Engineering Quality Common Problems5 Shelter

The common problems of Shelter


The type of problem
The technique of installation
1Weak horizontal adjustment 2bolts without sealing 3Outdoor lamp placed in the wrong position

The standards of Quality

Check method

The equipment room is installed properly and securely on its base, and the structure is kept intact without distortion

Visual measurement

Seal measure:
1Feeder line window without sealing 2Holes on shelter wall without sealing 3Water leaks

1The feeder window should be sealed to avoid water leakage 2Rabbet joint should be used for the joint between walls of the equipment room; the hold-down strip is installed on the convex part on the top of the compartment, and all the seams are sealed with fluid sealant 3The walls of the equipment room is water resistant

Visual measurement

Messy in the shelter

The equipment room is clean, free of dust and sundries


Huawei Confidential

Visual measurement
Page 2

HUAWEI TECHNOLOGIES CO., LTD.

Engineering Quality Common Problems5 Shelter

Shelter InstallationWeak horizontal adjustment


Problem: Horizontal adjustment with wood slices

Suggestion: Steel slices should be employed for horizontal adjustment

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

Engineering Quality Common Problems5 Shelter

Shelter InstallationBolts without sealing

Suggestion: Sealing or adopt other antirust measure

Problem: bolts without sealing

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 4

Engineering Quality Common Problems5 Shelter

Shelter Installation Lamp placed in the wrong position


Suggestion: 1correct the lamp type in the design files; 2reinstall a proper lamp Under the door eaves Problem: The length of the lamp does not match with the door eaves

Problem: The lamp should be under the door eaves

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 5

Engineering Quality Common Problems5 Shelter

Seal measureThe feeder cable window is not sealed well

Suggestion: Use the waterproof cement to seal the windows well.

Problem: The feeder cable window is not sealed.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

Engineering Quality Common Problems5 Shelter

Seal measure Holes without sealing


Problem: Holes on shelter wall without sealing

Suggestion: Sealing up the hole

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

Engineering Quality Common Problems5 Shelter

Seal measure Water leaks


Suggestion: 1mend the shelter where leaks water; 2Contact the supplier if the AC leaks water. Problem: water leaks

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 8

Engineering Quality Common Problems5 Shelter

Messy in the shelter

Suggestion: Clean up
Problem: Rubbish on the floor

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 9

Engineering Quality Common Problems5 Shelter

Appendix1Shelter Checklist
Problem type
B B B B B B B B B B B

Check Item
The equipment room is installed properly and securely on its base, and the structure is kept intact without distortion
The levelness of the equipment room meets the design requirements The verticality of the equipment room meets the design requirements The indoor conductive floor is flat; the rivet connection is secure, and there is no loose rivet, rust or crack Door closers should be capable of closing the doors automatically The walls of the equipment room is water resistant The locks is burglary-resistant and stainless Rabbet joint should be used for the joint between walls of the equipment room; the holddown strip is installed on the convex part on the top of the compartment, and all the seams are sealed with fluid sealant The cable fixing bracket for fixing outdoor optical cables and other accessories should be fastened The location of the feeder window meets the design requirements The feeder window should be sealed to avoid water leakage
Huawei Confidential Page 10

HUAWEI TECHNOLOGIES CO., LTD.

Engineering Quality Common Problems5 Shelter

Appendix2Shelter Checklist
Problem type
B B B B B B B B C C

Check Item
The fluorescent lamps and the switches are working The cabling rack is mounted securely and uprightly at the correct position and meets the design requirements The emergency lamps work normally Obvious marks should be available in the monitoring box to avoid misoperation the location of the grounding copper busbar meets the design requirements The required model of the power distribution box is installed securely, and its location conforms to the design requirements The period of validity of the portable extinguisher does not expire The related instructions and technical documentation are complete No scratch, damage or rust on the appearance and inner wall of the shelter The equipment room is clean, free of dust and sundries