Pre-blasting preparation

Paint School
1

Most coating failures result from poor or inadequate:



Steel preparation Cleaning Surface preparation Application Access Ventilation Coating selection Inspection and control Premature exposure (Exposed too soon)

Paint School
2

Investigation by a Guarantee Insurance company has shown:

95 % of all coating failures result from Poor surface preparation Poor application
85 % of all failures appear within 1-2 years This fits in well with our own experience

Paint School
3

Pre-blasting preparation involves the following activities


Rounding or smoothing of: Sharp edges Corners Welds Grinding of: Laminations Flame cut edges Weld spatter Notches minimum diameter: 30 mm Inspected and approved before cleaning
See ISO 8501 Visual assessment of surface cleanliness
Paint School
4

Steel preparation

Edges and weld spatters


Sharp edge
Gas cut edge
A A. Remove by grinder or disc sander. B. Rolled steel sections normally have round edges. Therefore can be left untreated. A. Remove visible spatter before gritblasting with grinder or chipping hammer. B. For spatter not readily removed, remove using grinder/disc.

Weld spatter
B

Paint School
5

Pre-blasting preparation

Rounding sharp edges


Coating applied to a square-cut section Sharp edge Coating
Reduced coating thickness at sharp edges due to tension created during drying / curing

Steel

Rounded edge Even coating thickness

Paint School
6

Cross section of painted steel with a sharp edge



Paint applied with spray Forms inferior coating thickness around the edge Paint

Cd-4932-21 Steel

Paint School
7

Cross section of painted steel construction with well rounded edge



Paint applied by spray Forms even thickness around the edge Paint

Cd-4932-20
Steel

Paint School
8

Grinding of sharp edges, welds etc. Disc sander and disc grinder
Sander for removing mill scale, paint and rust

Grinder for heavy grinding, such as edges and weld beads


Cd-4932-03

Paint School
9

Steel support prior to pre-blasting preparation



Sharp edges Rust grade: A to B according to ISO 8501

Cd-4930-46

Paint School
10

Edge rounded with disc grinder


A well rounded edge will ensure a sufficient paint film over the entire construction

Cd-4932-12

Paint School
11

Steel support after blast-cleaning to Sa 2


The sharp edges have been rounded prior to blast-cleaning: Good !

Cd-4930-48

Paint School
12

Weld with pinhole. Visible through the paint system



Will lead to initiation of corrosion Remedial actions: Remove the paint, re-weld and grind. Apply paint

Cd-4930-42
NOTE: Such defects may be difficult to find during inspection
Paint School
13

Early corrosion on sharp edge and spot welds



Paint has newly been applied Exposed to wind and weather for approximately 2 weeks

Cd-4930-78

Paint School
14

Insufficient pre-blasting preparation


Notch Power tooling has been carried out Sharp edge not grinded

Cd-4932-16

Paint School
15

Severe corrosion due to a combination of several effects


Sharp edges Rough welds (not grinded) Missing stripe coating

Cd-4930-71

Paint School
16

Severe corrosion due to a combination of several effects



Sharp edges Rough welds (not grinded) Missing stripe coating

Cd-4930-72

Paint School
17

Small weld spatters


Even only one small weld spatter may be sufficient to initiate corrosion which with time may lead to severe problems

NOTE: Small failures like this are difficult to find


Paint School
18

Cd-4930-45

Remaining weld beads after removal of supports welded on to the structure


Prior to pre-treatment these must be grinded away to form an acceptable substrate for the paint system

Cd-4932-04

Paint School
19

Pre-blasting preparation

Laminations, undercuts, welding seams


Lamination
Remove using grinder

Undercut
Undercuts exceeding classification ruling should be repaired by welding and grinding.

Manual weld bead


Sharp profile peaks to be smoothed using grinder

Paint School
20

Unacceptable weld. Too rough and full of pinholes / pores



Weld spatters close to weld Rewelding and grinding must be carried out prior to reblasting and painting

Cd-4930-39

Paint School
21

Paint on a very poor weld. Pinholes and holidays visible after second stripe coating

Neither rewelding nor grinding have been carried out prior to application Remedial Actions: Reblasting, rewelding, grinding and blast -cleaning: COSTLY

Cd-4930-41

Paint School
22

Paint applied on a very poor weld. Pinholes and holidays visible after application

Neither rewelding nor grinding have been carried out prior to application Remedial Actions: Reblasting, rewelding, grinding and blast -cleaning: COSTLY

Cd-4930-40

Paint School
23

Spot welding leads to crevices which are susceptible to corrosion


Not recommended solution for exposure to severe / aggressive environments

Cd-4930-36

Paint School
24

Spot welds after painting



Paint is unable to fill gap between the parts welded together These area may be susceptible to corrosion Not recommended for exposure to severe / aggressive environments

Cd-4930-37

Paint School
25

Sharp edge an spot welds. Early corrosion attack

Construction newly painted Exposed to humid atmosphere Corrosion initiates after a short period of time on weak areas: Sharp edges, crevices and spot welds

Cd-4930-38

Paint School
26

Pre-blasting preparation Grinding a small construction


Mark areas where

grinding are required Remove weld spatters Grind the welds Grind the notches Important to carry out the grinding to improve the life time of the paint system
Pre-treatment: Grind_spatters1

Paint School