INTRODUCTION
Jaipur metro rail corporation Ltd. is established to plan ,
design ,develop, construct,maintain,operate & finance
Rapid and mass people transport system.
Its started operating on January 20th ,2010.
The 1st project of this corporation is Jaipur Metro .
Jaipur metro phase 1st A covers Mansarovar to Chandpole.
Safety Measures
Safety means first aid to the uninjured
SAFETY
HELMET
HARNESS
SAFETY
SHOE
GLOVES
RAILWAY TRACK
FEATURES
Choice of gauge is 1435 mm
. It is a standard gauge.
Ballastless and continuous
welded rail track is opted
for metro track but ballast
track can be seen at
mansarovar metro depot.
Ballastless track has
advantages such long life
cycles, top speed, ride
comfort, and great loadcarrying capability.
UNDERGROUND SECTION
CONSTRUCTION
As per Jaipur metro has 8 elevated and 1 underground
section.
Underground section is constructed by TOP DOWN
METHOD.
From this method top slab is casted with rigid connections
with diaphragm wall.
FINISHING WORKS
Flooring is of Kota stone flooring
and tectile are used for blind
person .
Steel net is used for plastering the
joint of column and wall for
esthetic look.
TECTILE
KOTA STONE
BIBLOGRAPHY
Diaphragmwallconstruction.com/
europeanrailwayreview.com
gstatic.com
jaipurmetrorail.in/
Kotasone.org
CONCLUSION
It is very wonderful learning experience at Jaipur metro rail
corporation ltd Jaipur metro project for 45 days in Jaipur.
The experienced shared by the employees which they
gained. In this time I have learned many new things which
will surely help me in future and shaping my career
THANK YOU