Experimental Objective Introduction Background Information Materials Procedure Data/Observations Results Conclusion
To construct a successful boom that will win the highest design ratio. To understand the how booms are constructed and used To understand the concepts of stress and strain.
Helped with the construction of large structures and connected land masses.
Boom
Capable of lifting and moving object multiple times the weight of the boom Main concept: distribute weight over the length of the boom
Bridges
Cantilever Bridge Swing Bridge Bascule Bridge
Cranes
Common fixture used in construction
Anchored to the ground with bolts going through
Tensile Stress
Can be calculated by
Where s is stress F is applied force A is the cross sectional area
Resulting Strain
Can be calculated by
Where L is change in length L0 is objects original length
Competition Rules
Must be at least 1.5 meters long Maximum of two minutes are allowed to anchor boom Highest Design Ratio wins the competition
2 Thick Dowels (7/16" x 48") 2 Thin Dowels (5/16" x 48") 6 Bamboo Skewers (12") HD Tape Kevlar String
Build design
Place the Boom inside the anchorage as fast as possible
Place batteries in the cup at the front of the boom until a certain height is passed TA photographs finished design Record competition data in a table Clean up & return all materials
Competition Results
Improvements
Use more sticks to stabilize the boom inside the anchorage Increase the length of the boom