Association for Rainwater Storage and Infiltrations Technology under the ground
J apanese new technology product
SEKISUI TECHNO MOLDING CO.LTD
SEKISUI CHEMICAL CO.LTD ARSIT certified
for India
Registered distributor Ashwath Infratech Pvt Ltd
2014/6/3 2
Effective use of rainwater by CROSSWAVE

Flood control
Reuse
Fire fighting Water recharge
2014/6/3 3
How to use CROSSWAVE (1)
size1m1m0.2m
Cross and pile up one by one
Creating a space for rainwater
CROSSWAVE
Install under the ground and water stores inside CROSSWAVE
Utilization of the top of the ground
2014/6/3 4
How to use CROSSWAVE (2)
No use of concrete
Use plastic material (CROSSWAVE) & sheets only

Wrap CROSSWAVE with the sheets then pile up
Pile up CROSSWAVE
Pile up CROSSWAVE
Flood control
REUSE
2014/6/3
5
Purpose of CROSSWAVE (3)
CROSSWAVE can be
use mainly for 3 app..

a) Flood control
b) Rainwater storage
c) Rainwater recharge

b) Storage
Rain
Reuse
Inflow pipe
CROSS
WAVE
Covering

Sand basin
Include protection sheet &
lining sheet
For
groundwater
a) Recharge
Recharge
Pipe
Rain
Inflow
pipe
CROSS
WAVE
Covering

Inflow of the
basin
Include non-oven
sheet
a) Flood control
Rain
For river
orifice
Inflow pipe
CROSS
WAVE
Covering

Sand basin
Include Protection
sheet
Over flow
Over
flow
2014/6/3 6
Structure of water inflow
Setting up sand basin at the inflow
Get rid of deposits in the sand basin
2014/6/3 7
Reference projects (in Japan)

1.Under park

Under construction After completion
2.Under car parking

Under construction After completion
9200m3
1700m3
Available under
100m3 to over
10,000m3
2014/6/3 8
Excellent point 1
High surface load
Allow 25ton truck or 60ton rolling stock rolling
stock only
You can pile up Crosswave up to 4m high
(In case of large area)
Utilize surface!
4m
Covering
CROSSWAV
E
4
m
2014/6/3 9
Excellent point 2
High voids ratio
High void space per volume: Voids ratio= 95%
You can save the space
Waste soil become small
CROSSWAVE
Voids ratio= 95%
2014/6/3 10
Excellent point 3
Easy installation
You just pile up
Speedy installation
Example 1000m312weeks
No need of assembly & any connecting parts
No need of any big tools
J ust stack up!
2014/6/3 11
Site of construction (Japan, Flood)
< Digging > < Protection sheet >
< Liningsheet >
< Pile up >
< Cover in >
< Completion >
2014/6/3 12
Site of construction (India, Reuse)
< Protection sheet > < Lining sheet>
sheet>
< CW stacking>
Installed in Feb 2011
< Cover in>
2014/6/3 13
Site of construction (India, Recharge)
< Digging >
< Pile up >
< Cover in >
Installed in July 2011
2014/6/3 14
Other benefit
Cheaper cost than concrete system
No accident for over 10 years in Japan
Easy handling (Light weight 7.3Kg)
Space save (low cost delivery, save stock space)
Long life time= 50 years
Easy maintenance
Recyclable
Available change design after complete
2014/6/3 15
Comparison with another methods


Most major method is to use plastics material in Japan
Place Method Cost Void ratio
Installation
speed
Use top
Vertical
load
TOP
Pond
Very
good
Very
good
Very
Good
Impossible Impossible
Concrete pond Good Good Bad Impossible Impossible
UNDER
GROUND
Crushed stone
with brick
Good Bad Bad Possible Bad
CROSS-
WAVE
Good
Very
good
Good Possible Good
Concrete tank
(PC)
Good Good Bad Possible Bad
Concrete tank
(RC)
Bad Good Bad Possible Good
2014/6/3 16
Best selling product in Japan
No.1 share (30%) in Japan
Over 2000 cases adoption for last 10 years

Constraction results
P
o
n
d
a
g
e

Unit:10,000m3
Total project numbers
T
o
t
a
l


p
r
o
j
e
c
t


n
u
m
b
e
r
s

2014/6/3 17
Specification
Cross wave Spacer
CW-H CW-L
L X W X H (mm) 994X994X220 994X494X200 988X240X25
weight (kg) 7.3 7.7 0.8
Total load
25tons truck
0r 60 ton
rolling stock of
8 wheels
45tons truck
Or rolling
stock of 70
tons of 8
wheels
-
material Polypropylene or Recycled Polypropylene
CROSSWAVE SPACER
2014/6/3 18
Thank you very much
SEKISUI TECHNO MOLDING CO.LTD