Академический Документы
Профессиональный Документы
Культура Документы
on GMP
Air Handling Systems
Heating
Ventilation and
Air Conditioning (HVAC)
Part 3: Design, qualification
and maintenance
Module 3, Part 3: Qualification and maintenance
Slide 1 of 27
WHO - EDM
Slide 2 of 27
WHO - EDM
Uni-directional / laminar
0,30 m/s
Annex 1, 17.3
Module 3, Part 3: Design, qualification and maintenance
Slide 3 of 27
WHO - EDM
turbulent
uni-directional (laminar)
GMP aspect
economical aspect
Slide 4 of 27
WHO - EDM
Prefilter
Annex 1, 17.3
AHU
Main filter
Turbulent
Uni-directional
Slide 5 of 27
Turbulent
WHO - EDM
Cabin/ booth
Slide 6 of 27
Ceiling
WHO - EDM
Production Room
Production Room
HEPA Filter
Slide 7 of 27
WHO - EDM
Prefilter
AHU
Main filter
Ceiling
exhausts
2
Slide 8 of 27
WHO - EDM
Final filter
AHU
Prefilter
Slide 9 of 27
WHO - EDM
100% exhausted or
a proportion re-circulated
GMP aspect
economical reasons
Annex 1, 15.10, 17.24
Slide 10 of 27
WHO - EDM
Exhaust Unit
W
Slide 11 of 27
WHO - EDM
Return air
Module 3, Part 3: Design, qualification and maintenance
Slide 12 of 27
WHO - EDM
at rest
in operation
air
air
air
Slide 13 of 27
WHO - EDM
Process validation
Adequate documentation
Slide 14 of 27
WHO - EDM
Test
Turbulent / mixed
airflow
N/A
2, 3
2, 3
Optional
Parallelism
N/A
Description
Annex 1, 17. 4
IQ tests are not mentioned on this slide
Slide 15 of 27
WHO - EDM
Uni-directional
airflow / LAF
Test
Turbulent / mixed
airflow
Description
Recovery time
N/A
2,3
Temperature, humidity
N/A
2,3
Annex 1, 17. 4
Slide 16 of 27
WHO - EDM
2.
1.
ACTION LIMIT
ACTION LIMIT
ALERT LIMIT
ALERT LIMIT
Design Condition
Slide 17 of 27
WHO - EDM
Sampling point
Slide 18 of 27
WHO - EDM
Shutdown
Replacement of filter elements
Maintenance of air handling systems
Exceeding of established limits
Annex 1, 17.37
Slide 19 of 27
WHO - EDM
Class
A, B
<= ISO 5
C, D
> ISO 5
All Classes
Air Flow
All Classes
Maximum Time
Interval
6 Months
12 Months
12 Months
12 Months
Test Procedure
Slide 20 of 27
WHO - EDM
All Classes
Maximum Time
Interval
24 Months
Containment Leakage
All Classes
24 Months
Recovery
All Classes
24 Months
All Classes
24 Months
Test Parameter
Class
Test Procedure
ISO 14644-1 Annex B6
Slide 21 of 27
WHO - EDM
3.
4.
5.
6.
7.
Slide 22 of 27
WHO - EDM
2.
3.
4.
5.
6.
7.
8.
Operating procedures
Maintenance instructions
Maintenance records
Training logs
Environmental records
Discussion on actions if OOS values
Walking around the plant
Slide 23 of 27
WHO - EDM
Slide 24 of 27
WHO - EDM
Slide 25 of 27
WHO - EDM
Service Corridor
(contains Vacuum & RO water supply)
Air Shower
A/ Lock1
Air Lock2
Warehouse
Weighing
Tablet 1
Tablet 2
Liquids Mix
Softgel Capsule
Packing
Clean Corridor
Emergency
Exit
Air Lock 3
Equipment Wash
Sterile eyedrops
dispensing
& aceptic filling
2 Stage
personnel
entry for
eyedrops
Male
Change 2
Female
Change 2
Packed
Goods
Quarantine
Male
Change 1
Female
Change 1
Air Lock 4
Slide 26 of 27
Service Room
WHO - EDM
20Pa
0Pa
Service Corridor
(contains Vacuum & RO water supply)
30Pa
Air Shower
20Pa
10Pa
MAL 2
Warehouse
0Pa
Weigh
Booth
20Pa
30Pa
Post
Staging
Tablet 1
30Pa
Tablet 2
15Pa
Softgel Capsule
Packing
Liquids Mix
15Pa
30Pa
MAL1
Air Lock
15Pa
30Pa
Clean Corridor
Emergency
Exit
PAL
40Pa
MAL 3
40Pa
Sterile eyedrops
dispensing
& asceptic filling
20Pa
20Pa
Male
Change 2
Female
Change 2
10Pa
60Pa
15Pa
Equipment Wash
MAL 4
50Pa
Change
50Pa
10Pa
Male
Change 1
Female
Change 1
10Pa
Packed
Goods
Quarantine
Air Lock 4
0Pa
Secondary
Packing
20Pa
30Pa
Service Room
0Pa
Slide 27 of 27
Primary
Packing
WHO - EDM
0Pa