RO (Reverse Osmosis) Plant Presentation

Prepared By:
Bilal Mushtaq
(TMT Utilities)

42 Cu.m water will come in MMF

P101A,B,C,D

T-100

P-102A/B/C

MMF A/B

Bag Filter

UV Sterilizer

Cleaning Tank

Cleaning Pump

AntiScalant Dosing

NaoH Dosing Buffer Tank 36 Cu.m


12 Cu.m Effluent water will drain in effluent pit.

HP Pump A/B

Cartridge Filter

6 Cu.m water will go to 1st from 2nd pass.

Cartridge Filter

HP Pump A/B

AntiScalant Dosing

T-200

Simulation Diagram Of RO Plant

P101A,B,C,D

T-100
To Cleaning Tank

P-102A/B/C

MMF A/B

Bag Filter

UV Sterilizer

Buffer Tank . To RO Effluent Pit

HP Pump A/B

Cartridge Filter

Cartridge Filter

HP Pump A/B

NOTE:
Before start up the RO plant 20 minutes Manual Flushing of 1st pass will be done To Drain the BIOCIDE From Membranes. For Flushing This Procedure Will Be followed. 1. Open The start Menu and select Manual command. 2. Open the Rejection valve of solenoid valve. 3. Open the inlet valve of solenoid valve. 4. Open the Valve #2 of MMF A/B. 5. Open the valve #1of MMF A/B. 6. After flushing reverse procedure will be followed and start the plant on AUTO or MANUAL mode. Green Thick Lines Show the Passing Way of Raw Water During Flushing.

T-200

Manual Flushing Before Start the 1st pass of RO plant

P101A,B,C,D

T-100

P-102A/B/C

MMF A/B

Bag Filter

UV Sterilizer

To Cleaning Tank

AntiScalant Dosing

Buffer Tank 36 Cu.m


12 Cu.m Effluent water will drain in effluent pit.

HP Pump A/B

Cartridge Filter

Cartridge Filter

HP Pump A/B

All water will be drain in effluent pit during flushing.

NOTE:
Before start up the RO plant 20 minutes Manual Flushing of 2nd pass will be done to flush the Membranes.1st pass will be in service and its permeate will taken in buffer tank to flush the Membranes of 2nd pass. For Flushing This Procedure Will Be followed. 1. Open The start Menu and select Manual command. 2. Open the Rejection valve of solenoid valve from PLC. 3. Open the inlet valve of solenoid valve form PLC. 4. Select the Pump #1 or 2 from PLC. 5. After flushing reverse procedure will be followed and start the plant on AUTO or MANUAL mode. 6. Green Thick Lines Show the Passing Way of Raw Water During Flushing.

T-200

Manual Flushing Before Start the 2nd pass of RO plant

P101A,B,C,D

T-100

P-102A/B/C

MMF A/B

Bag Filter

UV Sterilizer

Cleaning Tank

Biocide Dosing Cleaning Pump

Buffer Tank

HP Pump A/B

Cartridge Filter

Cartridge Filter

HP Pump A/B

Note:
After make up the level of treated water tank when we will stop the RO plant second flushing will be done for one minute. After second flushing treated water with Biocide will be add in 1st pass of RO by the force of cleaning pump in membranes to protect them from bacteria for One Minute.
Green Thick Lines Show the Passing Way of Biocide Dosing.

T-200

Biocide Dosing in 1st pass of RO

Design Parameters Of RO 1st Pass

Design Parameters Of RO 1st Pass

Design Parameters Of R.O 2nd Pass

Design Parameters Of R.O 2nd Pass

1. Low Water Pressure. 2. Low Pressure Of Instrument Air. 3. 1st pass Tripping at High level Of buffer tank. 4. 2nd pass tripping at Low level of Buffer tank.

Securities of RO Plant

1. Genesysis LF (Anti Scalant) 2. Genesol 30 (Biocide) 3. NaoH (Sodium Hydro Oxide)

Chemicals Used In RO Plant