Project Name 1 2 Feeder Name 3 Cable 4 Work period 5 Workplace 6 Joint 7 Jointer 8 Remarks 20 . . . ~ 20 . . . PMJ Jointer Chief Engineer P M / / / / A p p r o v e d
PMJ(IJB) CHECK LIST 230kV 1C 2,000 SQMM Paya Lebar I ~ Paya Lebar II (F2) LS Cable Ltd LS Cable Ltd (Power Cable Construction Team) Spore NDC 38 Paya Lebar I S/S (J/B # 1 A /1) 132PMJ-003
Phase Heated Temperature Annealing Condition Remarks Starting time Reached time Heated hour R Y B 3. Cable Annealing Note : Annealing Heating : 85 3 Hr Cooling : above 5 Hr Description Measured Phasing out Neggering 1. Preparation Above 10 2. Material CHECK Lot No. Rubber Sleeve Insulator Plate Box No Description R Y B R Y B 132PMJ-003 L1 = 380mm L2 = 220mm
B Surface condition of insulator (Good or Bad) Measured Position L1 L2 1 L3 2 3 4 5 L1 L2 1 L3 2 3 4 5 R Y B Stepping L2 = 220mm 105mm 105mm 132PMJ-003 5. Semi Conductive Painter 250 950 250 220 90 Description Cable Cutting (From end of sheath) Measured SIDE A : 950 mm SIDE B : 460 mm Exposed Conductor SIDE A : 80 mm SIDE B : 80 mm Remove of Outer Semi-conductive layer SIDE A : 220 mm SIDE B : 220 mm Remove of outer Semi-Conductive Layers slope SIDE A : 80 mm SIDE B : 80 mm SIDE A SIDE B R Y B 6. Insert parts No. 1
2 3
4 5 6 SIDE A Shrinkable tube (No.1175 200A-450L) Coffin Box Shrinkable tube (No.1175 200A-450L) Protective casing (A) O-Ring Insulating flange SIDE B Y No. 9 Description Rubber Sleeve Checking of inserting parts Confirm of direction of SIDE A,SIDE B R B Y R B Y R B 220 40 30 40 580 30 460 Shrinkable tube (No.1175 200A-450L) Coffin Box Shrinkable tube (No.1175 200A-450L) Protective casing (B) O-Ring Shrinkable tube (No.1175 350A-900L) 132PMJ-003
7.Insert of Rubber Sleeve 1 2 5 L3 L2 L1 3 4 6 X Y X Y X Y X Y X Y X Y A B C A B C X Y X Y X Y A B C A B C 1 Phase Description 2 6 Description Phase L1 L2 L3 3 4 5 Before insert Before insert After insert Remarks After insert 132PMJ-003
8. Compression of Conductor
L1 L2 R Y B R Y B Before compression After compression L1 L2 L3 3 4
<Remarks>
Note :Check the dimension, before compression of conductor L3 Corona Shield 2 1 3 4 1 2 132PMJ-003
9. Rubber Sleeve Setting <Remarks>
R Y B Drawing Measured Drawing Measured D 1 D 2 Drawing Measured L 1 L2 L1 D1 D2 Teflon tape Marking Drawing Measured L 2
10. Supplementary treatment <Remarks>
Phase R Y B Drawing Measured Drawing Measured D 1 D 2 Drawing Measured D 3 Side A Side B 25 25 10 D1 D2 D3 132PMJ-003 11. Earth Connection Check Phase Measured meggaring Cross Bonding wire R Y B 12. Coffin box check Phase Sealing of coffin box Filling of compound R Y B