Академический Документы
Профессиональный Документы
Культура Документы
is an essential part of
the settlement system.
Quantities metered
Active Power, P
Reactive Power, Q
Frequency, f
Voltage, V
Power factor, cos Ǿ
“ Metrology ”
the science of
measurement
“ Measurement ”
determining the value of a
quantity,
with
- ACCURACY
- REPEATABILITY
- REPRODUCIBILITY
- PRECISION
- RESOLUTION
Section 28 (3) of the Electricity
Act 2003
‘The Regional Load Despatch Centre shall
b) ..
TO AVOID DISPUTES
TRADE Rs. 2.20/ u
Rs. 2.00/ u
R for 10 MW
for 10 MW
PAYMENTS
A B
UI for UI for
2 MW 2 MW
UI POOL A/C
SRLDC
WRLDC
MSEB / SCHEDULING, AP
MSLDC METERING, TRANSCO/
APLDC
UI
SETTLEMENT
TATA DISCOM-A
POWER
AGREEMENT
& PAYMENT
FOR
SCHEDULED
QUANTUM
ENERGY ACCOUNTING
Further apportioning/recovery of UI
charges from the various Discoms and
embedded customers in the State -
EVALUATION OF STATE DRAWAL
USING SPECIAL ENERGY METERS
STATE ‘A’ ∑ HV SIDE OF 400/220 kV ICTs exclusively
DRAWAL = feeding state ‘a’
+
∑ Inter state lines operating in integrated mode
metered at state ‘A’ end
+
∑ Lines from ISGS/CTU/BBMB (220 kV & above)
stations to state ‘a’ metered at state ‘a’ end
+
∑ HV side of 220/132 kV, 220/66 kV and 220/33 kV
ICTs in case of BBMB & PDD, J&K substations
exclusively feeding state ‘A’
+
∑ Radial inter state infeeds to state ‘A’ metered at
sending end
• Recording in secondary
quantities. CT/CVT ratios to
be applied at control centre.