Вы находитесь на странице: 1из 162

CUADRO DE CONVENCIONES REFERENTE A LOS

COMPONENTES DE UN CUARTO DE TELECOMUNICACIONES


CUADRO DE CONVENCIONES REFERENTE A LOS
COMPONENTES DE UN TRAZADO DE CABLEADO HORIZONTAL
CUADRO DE CONVENCIONES REFERENTE A LA NUMERACION
EMPLEADA PARA RELACIONAR LAS AREAS DE TRABAJO
CUADRO DE CONVENCIONES REFERENTE A LOS
COMPONENTES DE UN AREA DE TRABAJO
CUADRO DE CONVENCIONES REFERENTE
LOS SISTEMAS DE SEGURIDAD
CUARTO DE EQUIPOS

Backbone Cables To
Backbone Cables Building Distribution
From System Common
Building Entrance Equipment Cabling
Area
Equipment
Cable
Ducts

System Distribution
Common Cross-Connect
Equipment
a101.126a S
METODO DE LA MANGA

Wall
Strap

Cable Tied Sleeve


To Steel
Support
Strand
METODO DE LA RANURA
Cable
Clamp

Floor
Bracket

Slot Cable Clamped


To Steel
Support Strand
METODO DE CONDUCTO

Main Backbone Conduit Extending


Through Basement Area
METODO DE TRASPORTE DEL CABLE

Cable Rack Backbone


Cable
METODO DE SALIDA DE INFORMACION

Horizontal Telecommunications
Cable Closet

IO Information
IO Outlet (IO)
IO
METODO DE ZONA

From
TC

25-Pair or bundle of 4-pair


Horizontal Zone Cable

Consolidation
Point

IO 4-Pair 4-Pair IO
Extension Cable Extension Cable
METODO DE CANAL

Header
Raceway
For Lateral
Communications Power Raceway
Communications
Wiring Cable For
Wiring
Power Wiring

Header
Raceway
Lateral
For
Raceway
Power Wiring
For
Communications
Jack
Wiring

a101.120a S
METODO ATRAVES DEL MUEBLE

a101.121a S
DUCTOS POR DEBAJO DEL PISO

Outlet Box Outlet Box


For Jack For Power

To Backbone Access
Closet Plate
DUCTOS PROYECTADOS ENTRE DOS CUARTOS DE
TELECOMUNICACIONES

300 ft (91m)

Core Area

200 ft Telecommunication
(61m) Closets

a101.02b S
DUCTOS DE CONCRETO POR EL PISO

Cell For
Communications
Wiring

Cell For
Electrical
Header Duct With Wiring
Removable Plates
METODO PISO FALSO

Floor Plates
Removed To Gain
Access To Cable

Locking
Pedestal
METODOS POR DEBAJO DEL PISO

Flush-Mounted
Satellite Cabinet
IOs

IO

a101.125a S
METODO BASE DE DISTRIBUCION

SATELLITE POWER AND COMMUNICATIONS


CABINET CABLE (SEPARATED CHANNELS BY
BASEBOARD tab2.#
PARTITIONS)
RACEWAY
FRONT
PANEL

CONDUIT
METODO DE TERMINACION DEL DUCTO EN EL AREA
DEL SOTANO

When Possibility Exists That Metallic


Conduit Will Come In Contact With
Building Reinforcing, Insulation Around
Duct Is Necessary.
Ground Level
Provide 4″ (102 mm)
Recess When Possible Duct Extended to
Undisturbed
Coupling
Earth to Avoid
Duct To Pole,
Shearing
2X Diameter
Of Conduit Manhole Or
Property Line
Duct Section Placed
Inside Through Wall At Time
Wall Concrete Of Construction
Wall
Reinforcing

Footing V-Cut Trench or


Shored Straight a101.44b S

Trench
FORMA DE PENTRACION DEL DUCTO AL PRIMER
PISO

Ground Level Plywood For


Terminal Or
Splice Location

8″ (203 mm)

24″ Min. Foundation Slab


(610 mm)
To Alternate Location

Radius
Minimum Drop of
Adapter 1 Inch per Foot

Вам также может понравиться