Академический Документы
Профессиональный Документы
Культура Документы
Outline
Introduction/review of graphs
Some basic graph problems &
algorithms
Start of an example question from
ICPC07 (Tunnels)
Relation to Contests
Many programming contest problems
can be viewed as graph problems.
Some graph algorithms are
complicated, but a few are very
simple.
If you can find a way to apply one of
these, you will do well.
Directed Graphs
G = (V, E)
V = set of vertices
(a.k.a. nodes)
E = set of edges
(ordered pairs of nodes)
Directed Graph
V = { a, b, c, d }
E = { (a, b), (c, d), (a, c), (b, d), (b, c) }
b
a
d
c
Undirected Graph
V = { a, b, c, d }
E = { {a, b}, {c, d}, {a, c}, {b, d}, {b, c} }
b
a
d
c
d
c
Computer Representations
Edge list
Hash table of edges
Adjacency list
Adjacency matrix
Edge List
0 1
0 2
1
3
0
2
2 3
Often corresponds to the input format for contest problems.
Container (set) of edges may be used by
algorithms that add/delete edges.
Adjacency List
with two
arrays:
1
3
0
2
with pointers
& dynamic
allocation:
0
1
2
3
4
0 1 2 3 4
0 2 4 4 4
0 1 2 3 4
1 2 2 3 3
1 2
2 3
3
1
3
0
2
good for storing information about nodes or edges, e.g., edge weight
Adjacency/Incidence Matrix
A[i][j] = 1 (i,j) i E
A[i][j] = 0 otherwise
3
2
1 2 3
0 0 1 1 0
1
0
1 0 0 1 1
2 0 0 0 1
3 0 0 0 0
MaxFlow (MinCut)
Iterative flow-pushing algorithms
Floyd-Warshall Algorithm
Assume edgeCost(i,j) returns the cost of the edge from i to j
(infinity if there is none), n is the number of vertices, and
edgeCost(i,i) = 0
int path[][]; // a 2-D matrix.
// At each step, path[i][j] is the (cost of the) shortest path
// from i to j using intermediate vertices (1..k-1).
// Each path[i][j] is initialized to edgeCost (i,j)
// or if there is no edge between i and j.
procedure FloydWarshall ()
for k in 1..n
for each pair (i,j) in {1,..,n}x{1,..,n}
path[i][j] = min ( path[i][j], path[i][k]+path[k][j] );
* Time complexity: O(|V|3 ).
Details
Need some value to represent pairs of
nodes that are not connected.
If you are using floating point, there is a
value for which arithmetic works
correctly.
But for most graph problems you may want
to use integer arithmetic.
Choosing a good value may simplify code
When and why to use F.P. vs. integers is an interesting side discussion.
Example
How it works
path[i][k]
path[i][j]
paths that go
though only
nodes 0..k-1
path[k,j]
Correction
In class, I claimed that this algorithm could be adapted to find
length of longest cycle-free path, and to count cycle-free
paths.
That is not true.
However there is a generalization to find the maximum flow
between points, and the maximum-flow path:
for k in 1,..,n
for each pair (i,j) in {1,..,n}x{1,..,n}
maxflow[i][j] = max (maxflow[i][j]
min (maxflow[i][k], maxflow[k][j]);