Trust International for Industrial and Petroleum Services Limited (TIL)
Sectors: Industrial and Petroleum Services: Engineering, IT, Technical, Automation, and HSE Location: Egypt, Abu Dhabi, India, UK Workforce: 140 people; Over 25 Years Experience Est.: 1984
Introduction
Dehydration of natural gas is the removal of the water and H2S that are associated with natural gases in vapor form. Dehydration prevents the formation of gas hydrates and reduces corrosion. Several methods have been developed to dehydrate gases on an industrial scale: Direct cooling, Adsorption, Absorption.
SA-516 G65 Commissioning date: 1982 35 Years Design Lifetime. Design standard: BS 5500. Design thickness: 107mm DxL: 2374mm x 16000mm Corrosion allowance 4mm.
design: 350C min design: 62C, max operation: 320C, min operation: 0C.
Pressure:
max
design 121 bar G, min design 0 bar G, max operating 115 bar G, normal operating 110 bar G.
Protection devices: Unit is protected by a pressure control valve High pressure trip primary relief valves and secondary relief valves sized in accordance with API 520. This vessel is protected by three relief valves.
Inspection Data: 1986 Partial visual internal good condition, light millscale in some isolated areas
1992
100% internal 19 surface breaking linear flaws in ground weld caps, removed by light grinding.
Upper internal support ring weld UT scanned 100% circumference and lower original ring 25% circumference and no defects were detected.
1992
Inspection Data: 2000 External. Insulation removed light surface corrosion, isolated areas of rust scaling. Pitting to 0.7mm depth.
2000
Internal. 23% surface area UT scans for internal pitting, no defects. Wall thickness measurements satisfactory (Uniform Corrosion 0.18mm).
Maintenance Data: 1992 Additional grid and support beams welded into vessel
2000
Area Classification: Hazardous Area classification reduces the ignition probability of un-ignited vapor releases.
The
hazardous area classification zone 2 (H2S) covers the whole unit area.
surrounding area is categorized Zone 2 for hydrocarbon releases.
The
for cooling. An auto deluge system is provided to process vessels. ESD and blow down facilities. H2S and flammable gas detection. There are a number of hydrants that may also be used. Firewater fed via electric and diesel fire pumps from site fire pond. Emergency response procedures..
Other Data:
Chemical data: Methane Gas Quantity: 8 tonnes Toxicity: Toxic fluids: >0.5 tonnes. Population: Remote. Chemical Composition:
C Si 0.0 4 Mn P S Al Cr Co Mo Nb Ni 0.02 0.01 0.25 0.3 5 8
0.2
1.7
0.03
0.1
0.3
0.04
The vessel has had full PWHT. H2S stream content less than 50ppm.
Molecular sieve
RBI Method
Failure Modes:
Internal
corrosion: was way below (0.01 mm/y) the allowed limits which was (0.115 mm/y on a 35 Years Designed Lifetime) (Low Probability).
Corrosion: was found to be less (0.038 mm/y based on a pitting corrosion of 0.7mm depth) than the designed limit (0.115 mm/y) (Low Probability).
External
Failure Modes:
Erosion:
Due to the lack of inspection data and based on the teams technical back ground and from the process point of view, it was concluded that the molecular sieve dust escapes from the tower with the output gas so erosion is expected in the bottom of the tank and through the outlet nozzle due to the high velocity of the output gas (Medium-High probability).
Failure Modes:
Creep:
Due to exposure of the sieve to high temperatures (320C) during the regeneration process, creep is expected although the design temperature limit is above the op. limit (350C) (Medium probability). Thermal Fatigue: Due to the process design of the molecular sieve each tower is exposed to a repeating heating cycle daily, thermal fatigue is probable (Medium-High probability)
Failure Modes:
SCC:
No agent available except H2S which is present in the inlet gas with low concentration (<50ppm) and high sulfur steel used in the vessel, therefore no SCC damage is assumed (Low Probability).
Temperature Embrittlement: Although high temperatures are recorded, they are still below the limits so (Medium Probability).
High
Probability of Failure
According to the previous failure modes analyzed a probability of Medium-High is set based on the worst case.
Business Impact:
No Impact 0-125K 125K-2.5M >2.5M An average equipment cost for the plant is 7K/m2.
Environment:
No Impact
No-Minor
No-Minor
No-Slight
Thank You