3.1.2
3.1.4
3.1.14
Being followed
3.1.15
All "A" class checks pertaining to overhaul are to be duly signed by FQA and it is to be Being included in attached in SAP as per OGN/OPS/SYS/018. OH Report
DESCRIPTION
It was decided to ensure timely cancellation of PTWs in ERP system along-with the present system of cancellation in Hard copy. No PTW cancelled in Hard copy should be pending in ERP. As per the scheme, normalization has to be done after cancellation of PTW in the Online System. Station to ensure generating Normalization slip for system Normalization as it is presently being done through isolation slip.
STATUS
Being complied
REMARK
3.2.4
Performance of T-code ZPTWREG will be seen after adding further fields in selection criteria of this report e.g Planner group, & work centre. Status of LWC is not correctly visible in ZPTWREG if it is not printed. Print must be taken for reflecting correct status and compliance of safety recommendation
CC-ERP
3.2.5
Being followed
3.2.8
Additional priority type to be provided for postponing notification due to material shortage or S/D requirement. Also additional fields for remarks and S/D duration are to be explored.
D- Priority provided
Done by CC-ERP
3.3.2
A format has been finalized by station for the report on Bid information for a particular indent.The same is to be developed by ERP. Annexure-III
CC-ERP
3.5 - e-Procurement
SL.NO DESCRIPTION 3.5.1 At present about 78 % procurement is being done through SRM e-procurement process, therefore all the PR is to be initiated in Kcategory and it is to be changed to U-category at P.O stage for monitoring in OPI by site C&M section, as stated by ERP-PM group. Format for sending the data pertaining to Linking problem in OPI is provided by CC-ERP (MM) group. Annexure-IV STATUS Being followed compulsorily for all cases above 10 lacs. And also started for cases above 05 lacs REMARK
3.5.2
3.8.2
3.9.2
OS type Notifications especially developed in the system for general type of safety requirements Being But on day to day basis is to be raised by O&M users. followed. to follow extensively SA type notification which is designed for capturing all type of safety audit points is to be raised by Site safety department. CC-Safety to provide again the safety clauses of GCC to all stations for O&M contracts. Being followed. But to follow extensively Being followed
3.9.3
3.9.4
To be followed
3.9.6
OTHER ISSUES
2. BEING PREPARED BY MTP AFTER COLLECTING DATA FROM MAINT SECTIONS 3. FRO RECOMMENDATIONS SHOULD BE INCLUDED IN
ENGG DECLARATION
6. SYSTEM CALCULATING ONE DAY LESS IN ROLLING PLAN 7. NO. OF RUNNING HOURS IN RP IS TAKING SINCE
Deviation (both technical & administrative approvals) routing through SAP as per DOP, as it happens with PR. Printing of Purpose of a contract (Justification) in a service PR print through ZMM045b to be enabled PR reports for SRM cases
Electrical
AMC (2013-140)for MMI &PADO system M/s.Creative Services,Secunderabad of stage-l and MaxDna system of stage-ll Biennial maintenance contract for belt weighers at CHP at NTPC-Simhadri Biennial Maintenance contract for CHP Wagon Trrippler Weigh Bridges Biennial Comprehensive Maintenance contract for AAQMS AMC of CCTV System M/s.Elecon EPC PROJECTS Ltd., Vallabh Vidhyanagar,Gujarat M/s.Rice Lake Weighing Systems India Ltd., Kanchipuram M/s.Thermo Fisher Scientific India Pvt Ltd., Mumbai M/s Schnieder
M/s.Iyappan Engineering
M/s.CCI M/s.Trust House Technical Services M/s.Reineke M/s.IL Palakkad M/s.Yokogawa & Emerson M/s.Emerson Network Power M/s.Forbes Marshall
NMI