Академический Документы
Профессиональный Документы
Культура Документы
Roll no.:L081040008
T Y B TECH (PRODUCTION)
FINISHED COMPONENT
Sequence Of Operation
A
B
C
2. Turning of hole C
C
3. Milling 50 x 15
Milling 50 x 15
Design
Principle of Design
üLocation
ü
üClamping
ü
üLoading & Unloading
Location
üLocating pads, Ring, Cams & pin are used to located surface A,
B, C on the fixture, to increase the accuracy of the workpiece.
Clamping
Strap
Clamp
C - Washer
Loading
1.Loosen the strap clamps.
2.
3.Place the job on the V – block
and locate it on three surfaces.
4.
5.Align the job by adjusting the
cams and then tighten the
strap clamp in 90 º.
6.
7.Then place the C – washer on
the pin and tight it with help of
nut.
8.
9.See that all the fasteners are
secured, so as to maintain the
accuracy of workpiece.
Unloading
QTY
1.Base plate 1
2.Angle Plate 1
3.V – Block 1
4.Cams 2
5.Strap Clamps 2
6.Ring 1
7.C – Washer 1
8.Resting Pad 2
9.Nut 1
10.Dowel 6
11.Soc. Headed cap screw 8
12.Setup block 1
13.Tenon 2
Base Plate
1.When there is a
considerable variation in
workpiece dimension
from batch to batch an
eccentric locator or cam
can be used.
2.
3.The eccentricity of the
cam can be varied by
rotating it.
Strap Clamp
1.These are made of rectangular
plates and acts like levers.
2.
3.The clamp is tightened by rotating
an hexagonal nut.
4.
5.One end of clamp presses against
the workpiece.
6.
7.It take care of any variation in
workpiece.
C - Wa s h e r