Вы находитесь на странице: 1из 22

What is an Oilwell?

Your idea.
2 CS
11/10/2014

Where to drill?

?
?

?
?
3 CS
11/10/2014

Finding Oil - SEISMIC

Seismic model

4 CS
11/10/2014

From seismic to drilling


Oil company (&
government) own the
raw seismic data

Government
offers blocks
to oil company

Oil company studies


the prospect. Calls
for seismic.

Seismic company
shoots seismic
survey

The whole cycle can take 3-10 years..


Oil company
evaluates the result

Seismic company
process seismic data

Oil company
calls for bids to
drill well

- YES, production

Oil company (&


government) own
the final seismic
data

- NO: redo,
relinquish, farm out?
5 CS
11/10/2014

Drilling
exploration
well

Oil company studies


the final seismic data
for drilling decision

BUILDING an OILWELL

6 CS
11/10/2014

Drilling Rig

7 CS
11/10/2014

How an Oilwell Looks Like

Conductor casing
36in,
30in, 24 in,..
piled in
Preventing cave-in

8 CS
11/10/2014

hydrocarbon

Drilling fluid (MUD)


1) Cleaning up
cuttings
Mud system

2) Lubricating drill bit


3) Well control
Formation does exert pressure!
What can happen when it is not
controlled?
Hydrostatic pressure, formula:

9 CS
11/10/2014

hydrocarbon

Surface casing

20in, 13 3/8in,
Protecting fresh water
zone

Cementing (Well
Services)

10 CS
11/10/2014

hydrocarbon

Drilling &
Measurement
Intermediate casing

9 5/8 in, 7in,


Sealing off trouble zones

11 CS
11/10/2014

hydrocarbon

Wireline

Basic measurements:
- Gamma ray
- Caliper
- Neutron
- Resistivity
- Sonic

Production casing
7in, 41/2in
Production!
12 CS
11/10/2014

hydrocarbon

TESTING

13 CS
11/10/2014

Will it flow? For how


long? What is the
pressure?

What hydrocarbon?
What quality?

Is it economical?

hydrocarbon

Completion
Completing the
well to produce
Monitor &
control the well
production
during its life

14 CS
11/10/2014

hydrocarbon

Artificial Lift

Reservoir pressures do not sustain


acceptable flow rates or incapable of
producing fluid flow at all.

When water cut increases and/or the


Reservoir Pressure declines over time.

Artificial Lift Application

500

Flow Rate
1,000

BBl /day
10,000

Beam Pump
PCP

Jet (Hydraulic)
Gas Lift
15 ESP
CS System
11/10/2014
Good to Excellent

Fair to Good

Poor, not Recommended

What can happen during production?


Remember that driling phase vs production
phase is 1-3 months vs 20-50 years!
Casing
corrosion

Sand
production

water production

Oil

17 CS
11/10/2014

Reservoir
depletion..

Cement bond
deterioration

SCALE

STIMULATION (WS)

COILED TUBING (WS)

18 CS
11/10/2014

Cleaning up scales with


chemicals (eg. acids)
Controlling sand production
Bypassing damage with
FRACTURING

Cased hole services (WL)


Analysis behind casing
Production logging
CBL / USIT / Isolation scanner

19 CS
11/10/2014

From the birth through the lifetime of the well..

SIS: various softwares to optimize well performance


From geology to geophysics, petrophysics, borehole geology, mapping,
modeling and visualization, drilling, economic planning,

DCS: expert interpretation and engineering services


throughout the E&P cycle, from exploration to asset divestiture

20 CS
11/10/2014

In the field, what you imagine vs what you might see:


Road to work

21 CS
11/10/2014

In the field, what you imagine vs what you might see:


The Rig
Not shown in picture:
temperature 49 C

22 CS
11/10/2014

In the field, what you imagine vs what you might see:


The Activities

23 CS
11/10/2014

Вам также может понравиться