Title of the Project

Development of National ICT Infra-Network for Bangladesh Government (BanglaGovNet)


Owner of the Project

Sponsoring Ministry
Executing Agency Duration of the Project
Date of Commencement

Ministry of Science and ICT


Bangladesh Computer Council

April 2010 April 2010 to June 2014 5 yrs

Date of Completion (With O&M)

Estimated Project Cost


GOB
67,08.10 9.58

EDCF Loan
214,40.20 30.63

Total
281,48.30 40.21
In Lac Taka In Million US$

What is BanglaGovNet?

BanglaGovNet Stands for Bangladesh Government wide Network. It is a Public Network to connect all the Government entities throughout the country under a single Network.

It is a dedicated Government Intranet.

Why BanglaGovNet?

To ensure a Basic Infrastructure for e-Government. To ensure a Secured Connectivity among all the Government entities. To ensure e-Governance through an integrated common platform. To provide vast free Bandwidth for data Communication within the Government.

Objectives of the Project

To improve Government efficiency and promote interaction between governments Ministry/ Divisions, Departments, Districts and Upazillas by construction of Government network infrastructure

To use ICT system within the public administration to improve efficiency and transparency, reduce wastage of resources, enhance planning and raise the quality of services.

To construct a public network as a backbone for the effective implementation of eGovernment

To maximize the computerization of work processes and resources through integrated information management system enabling real time administration.

Master Plan for Government Wide Network


Phase Year wise Plan Scope of Work Estimated Budget (US Dollar) Main Solutions - E-mail - Security Solutions - E-Document - Government WEB - G2G

(BanglaGovNet)

- National ICT Center( NICTC) - Ministries/Divisions(45) Apr 2010 ~ - Major Departments ( >100) June 2014 - District Offices(64 DICTC) - Upazila Offices(64 UICTC)

40.21 Million

- Expand Network to Upazila level - Interoperability between Central and Local Govt. Administration - Development of Bangladesh Education Network (BanglaEduNet) July 2011 ~ => Primary & Secondary level Education (Info-Sarker) Dec 2015 - Connecting High level education Institutions - Making an ICT-driven society - Final preparation for Digital Bangladesh

150 Million

- e-Education - e-Procurement - e-Financial Services - e-Local Government - e-Community - G2B, G2C, G2P - Etc

Location of the Project


Bangladesh Computer Council (BCC), Dhaka
All Ministries and Divisions in Dhaka (Capital City). Major Departments and Corporations under Ministries and Divisions in Dhaka. 64 Deputy Commissioners Offices. Minimum 64 UNO Offices.

Scope of the Project (contd..)


Construct Government Data Resource Centre (Data Centre) which will be the core part of the network to interconnect every government Ministry/Division, Department, District and Upazila administration to provide :
Centralized Control and Management of the Network (NOC); Secure Single Point of Entry/Exit to the Internet; Secure Communication; Broadband Connectivity through IP Backbone; Centralized Government-wide Secure e-mail System and IP-based Voice Services;

Open Interoperability Standards;


Virtual Private Network (VPN) Connection for authorized agencies; Hosting of Government Websites etc.

Scope of the Project (contd..)


Construct District Data Resource Centre (DICTC) in each of the Deputy Commissioner (DC) offices which will be connected with the NICTC. Construct Upazila Data Resource Centre (UICTC) in 64 UNO offices in Dhaka, which will be connected with the NICTC and DICTC. Provide the government-wide intranet enabling government agencies to access and share their information and data. Develop the centralized government-wide electronic mail and filing system to provide an electronic mailbox and storage to the registered government users. (Gov e-Mail)

Develop and install related applications such as interactive websites, e-Approval, Electronic Document Management System etc. (Web Portal, Groupware)

Scope of the Project (contd..)

Supply and install comprehensive security solution such as Firewall, Anti-Spam Filters and Intrusion Prevention System (IPS) in order to ensure identification of hackers and abuses of government network and intruders into privacy of users. (UTM, Anti-Virus, Anti-Spam, Physical Security, etc.) Training & Visiting Program for enhancing ICT Knowledge & Skill Consultancy Services Operation & Maintenance Services The project scope might be adjusted to accommodate the results of detailed site surveys, engineering requirements or as per demand.

Scope of the Project


Government Infra-Network
Wireless Network Software/ Application Development Fellowship Training & Education Operation & Maintenance Support

NICTC (BCC)
Secretariat Major Depts. All Districts Limited Upazilas

District ICTC Upazila ICTC Mesh WiFi Broadband Wireless

TOSS Web-Portal Mail GroupWare

Advanced ICT Culture & Tech Basic Network Wireless Network Wired Network etc.

For 2 year

Support 24/7 Operating Consulting Keep Maintenance Quality

Terms of EDCF Loan


Interest Rate Maturity Method of Repayment Interest Payment Overdue Charge Service Charge 0.5% per annum 30 yrs including grace period (10 yrs) Semi-annual equal installment after the grace period Every 6 months in arrears on outstanding balances 2.0% per annum above the interest rate 0.1%

Major Components
Equipments and Machineries Furniture Software Motor Vehicles Installation & Services Manpower Foreign Training and Visit CD/VAT Consultancy Operation & Maintenance Contingency/Others 13.11% 2.49% 3.45% 11.08% 41.15% 2.26% 6.75% 0.23% 10.75% 1.85% 2.40%

Connectivity (Line rent, Bandwidth Cost) 4.48%

Estimated Cost
No. Section Quantity
For PIU,NICTC,DIC TC,UICTC DO

GOB

EDCF

Total

Percentage(%) of Total Budget 41.15% 2.26% 6.75% 0.23% 13.11% 1.85% 2.40% 2.49% 4.48% 3.45% 0.08% 10.67% 11.08%

1 2 3 4 5 6 7 8 9 10 11 12 13

Equipment Furniture Software Motor Vehicle CD/VAT Manpower Foreign Training & Visit Consultancy Connectivity (Line rent, Bandwidth Cost) Operation & Maintenance Service Charge Installation Contingency (Physical, Price & Others) Grand Total

635.51 3691.51 522.14 18,58.94 67,08.10

11582.02 1899.70 65.10 676.84 700 1260.00 970.52 21.70 3004.32 1260.00 21440.20

115,82.02 6,35.51 18,99.70 65.10 36,91.51 5,22.14 6,76.84 7,00 12,60.00 9,70.52 21.70 30,04.32 31,18.94 28148.30

As Required 1xJeep, 2x Microbus 27.25 216 Officers and Staffs) 70 12 LS LS 1% LS LS

In Lac Taka

Manpower
Unit
PIU
NICTC DICTC UICTC

Proposed Location
BCC Bhaban
BCC Bhaban 64 District x 3 64 Upazila Grand Total :

Approved by MoFin
08
16 192 0
216

Yearwise Manpower
Unit
PIU NICTC DICTC UICTC

1st Year
08 -

2nd Year
08 16 15 -

3rd Year
08 16 192 -

Topology of BanglaGovNet
N ICT C
U T M
L 2 SW

WA N RO U E R

Secretariat

L 4 SW

10GE
Internet RO U E R

GE

DMZ
Web Mail

T otal O SS

L3 SW
Server F arm

SA N SW

Slab-1 : 3~18Mbps

L 3 SW

L 4 SW

GE Dhaka
D H Q
L 2 SW L 3 SW

23 ~ 42 * E1
Internet RO U E R

Internet

U T M

L 2 SW

512K ~ Slab-1
WA N RO U E R

512K ~ E1 per Site

DICTC
L2 SW
Router

UICTC
L3 SW
Terminal/Host

Terminal/Host

4 Tier Hierarchy : NICTC DHQ DICTC UICTC Use Dark Fiber : NICTC Secretariat (10 GE), - Dhaka DHQ (1GE) Bandwidth (Speed) : Start at 64Kbps for saving rental fee

Infra-Network Wireless Connectivity


Wireless Solution
Providing Non-line of sight Mesh Wi-Fi Wireless Network or P-t-P Long Distance Wireless Broadband

Connectivity between District Data ICT Centre (DICTC) - Upozila ICT Centre (UICTC)
UICTC 3
UICTC 2 UICTC 1 UICTC 6 UICTC 4 UICTC 5 UICTC 1 UICTC 3

UICTC 2

Max 16Km

Max 48Km

Internet Backbone

DICTC

Internet Backbone

DICTC

Mesh WiFi Benefit of Wireless Network

Long Distance Broadband Wireless DICTC

High performance for voice, video and Internet services Share of the Knowledge from Wireless Data store Safety at Government Data Resource Centre (GDRC) UICTC

UICTC

Infra-Network Security
Network Security
Internet DMZ DNS Server Web Server

Router : Primarily protecting harmful internet traffic Firewall : Blocking the traffic by Filtering and Security policing

IPS : Intrusion detection and Response to intrusion attempt


Anti-Spam Mail : Protect spam mail
Mail Server

Place between Firewall And Backbone Switches

Backbone Switch - A

Backbone Switch - B

BanglaGovNet Connectivity Plan

BanglaGovNet Connectivity Plan


BCC NICTC
Data Centre

NOC

BanglaGovNet Connectivity Plan


BCC NICTC
Data Centre

NOC

FO

All Ministries/ Divisions

BanglaGovNet Connectivity Plan


BCC NICTC
Data Centre

NOC

FO

All Ministries/ Divisions

FO

Major Departments/ Organizations

BanglaGovNet Connectivity Plan


BCC NICTC
Data Centre

NOC
FO

FO

All Ministries/ Divisions

FO

Major Departments/ Organizations

7 Divisions

DICTC
57 Districts

BanglaGovNet Connectivity Plan


BCC NICTC
Data Centre

NOC
FO

FO

All Ministries/ Divisions

FO

Major Departments/ Organizations

7 Divisions

DICTC
57 Districts
FO/Wireless

UICTC

64 Upazilas

BanglaGovNet Connectivity Plan


BCC NICTC
Data Centre

NOC
FO

FO

All Ministries/ Divisions

FO

Major Departments/ Organizations

Info-Sarker (2nd Phase)


All District Level Govt. Offices

7 Divisions

DICTC
57 Districts
FO/Wireless FO/Wireless

UICTC

64X Upazilas

BanglaGovNet Connectivity Plan


BCC NICTC
Data Centre

NOC
FO

FO

All Ministries/ Divisions

FO

Major Departments/ Organizations

Info-Sarker (2nd Phase)


FO/Wireless

7 Divisions

DICTC
57 Districts
FO/Wireless

All District Level Govt. Offices

FO/Wireless

UICTC

64 Upazilas

417 Upazilas

BanglaGovNet Connectivity Plan


BCC NICTC
Data Centre

NOC
FO

FO

All Ministries/ Divisions

FO

Major Departments/ Organizations

Info-Sarker (2nd Phase)


FO/Wireless

7 Divisions

DICTC
57 Districts
FO/Wireless

All District Level Govt. Offices

FO/Wireless

UICTC

64 Upazilas

417 Upazilas
FO/Wireless FO/Wireless

All Upazila Level Govt. Offices

BanglaGovNet Implementation Plan

BanglaGovNet

Resources Plan for DICTC & UICTC

District ICT Center Layout

Furniture and Fixtures to be Deployed for DICTC


SL
1 2 3 4 5 6 7

Description of Works
Secretarial Table Operators Table Secretarial Chair Operators Chair Visitor Chair Side Rack File Cabinet

Qty.
1 1 1 1 4 1 2

Unit
Nos Nos Nos Nos Nos Nos Nos

8
9 10 11 12 13 14 15

Steel Almirah
Three Seated Sofa Cyber Desk with Chairs for 4 users Center table for Sofa Tool/Chair for MLSS/Security Window/Door Screen (7-0 Height) Half height partition (4-6 height) Painting/Distemper work

1
1 1 1 1 140 45 700

Nos
Nos Nos Nos Nos Sft. Sft. Sft.

Equipment to be Deployed for DICTC


SL
1 2 3 4 5 6 7 8

Description of Works Router L2 Switch Microwave Equipment PC with UPS Laser Printer Security System Air Cooler (Split type, Max. 3 ton) Electrical Works

Qty. 1 1
As Required

Unit
Nos Nos

2 2 1 1

Nos Nos

Nos

LS

Upazilla ICT Center Layout

Furniture and Fixtures to be Deployed for UICTC


SL
1 2 3 4 5 6

Description of Works
Secretarial Table Operators Table Secretarial Chair Operators Chair Visitor Chair Side Rack

Qty.
1 1 1 1 4 1

Unit
Nos Nos Nos Nos Nos Nos

7
8 9 10

File Cabinet
Steel Almirah Three Seated Sofa Cyber Desk with Chairs for 4 users

2
1 1 1

Nos
Nos Nos Nos

11
12 13 14 15

Center table for Sofa


Tool/Chair for MLSS/Security Window/Door Screen (7-0 Height) Half height partition (4-6 height) Painting/Distemper work

1
1 140 45 700

Nos
Nos Sft. Sft. Sft.

Equipment to be Deployed for UICTC


SL
1 2 3 4 5 6 7 8

Description of Works

Qty.

Unit
Nos Nos Nos Nos Nos

Router
L2 Switch Microwave Equipment PC with UPS Laser Printer Security System Air Cooler (Split type, Max. 3 ton) Electrical Works

1
1
As Required

2 2 1 1

Nos

LS

Year wise Deployment Plan in DICTC & UICTC


1st Year
2010-2011
(PPNB Program)

2nd Year
2011-2012
( BanglaGovNet)

3rd Year
2012-2013
(BanglaGovNet)

Furniture

Computer Table & Chair (10 Set)

Table(02), Chair(06), Side Rack(01), Almirah(01), File Cabinet(01), Sofa Set(01), Internal Partitions & renovation etc. PC with UPS(02), Printer(02), Air Cooler(01), Router, L2 Switch, Microwave Equipment, Security System.

------

Equipment

Server(01), Computer(15), Multimedia Projector(01), Network (LAN)

-------

Manpower -------

1 x Asstt. Programmer/ Asstt. Maintenance Engr 1 x Computer Operator 1 x MLSS

Continue

Training

Basic Network Operation, Maintenance & Troubleshooting(10 days for 300 Participants)

Advanced Networking

Wireless and Wired Network

What we need to do at present?

We need to know the existing basic ICT infrastructure of all the Ministries/Divisions, Departments:

Electrical connectivity LAN, WAN Computers, Servers, Switches, Routers Internet connectivity and Bandwidth etc.

What we need to do at present?

To select a suitable Room (min 15'x20') for DICTC. To make available of 3 phase Electrical power line in the Room. Renovation of the Room (if necessary). To assign someone as In charge of the Room until Manpower is deployed. Physical security should be ensured.

Concluding Remarks
To have a Government wide Network to ensure delivery of citizen services through the effective implementation of e-Governance towards achieving a Digital Bangladesh by 2021.

A Typical Data Centre

BCC Data Centre Layout

Sample Network Operation Centre (NOC)

Вам также может понравиться