Quarry- South Eastern

West Bokaro Mining Stream

West Bokaro Q-SE

West Bokaro Seam Wise Reserve 1.11.2008

West Bokaro

N
DURU Banji

N.E.BLOCK
KARMATIA

Dump

FRS Quarry_AB
G.M. Office

Dump
CMC
Mine office Housing

Sec_C

Dump Qyarry_E

Sect._D

Central Side Quarry_SE

Dump

WASHERY

West Bokaro Q-SE

Our Operations
Overburden Removal
Drilling Blasting Shovelling Dumping

Coal Loading

Environmental Measures Earth filling Afforestation

Despatch

Coal Beneficiation

Coal Crushing

Coal Mining & Beneficiation

West Bokaro Q-SE

Raw Coal Production till FY20

West Bokaro Q-SE

Quarry SE Workings

Box Cut 1 & 2


Box Cut _3 Box Cut _4

West Bokaro Q-SE

Q-SE Equipment fleet


Excavators : 6 ( 4 Shovels : 14.8 m3, 2 Loaders : 15.8 m3) Rear Dumpers : 40 (95 T)

Rotary Drills : 7 (150 mm).


Graders : 2 (16 H) Dozers : 7 TD and 2 WD. Explosive Used : SME (Orica)

West Bokaro Q-SE

Best Practices
7 days working. Staggered weekly day of rest and canteen breaks.

Two grade system without supervisory level.


Semi-mobile canteens and field offices.

Ergonomically designed equipment.


Competency mapping- 4Q Toyota Model

Electronic Display Board.


GPS Online Data Management.
7

West Bokaro Q-SE

EMPLOYEE SATISFACTION
- Reward & Recognition - SHABASH

- Attractive Incentive Bonus


- SGA recognition

- Aspire / SIPs recognition


- Suggestion Reward - Rewarding Performances in JDCs - Long Service award ( 20, 25,30,35,40 Years)

West Bokaro Q-SE

ACHIVEMENT OF THE TRAINING PROCESSES


GREEN TRAINEES TRAINED AS TRAINERS .

REDUCED TRAINING PERIOD (18 TO 6 MONTHS)


FIELD TRAINING TIME REDUCED DRASITICALLY FROM SEVERAL MONTHS TO AVERAGE 3 WEEKS.

TRAINED TO HANDLE ALL POSSIBILE TYPES OF EMERGENCIES.


ENABLER FOR ACHIEVING BENCHMARK OPERATING PARAMETERS. EASY ACCEPTABILITY TO WORLDS BEST OPERATING PRACTICES.
West Bokaro Q-SE
9

GREEN TRAINING PROGRAMME


TRG. BY EXPERT INTERNTL TRAINERS + OJT.

SIMULATOR BASED TRAINING PROCESS ORIENTED TRG. AT WB. TRAINING BY OEMS


OUTDOOR ADVENTURE TRG. OUTDOOR ADVENTURE BY TSAF.

TRAINING BY TSAF

TECHNICAL TRG. AT SNTI HMV COURSE AT JSR.

West Bokaro Q-SE

10

SIMULATOR TRAINING

West Bokaro Q-SE

11

SIMULATOR TRAINING
Teaches correct control procedures from safety, production and machine wear and tear perspectives.

Starting the truck

Reversing under a shovel

Dumping

West Bokaro Q-SE

12

SIMULATOR TRAINING
Simulators... Creates an environment very similar to a real machine at work

West Bokaro Q-SE

13

SIMULATOR TRAINING
Exposes the operator to various simulated events many too dangerous or difficult to test for real.

Dust or Fog

Road Surfaces

West Bokaro Q-SE

14

SIMULATOR TRAINING
Records the operator's reactions together with vital machine operating information

West Bokaro Q-SE

15

SIMULATOR TRAINING
Gives out an operator's detailed report, and can "play back" the operator's session to evaluate his performance.

West Bokaro Q-SE

16

Quarry Production in Process

West Bokaro Q-SE

17

Canteen

West Bokaro Q-SE

18

Locker Room

West Bokaro Q-SE

19

GREENERY AT SHOPFLOOR

West Bokaro Q-SE

20

Quarry SE at Night (Face)

West Bokaro Q-SE

21

Quarry SE at Night (Haul Road)

West Bokaro Q-SE

22

Quarry SE at Night (Dump yard)

West Bokaro Q-SE

23

Quarry SE at Night (Installations)

West Bokaro Q-SE

24

OB DUMP UNDER RECLAIMATION

West Bokaro Q-SE

25

Thank you

West Bokaro Q-SE

26

Location

West Bokaro Q-SE

27

A brief history
1947 Mine comes into existence as M/s Bokaro & Ramgarh Ltd. Management of mine given to M/s Anderson Wright Management taken over by M/s West Bokaro (P) Ltd., a wholly owned subsidiary of Tata Steel West Bokaro becomes a Division of Tata Steel

1952

1972

West Bokaro Q-SE

28

West Bokaro : An Introduction


A Division of TATA STEEL, providing 48% coking coal & 100% thermal coal requirement of the Company We also provide 34% of the thermal coal requirement of Jojobera Plant, Tata Power

Employee strength 3411 of which 40% are technically qualified 12 % unskilled , Mostly employment on land basis
Location: 200 kms North of Jamshedpur Leasehold: 4300 acres

West Bokaro Q-SE

29

Our customers and Products


Products Clean Coal
Ash 13 %

Our Key Customers


Coke Plant,TISCO Power Engg., TISCO

Middlings
Ash 38-41 %

Tata Power
Brick Kilns Captive Power Plant

Tailings
Ash 35-38 %

Rejects
Ash 66-68 %
West Bokaro Q-SE
30

Transportation of Material

Overland Conveyor
West Bokaro Q-SE
31

Ropeways

Quick Loading Complex, Chainpur

West Bokaro Q-SE

32

EMPLOYEE SATISFACTION
- Joint consultation Foras
Frequency JCCM (Apex Level)

Quarterly

Central Joint Council (Divisional Level)


Joint Departmental Council

Quarterly

Monthly

(Department Level)

West Bokaro Q-SE

33

CONDUCIVE WORK ENVIRONMENT


ISO 14001 Certified Towards OHSAS 18000 certification Adoption of Total Productive Maintenance (TPM) Ergonomically Designed equipment Review of Safety & Environment every Day Haul Road Profile Mapping (ASI)

West Bokaro Q-SE

34

Quality of Life
Free Electricity & Fuel Free Accommodation to employees Free Education Coaching & Career counseling Schemes like Employees Family Benefit Scheme and Medical Separation Scheme Club, Recreation & Community Centers Parks & Gardens 60 bedded hospital

West Bokaro Q-SE

35

Aspiration

To be the most admired unit in the Coal Industry

West Bokaro Q-SE

36