Under the Lifts Regulations 1997, lift means a lifting appliance serving specific levels, having a car moving along rigid guides or a fixed course and inclined at an angle of more than 15 degrees to the horizontal, intended for the transport of: People People and goods goods alone, if a person may enter without difficulty and fitted with controls inside the car or within reach of a person inside

Installer of the lift means the natural or legal

person who is responsible for the design, manufacture, installation and placing on the market of the lift, who affixes the CE marking and draws up the EC Declaration of Conformity.

Manufacturer of the safety components means the natural or legal person who is responsible for the design and manufacture of the safety components and who affixes the CE marking and draws up the EC Declaration of Conformity.

Lifts and Escalators. Electricity Ordinance, and other subsidiary legislation. Security and Guarding Services Design and Construction of Lifts and Escalators issued by Electrical and Mechanical Services Department. Design and Construction of Buildings and Building Works for the Installation and Safe Use of Lifts and Escalators issued by Building Authority Energy Efficiency of Lift and Escalator Installations issued by Electrical and Mechanical Services Department.

Fire Resisting Construction issued by Building Authority Code of Practice for Lift Works and Escalator Works issued by Electrical and Mechanical Services Department. Electricity (Wiring) Regulations issued by Electrical and Mechanical Services Department The current requirements of Fire Services Department defined in the latest edition of the Code of Practice for Minimum Fire Services Design Manual:- Barrier Free Access issued by Building Authority Building Services Branch Testing and Commissioning for Lift, Escalator and Passenger Conveyor Installation in Government

Appropriate licenses shall be obtained from the relevant beneficial owners. Where any software is provided in the Works, the Contractor shall submit documents showing that appropriate permission or license the Contractor shall submit documents showing that appropriate permission or license has been obtained from relevant beneficial owners of intellectual property rights

Passenger Lifts (3 nos.) Service/Disable/Firemans Lift (1 no.) 5-Min Handling Capacity > 10% of Population. Waiting Time Interval < 50s. Visual & Voice Indication Programmable Announcement. Computerized Group Supervisory Control. Operation Modes for Different Traffic Demands.

Detailed schedules for shop drawings submissions, equipment offer submissions, and commissioning and testing shall also be submitted in good time to the Supervising Officer for approval. The formats and information to be included in the schedules shall be as required by the Supervising Officer.

Elevator Structure Chart

Estimated budget is based on lift capacity of passengers. Ex: if capacity is 8persons then budget is 20-25 lakh Lift installation depends on height of floor, number of stops and capacity of passengers and requirement of rail is recorded.

1st month they are called for tender Then work is awarded for 4 months Agreement is made stating that the work lasts for 4 months. Manpower required is 3-4 persons Time provided for each person is 3-4 weeks and in order not to waste time, money and effort different tasks are allotted to different persons like fixing bolts, motor electrical wiring, railing etc.

Car safety of lift, stainless steel rope, and counter weight assemble. If battery is weak or failed suddenly then lift stops at any floor. Work measurements: Work will be recorded in measurement books. Assistant engineer will record it and divisional engineer and account section will check the record books. Budget plan is initially initiated by project engineer. In our college there are 3 civil engineers, 3 electrical engineers and 2 supervisors.

The Task is divided and planned accordingly and even Gantt chart helps us to find the how much we are lagging behind our project date and helps to

The Task is divided and planned accordingly and even Gantt chart helps us to find the how much we are lagging behind our project date and helps to complete the project by knowing the obstacles

The idea generation is done and then information gathering for the project started Then the technical department is approached and then the feasibility and scope of the project is checked. Then if the report is OK then it is send to board of directors of the campus for their approval If the approval is done then the information is send to MHRD department for the funding and if it is unapproved then the project is analyzed again or closed.

Then MHRD will Contact the CPWD for the construction and Installation of Lift in NIT-W Fabrication and construction started according to specifications Installation of Lifts Started and the on completion of project the project is delivered to the team and the feedback is done and our project is completed.

How Risk Management is done How Scheduling and time allocation is done. Learned to make Gantt Chart Brief learning about WBS and how to create it How a problem is solved using fishbone Diagram Budget Allocation, Feasibility and scope of Project is done on what factors For a project how resource allocation is done. Planning for the project and gap analysis