BHEL- Hyderabad
DESIGN OF NEW PULL STUD
BHEL- Hyderabad
DESIGN OF NEW PULL STUD
BHEL- Hyderabad
PULL STUD SUPPLIED WITH MACHINE PULL STUD MANUFACTURED IN SHOP
NEW PULL STUD
EXISTING METHOD
IMPROVED METHOD
ISO60 holders like heavy duty boring heads, the
latest U drill holders ISO60/ABS100 were mounted
on to the (with modified pull stud) machine spindle
and tested successfully.
107mm holes were drilled directly and even boring
operation carried out (with modified pull stud) for
250mm and 680mm bores.
All the cutters, shoulder mills, side and face cutters
and face mill cutters for 63mm to 550mm were
mounted (with modified pull stud) for different
operations.
BHEL- Hyderabad
IMPLEMENTATION
BHEL- Hyderabad
IMPLEMENTATION
(Steam Turbine Casing)
PARTING PLANE HOLES
IMPLEMENTATION
(125 MW IOCL PARADEEP, Steam Turbine Casing-Parting Plane)
BHEL- Hyderabad
125 MW IOCL PARADEEP, Steam Turbine Casing
Parting Plane holes(94, 107)
BHEL- Hyderabad
IMPROVEMENT IN TOOLING
IOCL PARADEEP (125MW), STEAM TURBINE CASING, PARTING PLANE HOLES DRILLING (UPPER HALF)
OPERATION
EXISTING PRACTICE IMPROVED METHOD
TOOLS USED
No. of
Tools
Drilling
Time
(min)
Setting
Time
(min)
TOOLS USED
Drilling
Time
(min)
Setting
Time
(min)
94x328mm Deep x14
Holes
Drills-32, 48, 60
7
765.33 30.00 Drill- 94
1
153.07 10
Boring- 60 to 94 (70, 80, 90, 94) 3061.33 40.00 Boring not required 0 0
107 x 278 mm Deep x2
Holes
Drills-32, 48, 60
8
92.67 30.00 Drill- 107
1
22.24 10
Boring- 60 to 107 (70, 80, 90, 100,
107)
500.40 50.00 Boring not required 0 0
84 x 175mm Deep x
8Holes
Drills-32, 48, 60
6
233.33 30.00 Drill -84
1
46.67 10
Boring -60 to 84 (70, 80, 84) 700.00 30.00 Boring not required 0 0
68 x 125mm Deep x 2
Holes
Drills-32, 48, 60
5
41.67 30.00 Drill- 68
1
7.81 10
Boring- 60 to 68 83.33 20.00 Boring not required 0 0
32 x 278mm deep,
M100 x 6 x 122mm deep,
CB-107mm x 65mm
deep x 4 Holes
Drills-32, 48, 60
7
148.93 30.00 Drill- 94, 32
4
49.92 20
Boring- 60 to 94 (70, 80, 90, 94) 512.00 40.00
Boring-94 to 107 (104,
107)
52 20
28 x 175mm deep,
M80 x 6 x 127mm Deep,
CB-84 x 25mm deep x
10Holes
Drills-28, 48, 60
7
255.83 30.00 Drill- 74, 28
4
77 20
Boring- 60 to 74 (70, 74)
CB-74 to 84
523.33 30.00 CB- 74 to 84 100 20
Sub Total
40
6918.17 390.00
12
508.71 120
Total
7308.17
628.71
EXISTING IMPROVED METHOD
Drill Size Speed (RPM) Feed (mm/Min) Drill Size Speed (RPM) Feed (mm/Min)
Drilling
32 200 20 68 500-800 25-35
48 160 20 84 500-800 25-30
60 120 15 94 500-800 25-30
107 500-600 25-30
Boring
70 120 6
80 120 6
90 120 6
100 100 5
107 100 5
BHEL- Hyderabad
IMPROVEMENT IN MACHINING PARAMETERS
BHEL- Hyderabad
BENEFITS (TANGIBLE)
= (. )
Machine Hourly Rate =Rs. 8571.09 (Taken From Process Planning Dept.)
No. of Gas-Turbine & Steam Turbine casing Machined in year 2012-13 = 5 no.
Earlier Improved Method Saving
Machining Time for each casing 243.61 Hrs. 20.96 Hrs. 222.65 Hrs.
Machining Cost for each casing Rs. 20.88 Lac Rs. 1.80 Lac Rs. 19.08 Lac
Total Machining cost for 4 casing ( In
Year 2012-13)
Rs. 83.52 Lac Rs. 7.18 Lac Rs. 76.33 Lac
BHEL- Hyderabad
Steam Turbine Casing
Parting Plane Machining
0
50
100
150
200
250
MACHINING
TIME (Hrs.)
243.61
20.96
EARLIER
IMPROVED METHOD
0
5
10
15
20
25
MACHINING
COST Rs. (in lacs)
20.88
1.8
EARLIER
IMPROVED METHOD
This Project was implemented for:
250MW Pipavav 9-FA, Gas Turbine Casings (1
st
250MW Gas Turbine
Supplied by BHEL Corporation).
125 MW IOCL Paradeep & 150 MW Hindalco Aditya Steam Turbine
Casing.
270 MW Turbo-Generator Stator Frame Machining. (Manufactured for
first time in BHEL Hyderabad)
EASINESS: Mechanical Clamping not required because it provides
Hydraulic Clamping.
WIDE APPLICATION : All type of holders can be mounted and heavy
cutters can be used. Also, now ISO60/BT50 reducers sleeves and ISO60
holder can be mounted directly on spindle.
CYCLE TIME REDUCTION: Cycle time reduced by means of better
parameters.
LESS MANUFACTURING LEAD TIME
BHEL- Hyderabad
BENEFITS (INTANGIBLE)
BHEL- Hyderabad