CRITRERIA TO BE CONSIDERED:

COST OPERATION SAFETY

MAINTENANCE
CONSTRUCTION AESTHETICS

INFORMATIONS REQUIRED:

TERMINAL CONNECTIONS EQUIOMENT/GENERAL ARRANGEMENT DRAWING LINE DESIGNATION

PIPE SIZE
PIPING MATERIAL SPECIFICATION DIMENSIONAL STANDARDS OF COMPONENTS VALVE TYPES AND SPECIALITY DETAILS ANY SPECIFIC REQUIREMENTS

GENERAL CHECKLIST:

CHECK WITH P&ID FOR CONFORMITY LOCATION OF EQUIPMENTS FACILITATE VALVE OPERATIONS

RUN PIPES IN GROUPS


RUN HEAVY PIPES CLOSE TO STRUCTURE MINIMUM CLEARANCE(40-50 MM)

CHECK PIPING INTERFERENCE WITH:

ADJACENT PIPING ADJACENT EQUIPMENT COLUMN, BEAM AND BRACING

VENTILATION AND AIR-CONDITIONING DUCT


CABLE TRAYS FLOOR LIGHTING FLOOR AND WALLS FLOOR DRAINS AND ROOF DRAINS SPRING BOX,HANGER ROD AND SUPPORT OF OTHER PIPING SUPPORT ARRANGEMENT SUGGESTED BY VALVE VENDOR

CONSIDER REQUIREMENT OF SPACE FOR SPRING HANGERS CHECK SUPPORTING ARRRANGEMENT NEAR TANK & FLEXIBILITY KEEP PLANT FUTURE EXPANSION IN MIND CHECK WITH CRANE AND VEHICLE MOVEMET DONT RUN PIPES BELOW MONORAIL

DONT RUN PIPES ABOVE OR IN SPACES PROVIDED FOR MAINTENANCE


PG AND TG AT READABLE LEVEL CHECK THE SMALL PIPES ARE LOCALLY EXPANDED FOR THERMOWELL PROVIDE VENTS AND DRAINS PROVIDE STEAM TRAP AT EVERY 30-40 M FOR LONG DISTANCES CHECK APPROVED VENDOR DRAWING FOR NOZZLE ORIENTATION, SIZE

CONSIDERATION FOR RACK PIPING:

HEAVY PIPES NEAR THE EDGE OF THE RACK UTILITIES ON THE TOP TIER AS SPILLAGE IS HARMLESS AVOID TO LOCATE VALVE IN RACK

TRY TO TAKE ADVANTAGES OF BUILDING COLUMN


FUTURE EXPANSION SPACE CONSIDER DEAD WEIGHT,INSULATION WEIGHT AND HYD WEIGHT

THE FOLLOWING CHECKING IS ALSO REQUIRED DURING ENGG:

DRAIN PIPES DETAILS CHECK CIVIL FOUNDATION FOR UG & FIRE FIGHTING PIPING TRENCH DETAILS SHOULD BE SHOWN

EQUIPMENT FOUNDATION AND NOZZLE ORIENTATION


INTEREFERENCE WITH FUTURE EXPANSIN SPACE & EQUIPMENT CHECK ADEQUETE SPACE FOR SUPPORT CHECK THE CLASH WITH SUPPORTS GIVEN BY OTHERS SCOPE

INTERDEPARTMENT CLEARANCE: ELECTRICAL: CABLE TRAY SPACING ELECTRICAL LOAD LIST INSTRIMENTATION:

STUBIN LOCATION FOR PG AND TG


FLOW METERS LOCATIONS CIVILL: FLOOR OPENING INSERT PLATE SUPPORT PEDESTAL WALL OPENING