CT Testing Primary Insulation Resistance Dielectric Withstand Secondary Insulation Resistance Secondary Burden Saturation Ratio and Polarity Primary Ins. Resistance Test For Bar and Primary wound CTs DC voltage test at the rated crest voltage on the primary winding Secondary grounded 1 minute test
3/31/2013
DC Voltage test
Isolate Primary Isolate & Gnd Secondary Connect HV lead to H1/H2 Connect LV to Gnd / 2ndary Test for 1 minute Record test value
3/31/2013
3/31/2013
AC Voltage test
Isolate & Gnd Secondary Connect HV lead to H1/H2 Connect LV to Gnd / 2ndary Test for 1 minute Record test value
3/31/2013
3/31/2013
3/31/2013
3/31/2013
3/31/2013
3/31/2013
Total burden ()
DC Winding resistance () Lead resistance () Device impedance ()
RCT = RL = ZB =
3/31/2013
10
3/31/2013
11
3/31/2013
12
3/31/2013
13
3/31/2013
14
3/31/2013
3/31/2013
16
3/31/2013
17
3/31/2013
18
3/31/2013
19
3/31/2013
20
3/31/2013
21
3/31/2013
NETA STANDARD
5. NETA Acceptance Testing Procedure
3/31/2013
5.1 Visual and Mechanical Inspection 5.2 Electrical Test 5.2.1 Current Transformer 5.2.2 Voltage Transformer 5.3 Test Value Analysis 5.3.1 Visual and Mechanical 5.3.2 CT Electrical Test 5.3.3 VT Electrical Test
23
3/31/2013
24
TEST FORMS
Current Transformer Test Form Voltage Transformer Test Form