Physical Verification
Alarm Checking
Frequency Plan Verification
Hardware Configuration Verification
Physical Verification
Physical Verification is carried out by verifying physical parameter of the
New Site with the TSSR (Technical Site Survey Report) such as Address, Lat,
Long, Building Height, Antenna Height, Antenna Type, Orientation, Tilt.
Alarm Verification
Alarms are generated mainly due to number of reasons, and these needs to
checked before Drive is being carried out for the Site. Alarms are checked from
the NOC (Network Operating Centre) and if found needs to be verified before
drive being carried out.
Frequency Plan Verification
Frequency Plan can be verified from the NOC (Network Operating Centre)
for BCCH and TCH frequencies being implemented as per the Site Integration
Sheet sent to NOC (Network Operating Centre).
Hardware Configuration Verification
Hardware verification is performed to know the Site type, BTS Type, TRX
Configuration, VSWR checking , Power measurement for each TRX.
Confidential
Confidential
Confidential
Confidential
Confidential
Confidential
Intra Handover is performed to check whether handover is taking place both ways
on the Site.
Handover is performed among all the Sectors of the Site.
Inter Handover is performed to check whether handover is taking place both ways
on the Site with its adjacent neighbor. Handover needs to checked mandatorarily
for primary neighbor.
Handover is performed with all the defined neighbor's in the integration sheet.
Handover is performed for
only those cells whose BCCH
and BSIC is decoded in the
window shown aside
Confidential
TRX Test
TRX Test is done to check whether calls originated are being handled by all the TRXs.
Call made during the process is tracked by the MAIO number displayed on the screen
for all the TRXs.
e.g. for Site of configuration 6 TRX per sector the MAIO values for TRX test shall be
0,1,2,3,4. Call can be originated on the BCCH or the TCH frequencies. Hence MAIO
values will be reflected only for calls on TCH frequency and not on BCCH frequency.
Confidential
Dedicated Drive
Dedicated drive is an important part of Drive Test. Here call is made to a
test number and drive is done for the potential areas of the Site. During
drive being carried out one has constantly monitor parameters such as
RX Level, RX Quality, SQI, DTX, C/I Ratio, Hopping Channel, Neighbor
list, TA (Timing Advance).
Thank You!