INTRODUCTION
Construction Backwash Recovery Facility
This Is not a presentation on Design or Construction of Water Retaining Structures Very briefly few problems encountered in the administration of the above contract will be discussed
Insurance Day works Attendance to contractor Payment for preparation of Method Statements Water Bar in Concrete joints Shoring during Excavation Rock Blasting Laying of Hume pipes Use of Collars Marker Tapes Drawing Errors Safety Officer Quality Control Formworks
INSURANCE
Contractor shall take full responsibility for care of works and materials and plant from commencement until hand over
Provisional sum or to be quoted in BOQ Employers risks Insurance of works and contractors equipment Scope of cover
Shall be in the joint names of the contractor and employer Shall cover employer and contractor against all loss or damage from what ever cause arising until take over Third party Insurance Contractor shall insure in the joint names of employer and contractor
DAY WORKS
When ever necessary any varied work may be executed on a day work basis on receiving instruction from the Engineer Normally day work schedules for labour, materials and construction plant is included in the BOQ
in the NWS&DB it has own standard rates established for Day works. These rates will cover overheads and profit. Generally in most of the other contracts contractor is required to enter the rates for labour, equipments etc. and the contractor will not be entitled to overheads or profits.
In all large concrete water retaining structure it is necessary to provide construction joints as it may not be possible to complete concreting in one pouring of any base or wall. It is necessary to make the joints watertight. It is the normal practice to install Water Bars at the joint to make these watertight. General and particular specifications gives the approved specifications for water Bars Methods statement should describe and explain the placing of Water Bars
Bonding agents are classified in to category of construction chemicals These are used to bond two surfaces of concrete Method statement should Cleary state the use of Bonding Agent These are important points to look for
SHORING
Shoring is required where ever deep excavations are carried out. It is found that the specification of shoring is included in the specification, but not clearly referred in BOQ
ROCK BLASTING
Proper planning of supply of Blasting Materials and detonators required. Safety Measures
MARKER TAPE
SAFETY AT SITE
No goggles .? No helmets..?