RNC 403 Overshooting Cells

Dubai Network 18th-Apr-2013

Summary
The objective of this working is to find out overshooting cells that may cause pilot pollution and degrade quality. Following inputs were used for identification of such cases Pilot Pollution output generated by XEUS tools based on Huawei PCHR data.

RSCP plots from recently conducted extensive drive test activity.


Best RSCP plot from XEUS tool based on PCHR data (where required). TP distribution stats from M2000. In this working, only the overshooting cells which have acceptable coverage in their serving area have been targeted. RF footprint of the identified cells needs to be contained by down-tilting.

Recommendations
Current RF Design parameters RNC Sector Name Cell ID Cell ID Cell ID F1 F2 F3 Antenna Height Antenna Azimuth Recommendation E-tilt M-tilt Antenna Type

403

DXBA2__National Cement Factory 1 - C

2533

2536

2539

PW 7780

27

300

10

Audit of RF parameter required. A down-tilt of 1 degree E-tilt will be recommended during audit if required.

403

DXBA2__National Cement Factory 2 - A

2541

2544

2547

PW 7780

27

40

Down-tilt by additional 2 degree E-tilt

403

DXBA2__Al Safa 3 - A DXBA2__du_ Al Safa 2_01 - A

55291

55294

55297

PW 5785

35

60

No action

403

29431

29434

29437

PW 5780

27

60

Down-tilt by additional 1 degree E-tilt

403

DXBA2__du_Safa_01 B

9392

9395

9398

Comba ODV 065R18K18L

27

180

No action

403

DXBA3__Springs PH8 46827 D DXBA2__National Cement Factory 1 - A

46828

JB5162100

35

245

Down-tilt by additional 1 degree E-tilt

403

2531

2534

2537

PW 7780

27

35

Down-tilt by additional 2 degree E-tilt

Overshooting Cell 403:2533

Overshooting Cell 403:2533

Down-tilt UDXB253_C by additional 2 degree E-tilt.

Overshooting Cell 403:2541

Overshooting Cell 403:2541

Down-tilt UDXB254_A by additional 2 degree E-tilt.

Overshooting Cell 403:55291

Overshooting Cell 403:55291

Audit of UDXB5529_A is required to confirm tilts and azimuth. RF changes for containment will be recommended based on audit results.

Overshooting Cell 403:29431

Overshooting Cell 403:29431

Audit of UDXB2943_A is required to confirm tilts and azimuth. RF changes for containment will be recommended based on audit results.

Overshooting Cell 403:9392

Overshooting Cell 403:9392

Audit of UDXB939_B is required to confirm tilts and azimuth. RF changes for containment will be recommended based on audit results.

Overshooting Cell 403:46827

Overshooting Cell 403:46827

Down-tilt UDXB4682_D by additional 2 degree E-tilt.

Overshooting Cell 403:2531

Overshooting Cell 403:2531

Down-tilt UDXB253_A by additional 2 degree E-tilt.

Thank You!!