalise and to document every activity on the Project. The TMS provides comprehensive and structured knowledge and a unique integrated framework for technical activities execution and management.

Module M.9 Environmental Management

75

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Module M.9 Environmental Management

76

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Module M.9 Environmental Management

77

HSE Workflows Overview - Exploration

Master HSE&Q

Module M.9 Environmental Management

78

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

EXPLORATION: Workflow Environmental Impact Assessment Description The Environmental Impact Assessment workflow, in the following EIA, is implemented, with differences, in the following OPES phases: Pre-drill Exploration

Drill & Post-Drill Evaluation


The workflow is executed within the HSE Area in cooperation with other functional areas. It is aimed at the definition of possible actions for environmental mitigation and optimisation (cost/benefits) from an environmental point of view.

Module M.9 Environmental Management

79

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Workflow Environmental Impact Assessment The objectives of the EIA workflow are the following: define the specific legislative constraints; to identify the legislative context relevant to the area involved in the project. define the specific environmental sensitivities of the area; in terms of nature conservation value or local interest relevant to the area involved in the project identify and analyse the project environmental disturbance on the receiving environment; possible positive and/or negative impacts of the exploration project. evaluate most significant environmental impacts and indicate the actions to reduce them. This step defines the most suitable methodologies for impacts assessment and the characteristics of the monitoring plan of the project

Module M.9 Environmental Management

80

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Activities description The workflow consists of 4 steps, connected in different ways (serial, parallel, connection/exchange with other workflows). The Environmental Impact Assessment workflow, in the following EIA, is implemented, in the Pre-drill Exploration and Drill & Post-Drill Evaluation phases of a exploration project (as defined within OPES).

Module M.9 Environmental Management

81

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Activities description In general, depending on the type, location, sensitivity of the projects and on the nature and magnitude of their potential impacts, after a preliminary screening process or for national legislation requirements, exploration projects should be followed by two different documents as regards: An Environmental Screening is performed, basically, during the Pre-drill Exploration phase, for activities whose potential impacts on environmentally important areas are not really adverse. These impacts are site-specific, usually reversible and in most cases mitigatory measures can be designed in advanced. This document is a limited environmental impact assessment that may vary from project to project, providing full and detailed justification for the levels and approaches chosen for the particular project or site.

Module M.9 Environmental Management

82

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

An Environmental Impact Assessment is performed, basically, during Drill & Postdrill Evaluation phase for activities whose potential impacts on environmentally important area could be more significant, even if they are reversible and site-specific at the same time.

Most of all, this occurs when the project is located in particular sensitive areas. The objectives of the EIA are to examine the projects potential negative and positive environmental impacts, to compare them with those of feasible alternatives and to recommend any measures needed to prevent, minimize, mitigate or compensate for adverse impacts and improve environmental performance.
Main input and output Well Planning Start-up Well Programme Definition Risk Assessment The outputs of the workflow are the following: Environmental screening or Environmental Impact Assessment

Module M.9 Environmental Management

83

Development: HSE Workflows Overview

Master HSE&Q

Module M.9 Environmental Management

84

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Development: Workflow Strategic Impact Assessment The Strategic Impact Assessment (in the following SIA) is carried out only for Strategic Development Projects when the development of the field is economically, socially and environmentally sensitive and has the potential for significant long-term positive and/or negative impacts. The Strategic Impact Assessment workflow is implemented only in the Evaluation phase. The workflow objectives consist in the evaluation of potential socio-economic, health and environmental impacts of a project, considering also related activities (both planned and existing). The SIA is not executed within the HSE Area alone because socio-economic considerations are produced in cooperation with other areas. Objectives of the SIA workflow are the following: to define the preliminary physical and socio-economic scenario of the project; to evaluate the possible socio-economic, health and/or environmental effects of the project; to demonstrate the net positive and/or negative impacts.

Module M.9 Environmental Management

85

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Activities of Strategic Impact Assessment: three steps

The key inputs of the workflow are the following: definition of the physical and socio-economic scenario of the project: usually all information is gathered from stakeholder, objectives statement of the project and geopolitical consideration; evaluation of possible socio economic, environmental and health effects of the project: local territory information; demonstration of net positive and/or negative impacts. The key outputs of the workflow are the following: Socio - Economic Study; Environmental Study; Health Impact Assessment report Impacts report;

Module M.9 Environmental Management

86

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Workflow Environmental Impact Assessment


The Environmental Impact Assessment workflow, in the following EIA, is always implemented, with some differences, in the following OPDS phases: Concept Selection; Concept Definition. The workflow is executed within the HSE Area in cooperation with other functional areas (Facilities, Drilling and Completion, Reservoir areas). It is aimed at the definition of possible actions for environmental mitigation and optimization (cost/benefits) from an environmental point of view. The objectives of the EIA workflow are the following: to define the specific legislative constraints; to define the specific environmental sensitivities of the area; to analyse the project environmental disturbance on the receiving environment; to indicate the actions to reduce environmental impacts.

Module M.9 Environmental Management

87

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

The workflow consists of 4 steps, connected in different ways (serial, parallel, connection/exchange with other workflows).

Inputs Wells engineering Basic Design Outputs Preliminary EIA for Concept Selection phase Full EIA for Concept Definition phase

Module M.9 Environmental Management

88

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

In the Concept Selection phase the workflow is executed with a lower level of details and in this phase it refers mainly to the activity denominated Preliminary EIA. The main objectives of Preliminary EIA are: the description of the sensitivity of the area involved by the project the evaluation of the relevant legislative constraints. The Preliminary EIA refers to the strategies for avoidance of significant impact on the identified sensitive locations. It anticipates also environmental constraints upon the type, routing and construction of oil and gas transport facilities. It defines requirements for possible specific studies to be performed in the following activities. In the Concept Definition the main activity is the full EIA. The EIA supports the definition of design solutions of environmental technologies required to mitigate impacts and improve environmental management practices.

Module M.9 Environmental Management

89

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Definition of the specific legislative constraints The workflow begins with the evaluation/identification of the legislative context relevant to the area involved in the project. The Legislative Analysis is basically carried out in the Concept Selection phase while in the Concept Definition phase it involves only possible updating. The evaluation/revision is carried out identifying applicable laws, standards, etc A systematic examination includes compliance as a minimum with: all relevant applicable legislation and associated codes of practice; all current and applicable standards; all contractual agreements. Definition of the specific environmental sensitivities of the area The main objective of this step is to identify the environment sensitivities in terms of nature conservation value or local interest relevant to the area involved in the project. This activity implies a thorough identification and prioritisation of key environmental sensitivities, such as:

Module M.9 Environmental Management

90

Key environmental sensitivities


climatic conditions; water quality; groundwater; surface water; sea water; air quality; greenhouse gas emissions; noise and vibration; accidental pollution; - offshore; - onshore; environmental infrastructure: - water resource management and infrastructure; - waste disposal capacity; legacy pollution; biodiversity (marine, terrestrial); land use offshore structures, onshore plant & pipelines; geology and soil (geologic/geomorphologic/soil/geotechnical characterization; geohazards (including landslides, seismic risk and subsidence)

Master HSE&Q

Module M.9 Environmental Management

91

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Analysis of the project environmental disturbance on the receiving environment. Project impact analyses This step identifies any modification to the environment, positive or negative, partial or total, produced by the project. A preliminary identification of possible impacts, for each possible project option is performed during the Concept Selection phase. A full identification of impacts is carried out during the Concept Definition phase. Analyses of the significance of the estimated impact This step defines the most suitable methodologies for impacts estimation and the characteristics of the monitoring plan of the project. The analysis is curried out in the following way: assessment of significance of the environmental effects using predefined acceptance criteria; identification of mitigating measures; design of proper methods to monitor environmental effects.

Module M.9 Environmental Management

92

Development: HSE Workflows Overview

Master HSE&Q

Module M.9 Environmental Management

93

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Workflow Environmental Analysis The Environmental Analysis workflow is implemented in the Execution and Production and Clouse Out phases of OPDS. The workflow is executed by HSE Area with the cooperation of Facilities and Drilling & Completion areas. The objective of the Environmental Analysis workflow is the characterization of the environmental aspects of the activities and evaluation of their significance, aimed at correctly managing such aspects in the framework of the HSE-QR Integrated Management System (UN ENI ISO 14001 Standard for Environment). The workflow consists of 3 steps, connected in different ways (serial, parallel, connection/exchange with other workflows).

Module M.9 Environmental Management

94

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Module M.9 Environmental Management

95

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Characterization of all environmental aspects of the activities This step is aimed at correctly characterising the activities/operations that may have a significant adverse effect on the environmental performance. The characterization is based on a detailed analysis of all environmental aspects to identify the main impacts. For each activity/operation, information is gathered on environmental aspects, including: land use; waste production; air emissions; visual effects; noise; other relevant environmental effect The action is aimed at identifying all the elements, which may be affected by a potential HSE hazard that could arise from each activity and from the materials, which are used.

Module M.9 Environmental Management

96

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

Evaluation of the legislative and policys constraints The scope of this step is to evaluate systematically and regularly all legal requirements and the ones which may influence the different phases of every development project. The most important action is to verify periodically the activities conformance to the applicable laws and internal standards. HSE Policy, companys standards and strategic objectives can supplement and, in some cases, exceed the legislative requirements in establishing more challenging constraints. Evaluation of the environmental significance of the aspects The goals of this step are: verification of compliance with all applicable requirements; the identification of methods and procedures aimed at ensuring the minimisation of environmental impacts (harmful discharges, emissions, wastes, etc.) from operative activities (involving Company, Contractors and stakeholders) and an efficient use of energy and natural resources.

Module M.9 Environmental Management

97

Technology Management System- HSE Handbook


Doc. N.SVI.TMS.MA.0004.000

Master HSE&Q

The main inputs of the workflow are the following: Environmental Impact Assessment; HSEQ Plan; Project development plan; Wells Programs; Construction, Installation and Pre-commissioning Plans.

The outputs of the workflow are the following: Environmental Register; Environmental procedures.

Module M.9 Environmental Management

98

Technical Support Processes: environmental issues

Master HSE&Q

Waste Management Decommissioning and reclamation Oil spills contingency planning and remediation .

Module M.9 Environmental Management

99

Waste Management

Master HSE&Q

Responsible and effective waste management seeks, in a structured manner, to minimise the risk of HSE incidents and liabilities which may be caused by waste. A very important process of waste management is the periodical and systematic review of the principles to prevent, reduce, reuse and recover waste material. Equally important is the structured assessment of potential HSE hazards and effects. Usually the risk of liability can be eliminated or substantially reduced if waste is transferred to duly authorised, certified and regularly audited waste transporters and disposal facilities in accordance with applicable legislation. In most jurisdictions, but not all, this will be sufficient for a waste generator to discharge his responsibility to exercise "due care" in handling or disposing of waste.

Module M.9 Environmental Management

100

Waste Management

Master HSE&Q

Proper management of wastes begins with pollution prevention. Pollution prevention refers to the elimination, change or reduction of operating practices which result in discharges to land, air or water.

This principle is incorporated into the design and management of E&P facilities and the planning of associated activities. If elimination of waste is not possible, then method to minimise the amount of waste generated are investigated.

Responsible waste management is accomplished through hierarchical application of the practices of source reduction, reuse, recycling, recovery, treatment and responsible disposal.

Module M.9 Environmental Management

101

Waste Management

Master HSE&Q

Source Reduction - the generation of less waste through more efficient practices such as: material elimination inventory control and management material substitution process modification improved housekeeping. Reuse - the use of materials or products that are reusable in their original form such as: chemical containers

Module M.9 Environmental Management

102

Waste Management

Master HSE&Q

Recycling/Recovery - the conversion of wastes into usable materials and/or extraction of energy or materials from wastes. Examples include: recycling scrap metal recycling drilling muds using cleaned drill cuttings for road construction material recovering oil from tank bottoms and produced water Treatment - the destruction, detoxification and/or neutralisation of residues through processes such as biological methods; composting, tank based degradation thermal methods; incineration, thermal desorption chemical methods; neutralisation, stabilisation physical methods; filtration, centrifugation.

Module M.9 Environmental Management

103

Waste Management

Master HSE&Q

Responsible Disposal - depositing wastes on land or in water using methods appropriate for a given situation. Disposal methods include: Landfilling Burial surface discharge landspreading or landfarming underground injection. The potential ecological sensitivity of the location of operations is a key issue for the selection of an appropriate management practice of specific waste. Information on geology, hydrology, climate and biological communities must support and adjust the choice of the preferred waste management option.

Module M.9 Environmental Management

104

Decommissioning and reclamation

Master HSE&Q

The term decommissioning means the whole process whereby parts of facilities, such as platforms or plants or equipment, are closed, made safe, removed, since the production of hydrocarbons from the reservoir has become unprofitable. The removal of all equipment/facilities of industrial sites no longer productive must be followed by reclamation, i.e. restoring the location as it was before starting exploration and production activities. Accordingly to local legal constraints and to contractual undertakings to be verified in each case, it is a common practice to prepare a detailed decommissioning program to be communicated and/or submitted to the involved Authority and/or Joint Venture partners. After decommissioning the options are: total removal and transportation to an authorized site for disposal removal and reuse in another site reuse in situ for purposes other than oil&gas production.

Module M.9 Environmental Management

105

Decommissioning and reclamation

Master HSE&Q

Provided that all possible legal constraints are fully met (i.e. obtaining the necessary authorizations), possible removal alternatives are analyzed according to the following factors, in accordance with the Best Practicable Environmental Option (BPEO) analysis technique:
environmental impact consumption/emission balance safety health impact assessment of technical feasibility of other purpose reuse costs

These factors are in turn influenced by many elements. The usual practice is to divide the decommissioning project into two main stages from the impact point of view: "operational" stage, i.e. the environmental effects of removal operations "end-point" stage, i.e. the impacts on the new destination (e.g., in the case of partial removal, those associated with the slow and long-term deterioration of facilities remaining on site).

Module M.9 Environmental Management

106

Decommissioning and reclamation

Master HSE&Q

During transportation and storage, environmental impacts are related to emissions, discharges and possible leakage connected with the operating activities and hence shall be evaluated in relation to the receiving environment. Decommissioning operations are generally similar to those for facilities installation. Like installation operations, decommissioning work needs to be carefully engineered and specific procedures should be followed since, in most cases, the facilities to be removed are approaching the end of their working life and hence it is necessary to consider all modifications that have taken place over time. The different methodologies for removal, and the subsequent final destination, depend on a number of different factors such as:
type of structure or plant, dimensions and weights, for offshore plants distance from the coast or the nearest area for disposal, weather and oceanographic conditions, and complexity of the operations

Module M.9 Environmental Management

107

Decommissioning and reclamation

Master HSE&Q

Another key factor to be kept in mind when selecting the removal method is that of worker safety. In particular, the following should be evaluated: the uncertainty surrounding the weight and centre of gravity location of the elements to be lifted; the presence of liquids or gas in the tanks or pipelines, which in addition to constituting a weight increase, can also be hazardous for workers or polluting for the environment; any reduction of the strength of structural components, which can deteriorate as a result of corrosion or have undergone fatiguing load cycles. The assessment of the above factors, with rare exceptions, does not allow, h however, the complete actual situation to be determined and ascertained. It is therefore necessary to assess the risks and take every precaution to minimize these risks that the approximate knowledge of the structure to be removed can entail. Accordingly to local legal constraints, to be verified in each decommissioning project, it is therefore recommended (and in many countries will be mandatory): to include in the decommissioning project a detailed plan for restoring the area; to request local Authority to approve and/or authorize the "general plan of interventions" before the start up of the works.

Module M.9 Environmental Management

108

Oil spills contingency planning and remediation

Master HSE&Q

Efficiency in responding adequately to oil spill accidental events is an effort for each Oil Company, since these emergencies can bring about serious environmental consequences.

Prompt response can be provided if a suitable emergency plan, supported by operative resources, exist in accordance to a clear and well defined organization program.

Following the first response, a remediation plan must be implemented, with the aim of assuring the complete recovery of the affected areas, to the original conditions of the sites.

Module M.9 Environmental Management

109

Oil spills contingency planning and remediation

Master HSE&Q

Collection and processing of significant amount of data are requested to prepare a valuable Oil Spill Contingency Plan, for which more significant guiding principles are:
A tiered response frame must be worked out, since the company must be able to escalate its reaction according to even unexpected changing circumstances; Maximum credible and most likely case scenarios have to be identified, based upon a risk analyses of all the geographic areas covered by the Plan; A cooperative approach by all concerned parties is essential in ensuring effectiveness. Cooperation must be sought by the Companies sharing same risks in a similar area and by integrating the industrial plans with the governmental ones.

As for the tiered response, since the location, amount and timing of a spill event are unpredictable, it is advisable to rank the spill event according to location and spill size criteria. A combination of the two is necessary, since the operations effectiveness is influenced by logistic constraints.

Module M.9 Environmental Management

110

Oil spills contingency planning and remediation


Small local spills, Small/Medium spills at some distance from operational centres/local,

Master HSE&Q

Large spills exceeding national boundaries are the scenarios to be addressed. Normally, for significant spill events, the Companys duty is to deploy all the available resources immediately, while the Governmental Agency takes the leading role in the operations. The cooperation with the government for oil spill response is essential, because the viable strategy, which technically must be adaptable to different locations, conditions, different times of the year, must be established and confirmed in consultation with the relevant authorities. The largest oil spill asks for the maximum organizational level. It means team and personnel clear roles and responsibility, effective communication, complete staff training.

Module M.9 Environmental Management

111

Oil spills contingency planning and remediation

Master HSE&Q

This organization must rely on adequate and dedicated resources that could be acquired through external specialized contractors. Oil spills occurring on land or occurring at sea with beach pollution, requires a final remediation of the affected areas. That means the preparation of a specific restoration plan which is worked out when these cases take place. The most valuable techniques must be used, including monitoring techniques in order to check the process of cleanup.

Details of the remediation plans have to be agreed with the relevant control authorities.

Module M.9 Environmental Management