Agenda
The Usual Suspects (ISU house) Device Management specialties (DM Technology) Tricky terminology Fun and Interactive Activity!
Scheduling Creation of Meter Reading Orders Completion of Meter Reading Orders Meter reading follow-up
Device Mgt
Read
1
Customer Care
Billing
Account Mgt
Northstar
Northstar University
Northstar
BP CA C I
P
CO
Premise
Connection Object
3
Northstar
Connection Object
The physical building
Premise
The apartment/suite
DL
Device Location
The Meter Location
Utility Installation
A service at a building (may be multiples)
D DC RG
Device
The Meter
Device Category
Register Group
Northstar
CIS
Meter Code/Type B263: This is a Digital meter that has two registers a 5 dial consumption register and a four dial demand register Meter Number 1234567: This Meter has the BC Hydro Serial Number 1234567, and manufacturer serial number 1234567890GE. It was made by General Electric in 2001. It is a B263 type of meter
04643 kWh 0021 kW
CCS
Register Group 5c-4d: This group has two registers a 5 dial consumption register and a four dial demand register Device Category/Material B263: This is a Digital meter that has register group 5c-4d Device/Equipment 100001: This Meter has the Serial Number 1234567, and manufacturer serial number 1234567890GE. It was made by General Electric in 2001. It is a B263 type of meter
B263/1234567
1234567890GE
Northstar
Name in IS-U
From component
Device
Device category Device number
Equipment
Material Serial number
Northstar
The device number is created in MM with the function Goods Receipt. At the utility company, the device is labeled with this number. The device number can also be generated when you create a device in IS-U. The device is identified by a unique material and serial number combination to distinguish it from other pieces. The equipment number is the same throughout the whole system.
Northstar
CCS functionality is an add-on to core SAP R/3 functionality. For the Utilities industry, some new objects were created. In the cases where existing R/3 objects were used, they may or may not have a new name, depending on the screen being used.
CIS
SLID
SAP R/3
CCS
Connection Object Device Location Premise Utility Installation
Functional Location
-
CIS
Meter Type/Code Meter Number
SAP R/3
Material Equipment
8
CCS
Register Group Device Category Device
Northstar
Northstar University
Northstar
Schedule Master Data defines the Rules around Meter Reading and Billing
Factory Calendar Z2
Billing Portion M2
Bill every 20 workdays, starting from Jan 2, 2003 (and using factory calendar Z2)
Bill every 40 workdays, starting from Feb 2, 2003 (and using factory calendar Z2)
Create Meter Reading Orders and download them to ITRON 4 days before the billing day, as defined on the Portion M2
Create Meter Reading Orders and download them to ITRON 4 days before the billing day, as defined on the Portion B22
10
Northstar
Schedule Records are created periodically from the Schedule Master Data. They define the actual dates that each MRU is read and Portion billed.
Meter Reading Unit 423092B has 8 Schedule Records:
MRU: 423092B 02.02.2003 03.04.2003
01.06.2003
02.08.2003 04.10.2003 02.12.2003 01.02.2004 03.04.2004
11
Northstar
Northstar
Northstar University
Northstar
Premise and Utility Installation dont exist on a Service Order. Service work is done at a Functional Location Materials are consumed whilst servicing Equipment
CIS
SLID
SAP R/3
CCS
Connection Object Device Location Premise Utility Installation
Functional Location
-
CIS
Meter Type/Code Meter Number
SAP R/3
Material Equipment
14
CCS
Register Group Device Category Device
Northstar
Each Order has an Order Type and an Activity Type (a hierarchical way of defining the type of work to be performed) Each Order has a Functional Location (with a corresponding Object Address) defining where the work is to be done, and a Business Partner (with a corresponding Customer Address) defining who wants the work done
One or more Operations break down the work into logical steps
One or more Materials identify what needs to be taken into the field for use or consumption during the course of the work (e.g. tools or spare parts)
One or more pieces of Equipment can be specified representing the physical assets to be worked on
Links to the Sales and Distribution (SD) module of SAP in order to charge for work done and materials used.