Вы находитесь на странице: 1из 82

Madura Clothing

Process Improvement Initiative

Process SOP Docket CCPL

Apr, 2011

Rashmi Rao, Projects, Madura Clothing

Table of Contents

Version Control Sheet

Glossary of Process Elements

Key Process Stakeholders and Roles

L0 Process Workflow

L1 Process Summary

L1 Process Detailing

Rashmi Rao, Projects, Madura Clothing

Table of Contents

Version Control Sheet

Glossary of Process Elements

Key Process Stakeholders and Roles

L0 Process Workflow

L1 Process Summary

L1 Process Detailing

Rashmi Rao, Projects, Madura Clothing

Version Control Sheet


Process Name

FCL & CCPL Process Mapping

Version

V1.0

Prepared By

Rashmi. Rao. M

Published On

REVIEWED BY
#
1

Name
Abhishek Kumar

Brand

Designation

Madura Clothing

Projects Manager

Date

2
3
4
5

AMENDMENT LOG
#
1

Version Number
Version 1

Amended By
Rashmi. Rao. M

Date
6-05-2011

2
3
4
Rashmi Rao, Projects, Madura Clothing

Table of Contents

Version Control Sheet

Glossary of Process Elements

Key Process Stakeholders and Roles

L0 Process Workflow

L1 Process Summary

L1 Process Detailing

Rashmi Rao, Projects, Madura Clothing

Processes have been designed to cover Process Maps,


Policies, Templates, KPIs and RACI Charts
Process Documentation Scope
How is the process carried out and by which functions ?
Captures the basic operational flow and the steps to be followed

Process
ProcessMaps
Maps

Who plays what role in the execution of the process ?


Captures roles and responsibilities of the persons directly involved

RACI
RACICharts
Charts
Cross-functional
Cross-functional
Touch
TouchPoints
Points

Which other functions need to be involved in process execution?


Captures the areas where other functions are to take the process ahead

Policies
Policies

What guidelines are to be followed in running the process ?


Captures key decisions/rules guiding the functioning of the process

KPIs
KPIs

How can the success of the process be measured ?


Captures the metrics against which performance can be measured

Input
Input/ /Output
Output
Templates
Templates

What analyses and formats are used to support the process ?


Captures standardized formats of documents used in different process steps

Glossary of Shapes used in this Document


External
process

L2 processes
within L1 process

Notes (1) : R Responsible

Inter-linked L1
processes

A Accountable

Input
Interfaces

C Consulted

Output
Interfaces

I Informed

T - Template

Decision

Event

Stored Data

Rashmi Rao, Projects, Madura Clothing

Table of Contents

Version Control Sheet

Glossary of Process Elements

Key Process Stakeholders and Roles

L0 Process Workflow

L1 Process Summary

L1 Process Detailing

Rashmi Rao, Projects, Madura Clothing

Key Stakeholders Roles / Designations


Designation
Head Manufacturing

Role Description

Reporting
Authority

Head of In-house Manufacturing (Madura Clothing)

President

General manager

Heads individual domains such as shirts, trousers and suits, IE

Head Manufacturing

Factory Manager

Heads the factory, responsible for general management

GM

Responsible for the technical part of the factory

GM

Technical manager
Manager-WCM
Manager-HR

Head WCM
Head HR

Manager-Finance

Head Finance

Asst manager- project

Head projects

Asst manager-WCM
Asst Manager- HR

Responsible for
Head OD

Head Manufacturing
Head Manufacturing And
HR-VP
Head Manufacturing

Head Manufacturing
Head Manufacturing
Head Manufacturing

Rashmi Rao, Projects, Madura Clothing

Key Stakeholders Roles / Designations


Designation

Role Description

Reporting
Authority

Plans and allocates available manufacturing capacity for executing work orders is liaison
between manufacturing and brands

Head
Manufacturing

Responsible for managing production

Factory Manager

Responsible for management of fabric / trims warehouse - inwards, storage and issue- to own
and outsourced factories

Factory Manager

Responsible for sample production

Factory Manager

Responsible for pattern-making / CAD marking for in-house production

Factory Manager

Ensure production capacity availability for third Party Business and Product Costing of Styles ,
Ensure on-time delivery to customers .Retaining Customer and Vendor for sustained Business .

Head Manufacturing

Responsible for factory production planning

Factory Manager

CAD In-charge

Responsible for making markers style wise and fabric consumption planning

Factory Manager

Cutting Officer

Responsible for managing cutting and fusing

Factory Manager

Responsible for packing and finishing

Factory Manger

Responsible to set and maintain the quality systems in factory.

Factory Manager

Responsible for Dispatch

Factory Manager

Responsible for productivity and efficiency

Factory Manager

Responsible for recruitment, induction, canteen , security and legal compliance

Manager HR

Responsible for timely payment and benefits administration.

Manager HR

Responsible to maintain the IT Infrastructure in the factory

Factory Manager

Central Planners
Production officer
Store In-charge
Sampling In-charge
Pattern Master
Merchandising executive
Production planning
executive

Finishing In-charge
Quality Officer
Ware-House In-charge
Senior Industrial
Engineer
HR executive
Payroll and compensation
Officer
IT In-charge

Rashmi Rao, Projects, Madura Clothing

Key Stakeholders Roles / Designations


Designation
Lab In-charge
WCM Executive
Maintenance Officer
Safety Officer
Utility Officer
Vapour Phase
supervisor
Embroidery In-charge
MIS executive
Central MIS
Accounts officer

Reporting
Authority

Role Description
Ensure effective lab quality system and processes are adhered to the standard

Factory Manager

Assist in implementation of 8 dimensions of WCM

Manager WCM

Responsible for preventive maintenance and breakdowns

Factory Manager

Responsible for establishing and complying safety, health and environment rules / norms in
factories.

Manager HR

Ensure upkeep of all electrical installations ,UPS, generators, boilers,STP,vapour

Factory Manager

Coordinating with production and finishing department to meet timelines as per the plan for Vapor
phase production

Factory Manager

Develop embroidery designs as per brand requirement and coordinate with cutting and sewing
department to meet timelines for production.

Factory Manager

Collect and compile all Management information reports for factories and Highlight the deviations
for the necessary actions to all concerned
Ensure Accuracy of financial and operation al reports as per timelines , analysis of variances and
highlight deviations to FMs and HOM

To ensure correct and timely accounting and reporting of financial transactions, as per the
SOPs of the company and to ensure financial control and financial proprietary so as to
facilitate meeting legislative requirements and optimizing shareholders value.

Factory Manager
Head Manufacturing
Manger - Finance

Rashmi Rao, Projects, Madura Clothing

10

Table of Contents

Version Control Sheet

Glossary of Process Elements

Key Process Stakeholders and Roles

L0 Process Workflow

L1 Process Summary

L1 Process Detailing

Rashmi Rao, Projects, Madura Clothing

11

Macro level process


Core and Supporting processes
Storage

1
Business
Strategy &
P&B

Value creation

2
Stores

Lab

4
Planning

Deliver

CAD

6
Cutting

Sewing &
finishing

Warehouse

8
Merchandising and IE

9
Quality

10
People
11
Finance and Accounts
12
Maintenance and IT

Core Processes
Rashmi Rao, Projects, Madura Clothing

Enablers
12

L1 Processes(FCL)
L1 processes
1. Stores
2. Lab
3. Centralized Planning
4. Factory Planning
FCL

5. CAD
6. Cutting
7. Sewing
8. Finishing
9. Warehouse
10. IE
11. Maintenance
12. Vapour Phase
Rashmi Rao, Projects, Madura Clothing

13

L1 Processes in Stores
L1 processes
1. Stores
1. Receipt of material in stores
Stores

2. Issue of materials
3. Material requisition, indent, purchase
order follow up
4. Receipt, verification & issue of
products purchased
5. Approval of new supplier
6. Supplier evaluation & re-evaluation

Rashmi Rao, Projects, Madura Clothing

14

Process Map : Receipt Of Material In Stores


Manufacturing
(Store)
Start

1 Receipt of materials with

supplier invoice /DC

Fabric: P.O, supplier name,


material code, ordered qty.,
Received qty., Visual
parameters, laboratory test &
design approval from brand

Trims: P.O, supplier name,


material code, ordered qty.,
Received qty., Visual
parameters, lining, buttons &
labels, items overview

OK

Inspection

5 Preparation of goods

Quantity confirmation

receipt note

Entry in Goods Inward


Register

Updation of stock in
SAP system

Entry of material in
identified location in
stores

Not OK

Entry in Goods Inward


Register

7 Rejected material placed in

Updation of quantity in SAP

identified location
End

External
process

L2 processes
within L1 process

Quantity confirmation

Inter-linked L1
processes

Preparation of Rejected Goods


Return note

Input
Interfaces

Output
Interfaces

8 Rejected material sent back to

supplier with DC

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

15

Process Map : Issue Of Materials

3 Issue of 10 cm fabric

to cad for marker


consumption

Start

4 Receipt of cad

consumption

5 Amendment of production

order and BOM as per cad


consumption

6 Preparation of cutting

order

Manufacturing
(Store)

Download of production
order and BOM through sap

INFORM BRAND &


CORRECT BOM
3 Receipt of material requisition

Issue of material

from production for sewing and


packing accessories

No

Verification of
material requisition
with BOM

Yes

Issue of materials to
production as per PPC(cut
qty)

End

Updation of issued qty in


sap

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

16

Process Map : Material Requisition, Indent, Purchase


Order Follow Up

Revise

Start
1 Receipt of Material

Verification by
12 A/c officer as
per budget

11 Approval by Stores-in charge &

requisition slip

Department in charge
Manufacturing
(Store)

Stock
2 verification
of material

Not in stock

3 Enquiry sent to approved

supplier through mail

Follow up with supplier

Purchase as per budget


9 Approval of quotation

by Factory Manager
Yes

14Final approval by Factory

Manager
Material collected as per
requisition

Follow up with supplier

17 Purchase Order sent to


13 Approval by Accounts

Officer
4

18
No

Yes

10 Material indent raised by

In stock

Sufficient material in stock inform


process owner

End

Verification
8 of quotation

7 Receipt of quotation

from supplier

No

Inform supplier for


revised quotation

supplier and obtain


acknowledgement through
mail
16 Approval by Stores-in

charge and Final approval


by Factory Manager
Yes

15

Preparation of
Purchase Order in Tally

15

Verification of PO
by Stores in
charge as per
indent
No

Revise

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

17

Process Map : Receipt, Verification & Issue Of Products


Purchased
Manufacturing
(Store)

Start

Receipt of material from


supplier with invoice as per PO
8
2

Verification of
quantity by
Security &
purchase

Yes

No

Inform supplier & accept the


material

Incoming
inspection for
3
quality by
concerned dept.

4
Yes

Submission of GRN along


with PO to accounts department
& take acknowledgement

Preparation of
inspection report

Physical transfer of
material to the concerned
process owner through
material requisition and
take acknowledgement

No

Material sent back to supplier

5 Preparation of GRN by

Purchase in Tally

Store material in allocated


area, provide identification
and maintain traceability
records

10

Entry of issue in Tally

6 Approval of GRN by Accounts

End

and Final approval by Factory


Manager

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

18

Process Map : Approval Of New Supplier

Rejected

Start

No

Manufacturing
(Store)

Identification of new supplier


5 Procure samples from

suppliers

2 Compile Data about

Yes

Approve, establish and


maintain records of
approved supplier by AO

ability of supplier

3 Select the supplier For

Assess quality
and cost of the
product

Evaluation

Visit the supplier

Creation of supplier
ledger in Tally
End

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

19

Process Map : Supplier Evaluation & Re-evaluation


Manufacturing
(Store)

Start
If graded C, inform supplier in
writing for improvement for the next
three consecutive POs
1

If graded D, remove from approved


supplier list.

Prepare supplier list


Communicate rating to supplier
as per grade
A -90-100, B -80-90, C- 60-80, DBELOW 60.

Define the Criteria for


Evaluation/re-evaluation Such
as Quality, delivery & service

Rate performance once in 6


months. Statistically analyze
performance of suppliers for continual
improvement
5

3 Fix weight age for each of

the Criterion as mentioned


above for each supplier

4 Monitor Performance

7 Obtain Acknowledgement from

supplier
End
8

Monitor the corrective action by


the supplier (Whenever Necessary)

based on evaluation

Evaluate
Effectiveness

11Continue appraisal & re-

appraisal

10
Yes

Retain the supplier In


Approved supplier List

No

Withdraw supplier approval


and amend approved supplier
list

Communicate to supplier

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

20

L1 Processes in Lab
L1 processes
1. FCL Lab Process

Lab

Rashmi Rao, Projects, Madura Clothing

21

Process Map : Lab


Fabric , trims, garments

Sourcing /
PDQA

8 Approved?

No

Yes

Fabric ,trims, garments

Manufacturing
(Store)

Start

Receipt of sample

9
Send back test report signed copy to
Lab, photocopy forwarded to store

4
Carry out Test as per standard test
method (AATCC, ASTM, ISO)

Lab
2

5
Enter detail in register

7
Prepare hand written draft report/
Enter test details in register

3
Decide type of Test Package, cut &
distribute to concerned technician

6 Result
Approved?

Send test report along with tested


specimen to QA Manager-RM for final
approval

10
Keep all test reports in Box File in
sequence/ Keep record in register

No

11
Discard tested & untested sample as
per Lab sample retention policy

Yes

Bulk - Enter result in SAP & accept.


Other cases: Send PDF report to
concerned Person

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

End

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

22

L1 Processes in Centralized Planning


L1 processes
1. Centralized Planning

Centralized Planning

Rashmi Rao, Projects, Madura Clothing

23

Process Map : Centralized Planning


Brand

2
Month-wise plan
at Style code level
3
WO Creation

5 BCDS Process
implementation with Cut-of
date

Correcting BOM

End

Start

Yes

1
Risk Analysis for Quality
feasibility with A4
size swatches

21 Variance analysis
& TECO

Status
4 Visibility
No

10 Costing rectification by
brand SC

PPC(Factory)

Fortnight Plan for cutting, sewing


11 & dispatch based on line
capacity, Garment styling

6
WO Download and Review with
Factory Capacity blocked

Yes

WO Cancellation/ change in order


qty in case of partial fabric or
trims avblty within 1 wrkng day by
brand SC

7
No

Trims & Fabric


Avblty after
Testing

8
Yes

Gold Seal
Avblty
No

WO Cancellation by
brand SC

Milestone confirmation
against Plan for Cutting,
19 Sewing, Finishing and
dispatch

12
Marker Preparation

Correct
9 Costing &
Routing

20 Brand commitment
date follow-up

18
Cross verification of Fab consm
BOM v/s Marker & trims BOM
13
(In case +-5%)

No

14

Correct
BOM

Yes

17

WO release

Fabric ready

16
Trims checking

15
BOM & WO print

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

24

L1 Processes in Factory Planning


L1 processes
1. FCL Factory Planning Process

Factory Planning

Rashmi Rao, Projects, Madura Clothing

25

Process Map : Factory Planning


Highlight to brand & correct

BCDS

Brand

Reschedule with higher


authorities approval

No

Check fabric,
trims &
5
consumables
available as per
BOM

PPC(Factory)
1
Receipt of BCDS

13 Schedule for

Yes

6 BOM correction as

per actual

No

Start

7
4
Check gold
2 seal & fabric
availability

Yes

12

Is OPBD
available

Is Garment
treatment

12 Follow up
No

Yes

Yes

13

WO & BOM
Yes
Yes

Swatch
3 collection &
risk analysis

No

Highlight to brand & get


gold seal

No

Highlight to brand &


correct

Plan based on delivery


requirement

11 Milestone confirmation

9 Block line based on expected

10 Schedule for cutting &

efficiency & allotted capacity

loading

New style

Stores

No

garment treatment

(CO11N)

Schedule for pilot run

14

15

Dispatch on
scheduled date

OCR

TECO
End

Check for fabric & trims


availability

Check with IE dept

IE

Pilot run & follow up

Production

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

26

L1 Processes in CAD
L1 processes
1. FCL CAD Process
1. Sample development
CAD

2. For regular production


3. Sample Pattern development

Rashmi Rao, Projects, Madura Clothing

27

Process Map : CAD (Sample Development)


Merchandising
Dept

Sample indent

CAD
(Sampling
Section)

Start

Sending fabric requisition


3
to stores

Manual hard pattern

Pattern available / Make


2. c the new pattern

Receipt of sample
indent

2Updation of indent details


in system

Yes

Check the W/O


2. a creation for the
Indent in SAP

2. b
Yes

Sample cutting

7 Trimming/Spot wash

End

No

Inform the brand


merchandiser

L2 processes
within L1 process

Correction

Inter-linked L1
processes

Grading & Final

13 Gold Seal Sample


ready for production

Final
8
inspection
No

No

External
process

Dispatch

Rework / Inform to
brand

No

Brand
(Merchandiser
& designer)

12

Pressing

Buttoning & button hole

Yes

Check the
availability of
Fabric, Trims &
Accessories in
stores

11

10 Folding & packing as


per indent details

Stitching

Input
Interfaces

Output
Interfaces

Yes

14 Approval

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

28

Process Map : CAD (For Regular Production)


Stores

WO with swatches

CAD

Issue consumption to stores

Receipt of WO
4 Measure fabric repeat & width
before preparation of marker

5
Prepare the ratio as per WO qty

Yes

Start
2

Check for
availability of gold
seal no & brand
name in WO

3
Yes

Check for
availability of
pattern & gold seal
sample

No

6
Marker preparation as per ratio

No

Calculate the consumption

Print marker from plotter

Make changes

No

Marker
verification
Yes

Brand

Check with brand

Sampling
Dept

Check with sampling


dept

11

Stripe & checks markers sent


to manual cutting

End

Cutting

10

Issue to cutting

11 Solid & pin stripe markers sent


to Gerber cutting

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

29

Process Map : CAD (Sample Pattern Development)

Start

1
Receipt of specification sheet from brand
to make proto (development) sample

CAD

Development of pattern in PDS as per


specification

Print pattern using plotter

Make hard Pattern

End

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

30

L1 Processes in Cutting
L1 processes
1. FCL Cutting Process
1. Cutting(Plain fabric)
Cutting

2. Cutting(Stripes & checks fabric)

Rashmi Rao, Projects, Madura Clothing

31

Process Map : Cutting (Plain Fabrics)


CAD marker

CAD
Lay Plan

Start

Manufacturing
(Cutting)

5
1 Receipt of CAD marker
& lay plan

Receipt of fabric &


2
trims

Spreading

Lay
4
inspectio
n

Cutting(Auto cuttingGerber cutting)

9 Ready cutting

8 Relay of front
panel

6
Confirmation of cut qty in
SAP

Panel
10
Inspectio
n

11
Bundling

12Issue to

sewing

No

Numbering
8

No

Recut

Fusing

End

Relay

Inspectio
n

Yes

No

Recut

Manufacturing
(Fabric/Trims
Stores)

External
process

Cutting order

Fabric & accessories

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

32

Process Map : Cutting (Stripes & Checks Fabrics)


CAD marker

CAD
Lay Plan

Relay

Start
1 Receipt of CAD marker
& lay plan

Manufacturing
(Cutting)

Lay
7
inspectio
n

2 Receipt of fabric &


accessories

No

Straight Knife Cutting

13 Ready cutting

Yes

9
Band Knife Cutting(For
small parts)

12 Relay of front
panel
Panel
14
Inspectio
n

Spreading

Verification of
centre line in marker
4 Pin setting based

Yes

5
Verificatio
n

on repeat size

10
Confirmation of cut qty in
SAP

11

15
Bundling

16Issue to

sewing

No

12

13

Recut

Fusing

Numbering

No

Yes

Inspectio
n

Yes

End

No

Recut

Manufacturing
(Fabric/Trims
Stores)

External
process

Cutting order

Fabric & accessories

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

33

L1 Processes in Sewing
L1 processes
1. FCL Sewing Process

Sewing

Rashmi Rao, Projects, Madura Clothing

34

Process Map : Sewing(Shirts)


Production plan &
line plan

PPC
IE

Line plan

Manufacturing
(Fabric/Trims
Stores)

Trims

Manufacturing
(Cutting)

Cut panels

Manufacturing
(Sewing)

4
1 Receive
production plan

5
Load small parts

Trims receipt

8 Trimming

Start
Collar ready
2

Receive line plan

Sleeve ready

Cuff make

Back
9

Receive cut parts


7

Assembly

EOL
inspection

Yes

No

Alteration /
Rework

10
Issue to finishing

Manufacturing
(Finishing)

External
process

Front ready

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

End

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

35

L1 Processes in Finishing
L1 processes
1. FCL Finishing Process

Finishing

Rashmi Rao, Projects, Madura Clothing

36

Process Map : Finishing

10 Shirt folding with tissue paper, and

Extra thread trimming

Start

back support (card board), metal &


plastic clip

2 Loose thread removed in

Manufacturing
(Finishing)

thread sucking machine

Packing inside poly


bag

Insertion of collar traveller

Pressing the inner side bottom,


front placket, side & pocket

tag, bar code sticker on swing tag &


product box

12

Pre iron

Buttoning the shirt

11
Placement of price sticker, collar size

Attach price tag, collection tag,


collar support and butter fly

13

Issue to warehouse

End

Yes

Final
6 Inspection

Outside full pressing

No

Rework

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

37

L1 Processes in Warehouse
L1 processes
1. FCL Warehouse Process

Warehouse

Rashmi Rao, Projects, Madura Clothing

38

Process Map : Warehouse


Stores

Packing trims

Finishing
Section

Garments

1 Receipt of finished
products

Start

Factory
Warehouse

Verification of
2 barcode &
size sticker

Yes

Size wise packing in outer


carton box as per location

Location wise
scanning

No

Repack

15

Yes

3 Size wise packing in inner


carton box

No

Replace barcode & size


sticker

6
Sealing of carton box

11 Create carton
stickers in YPDMR34

12
Do PGI in VL02N

7 GRN to be done in
SAP

10 Picking & packing


in VL02N

13 Print delivery
Chelan in YSOLR41

9 Delivery created in
VL04

14

8 STO to be created
in ME27

Central
warehouse

External
process

15

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Loading

Check
WO
status
Yes

16 TECO Final
confirmation & analyse
variance

End

Dispatch

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

39

L1 Processes in IE
L1 processes
1. FCL IE Process

IE

Rashmi Rao, Projects, Madura Clothing

40

Process Map : IE SHIRTS


Merchandising
Gold seal

Industrial
Engineering(IE)
(Factory)
1

Start

Receipt of gold seal

Conduct method
study

5
Man/M/c allocation
Prepare OBD

Fixing CM, creating activity type /rate


3
and SAP updation

4 Plan for resources


based on targets and
styling

Design workplace
layout

8 Prepare final OBD &


freeze SMV

9 Analyze daily
production report

Coordinate with
supervisors & create
awareness of their
operators performance

12

11

Time study for bottle


necks

10

Calculate factory
efficiency on daily basis

13 Coordinate with operators &


encourage to practice effective
methods

14 Initiate continual
improvement activities

15
Prepare factory efficiency
& other MIS

End

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

41

L1 Processes in Maintenance
L1 processes
1. FCL Maintenance Process
1. Preventive maintenance
Maintenance

2. Breakdown maintenance
3. Critical spares

Rashmi Rao, Projects, Madura Clothing

42

Process Map : Preventive maintenance


Start

Identify each equipment and machine


used for production/ service provision with
an inventory number

Prepare a master list

Maintenance
Dept

Prepare yearly plan for


preventive maintenance

Prepare a maintenance
checklist

5Carry out maintenance as per


plan

6 Maintain records of preventive


maintenance

End

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

43

Process Map : Breakdown maintenance


Start

1
Receipt of information regarding breakdown
of equipment/machinery from concerned
department

Rectify the breakdown

3 Register all break downs, malfunctioning,


trouble shooting for each equipment in
History card

Maintenance
Dept

Identify reasons for breakdown of


equipment and initiate corrective action

5 Carry out maintenance as per plan at


periodic intervals

6
Statistically analyze the causes for
break down of critical machines and use the
data for continual improvement

End

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

44

Process Map : Critical Spares

Start

Identify and list out critical spares for


critical equipments

Entry of material into stock ledger

End

2 Fix minimum quantity for each of the


critical spares based on consumption and
lead time of supply

Receipt of material

Maintenance
Dept

Yes

External
process

Store Material in the Allocated Area,


Provide Identification And Maintain
Traceability Records.

Requirement is sent to purchase through


materials requisition

Purchase arranges for material

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Incoming
inspection

Receipt of material

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

45

L1 Processes in Vapourphase
L1 processes
1. FCL Vapourphase Process

Vapourphase

Rashmi Rao, Projects, Madura Clothing

46

Process Map : Vapour Phase

5 Load the trolleys in the chamber &


run the programme

Check the
processed
shirts

No

Second quality

Receipt of pressed
shirts from finishing

Set the programme number


7

Start
Check for
stains, damage
2
& unwanted
creases

Damage

Second quality

3 Place the shirts on VP production


trolleys (80 to 100 Pcs each with 2
2.5 gap. If the qty is less use dummy
shirts)

Yes

Stains

No

Yes

Yes

Spot
wash

Send to finishing

End

Creases

Spot wash

To pressing

Yes

Yes

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

47

L1 Processes(CCPL)
L1 processes
1. Stores
2. IE
3. Lab
4. Factory Planning
CCPL

5. CAD
6. Cutting
7. Sewing
8. Finishing
9. Warehouse
10. Maintenance
11. Vapour Phase

Rashmi Rao, Projects, Madura Clothing

48

L1 Processes in Stores
L1 processes
1. CCPL Stores Process
1. Fabric Store
Stores

2. Trims Store
3. Regular Purchase
4. Indent Purchase

Rashmi Rao, Projects, Madura Clothing

49

Process Map : Fabric Stores


Fabric
Suppliers

Fabric Production and Supply


Bulk Fabric

Start

6 Visual & Shade

Lab testing

Fabric
Return

batching

Receipt of fabric
9 Fabric Return

Manufacturing
(Fabric Store)
2

Document
verification
No

Inform/Mail to
brand

Dispatch

Visual, Lab & Shade


batching Report
Yes

7 Quality
Approved?

Fabric
shortage

GIR

Fabric Discrepancy
Report (FDR)

11

Material issue to
CAD & Cutting
End

No
Yes

Fabric Rejection Advice


(FRA) + sample

Swatch for
design approval

GRN in
system

No

Bale opening

10

Yes

Design
approval

Accept?

Garments Production
In-house Factories (4b.3)

Approvals/
Advice

PO and Order Management - Fabric (4a.4)


Sourcing

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

50

Process Map : Trims Stores


Fabric
Suppliers

Trims Production and Supply


Trims

Start

Trims
Return

Visual & lab testing


1

Receipt of trims

Manufacturing
(Trims Store)

7 Trims Return

Dispatch
2

Document
verification
No

Visual & Lab Report


Yes

5 Quality
Approved?

GIR

Yes

GRN in
system

Material issue to
cutting, sewing &
finishing dept

No

End

Inform/Mail to
brand

No
Yes

Trims Rejection Advice


(TRA) + sample

Master sample
approval for first time
material receipt

Sample
approval

Accept?

Garments Production
In-house Factories (4b.3)

Approvals/
Advice

PO and Order Management - Fabric (4a.4)


Sourcing

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

51

Process Map : Regular Purchase


Suppliers

Supply

Material

Material
return

Material Return
Dispatch

Start

5
1 Receipt of material

indent

PO Raise

Visual checking
6

Manufacturing
(Store)

RN(Receipt
Note) in system

Report

Quality
Approved

Yes

End

Material issue

Garments Production
In-house Factories (4b.3)

No

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

52

Process Map : Indent Purchase


Suppliers

Supply
Material

Material
return

Visual Checking

Start
PO Raise

1 Receipt of material

Report

Material Return
Dispatch

indent
Manufacturing
(Store)

Supplier
2
approved?

Collect quotations
-

Yes

Quality
4
Approved?

Yes

RN(Receipt
Note) in system

End

Material issue

No

No

Meeting with
suppliers
Comparative
analysis

Garments Production
In-house Factories (4b.3)

Approval
from FM

Management

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

53

L1 Processes in IE
L1 processes
1. CCPL IE Process
1. IE(Trousers)
IE

2. IE(Jackets)

Rashmi Rao, Projects, Madura Clothing

54

Process Map : IE (Trousers)

Gold seal

Merchandising

Start

1
Receipt of gold seal

Industrial
Engineering(IE)
22

Factory

No

External
process

7
Man/M/c allocation

Prepare OBD

6
Costing mail to be
send for brand

Costing

FM
approval

8
Conduct method
study

Yes

L2 processes
within L1 process

Design workplace
layout

Prepare final OBD &


freeze SMV
10

11 Analyze daily
production report

5
Updation activity code in
SAP

Inter-linked L1
processes

Coordinate with
supervisors & create
awareness of their
operators performance

14

13

Time study for bottle


necks

12

Calculate factory
efficiency on daily basis

Coordinate with operators


& encourage to practice
effective methods
15

16 Initiate continual
improvement activities

17
Prepare factory efficiency
& other MIS

End

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

55

Process Map : IE (Jacket)

Gold seal

Merchandising

Start

1
Receipt of gold seal

Industrial
Engineering(IE)
2
2

Factory

No

External
process

7
Man/M/c allocation

Prepare OBD

6
Costing mail to be
send for brand

Costing

FM
approval

8
Conduct method
study

Yes

L2 processes
within L1 process

9
Design workplace
layout

14

Prepare final OBD


10 & freeze SMV

13

11 Analyze daily
production report

5
Updation activity
code in SAP

Inter-linked L1
processes

Coordinate with
supervisors & create
awareness of their
operators performance

Time study for bottle


necks

12

Calculate factory
efficiency on daily basis

Coordinate with operators


& encourage to practice
effective methods
15

16 Initiate continual
improvement activities

17
Prepare factory efficiency
& other MIS

End

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

56

L1 Processes in Lab
L1 processes
1. CCPL Lab Process

Lab

Rashmi Rao, Projects, Madura Clothing

57

Process Map : Lab


Fabric , trims, garments

Sourcing /
PDQA

No

8 Approved?
Yes

Fabric ,trims, garments

Manufacturing
(Store)

Start

Receipt of sample

9
Send back test report signed copy to
Lab, photocopy forwarded to store

4
Carry out Test as per standard test
method (AATCC, ASTM, ISO)

Lab
2

Enter detail in register

Prepare hand written draft report/


Enter test details in register

3
Decide type of Test Package, cut &
distribute to concerned technician

6 Result
Approved?

Send test report along with tested


specimen to QA Manager-RM for final
approval

10
Keep all test reports in Box File in
sequence/ Keep record in register

No

11
Discard tested & untested sample as
per Lab sample retention policy

Yes

Bulk - Enter result in SAP & accept.


Other cases: Send PDF report to
concerned Person

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

End

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

58

L1 Processes in Factory Planning


L1 processes
1. CCPL Factory Planning Process

Factory Planning

Rashmi Rao, Projects, Madura Clothing

59

Process Map : Factory Planning


BCDS

Brand

PPC(Factory)

1
Receipt of BCDS

Start

2 Daily update WOs


created

Release plan

Give Brand Commitment


fortnightly
4

Weekly Dispatch plan

WO release

7 Follow up WOs in

different sections

WO dispatch

OTIF, Through Put &


other reports
End

CAD

Consumption

Check for trims availability

Stores
Communicate for work place
design

IE
Production

External
process

Gold seal review

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

60

L1 Processes in CAD
L1 processes
1. CCPL CAD Process
1. Sample development
CAD

2. Production Marker development

Rashmi Rao, Projects, Madura Clothing

61

Process Map : CAD (Sample Development)


Sample indent &
control sheet

Merchandising
Dept

1
Receipt of sample indent &
control sheet

CAD
Start

Pattern making

Digitizing / Manual marker


7
Develop size set sample
Sample development

9 Sample ready for


production

End

6 Grading / Final model


development

No
No

Brand sourcing

8 Approval

Approved
5 sample

Yes

Yes

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

62

Process Map : CAD (Production Marker Development)


6

Marker preparation

Avg consumption

CAD
Yes

No

5
Receipt of control sheet

Approved gold
2 seal, measurement
chart & pattern
availability

Stores

WO detail with lay


1 1
plan

WO detail received with


consumption
4

Start

Yes

7 Marker
verification

Prepare control sheet

Cutting

8 Issue to cutting

End

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

63

L1 Processes in Cutting
L1 processes
1. CCPL Cutting Process

Cutting

Rashmi Rao, Projects, Madura Clothing

64

Process Map : Cutting


Marker making

CAD

Start

1 Prepare lay plan &


accessory sheet
Check fusing
bond
strength /
thermal
shrinkage

Manufacturing
(Cutting)

Receipt of fabric & trims

Control
sheet
review?

No

Table planning &


spreading

External
process

Fabric & accessories

L2 processes
within L1 process

BUNDLE
15 INSPECTI
ON

Yes

13

Check for
fab code &
width
before
spreading

Yes

Inter-linked L1
processes

Lay
7
inspectio
n?
No

Relay

No

Recut

No

16 Issue to

Yes

sewing
Yes

10 Sorting
11

Numbering

Panel
12
Inspectio
n

End

No

Recut

Issue fab
requisition slip

Return to stores

Input
Interfaces

Yes

Fusing

Recut

Yes

No

Control sheet

Cutting
Cut
9 panel
Inspecti
on

Yes

No

Manufacturing
(Fabric/Trims
Stores)

Change fusing
parameters

14
Bundling

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

65

L1 Processes in Sewing
L1 processes
1. CCPL Sewing Process

Sewing

Rashmi Rao, Projects, Madura Clothing

66

Process Map : Sewing(Trousers)


Production plan

PPC
IE

Line plan

Manufacturing
(Fabric/Trims
Stores)

Trims

Manufacturing
(Cutting)

Cut parts

Manufacturing
(Sewing)
1 Receive
production plan

Trims receipt

5
Load small parts

8
Sewing assembly

Start
10
2
Receive line plan

3
Receive cut parts

Parts sewing

7 Panels & parts


sewing

Trimming

EOL
inspection
Yes

No

Alteration / Rework

11
Issue to finishing

End

Manufacturing
(Finishing)

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

67

L1 Processes in Finishing
L1 processes
1. CCPL Finishing Process

Finishing

Rashmi Rao, Projects, Madura Clothing

68

Process Map : Finishing(Trousers)

Garments

Manufacturing
(Sewing)

Start

Receive material
2

Loose thread sucking

Manufacturing
(Finishing)

Side seam iron


4

Legger pressing
5

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Topper pressing

Issue to FQC

End

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

69

L1 Processes in Warehouse
L1 processes
1. CCPL Warehouse Process

Warehouse

Rashmi Rao, Projects, Madura Clothing

70

Process Map : Dispatch (TROUSERS)


Stores

Packing trims

Garments

Finishing
Section

Start

Re audit

1
Receipt of garments

Factory
Warehouse
2

Final quality
audit if qty >
80%

Yes

Tagging of price tag


3 with barcode

9 Receive details of
confirmed orders which
are dispatched

Packing

Appearance
audit

Yes

Generate DC
10
Check for cost variance
in SAP & TECO

No

Rescreen

No

Audit by
6 buyer QC

Yes

End

No

Rescreen

Rescreen

8
Dispatch to WH

Central
warehouse

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

71

L1 Processes in Quality
L1 processes
1. CCPL Quality Process

Quality

Rashmi Rao, Projects, Madura Clothing

72

Process Map : Quality(Trousers)


CAD

Check
marker

Cutting

Check
laying

Yes

Check
cutting

No

Re - laying

Yes

No

Re - cutting

Sewing

Check
operators
for quality

Yes

Issue green flag Yes

No

Yes

Check
fusing

Check
panels

No

Check
bundling

No

Change fusing
parameters

Check
critical
operations

Yes

Re - cut

End of sections
check for
quality output

Yes

No
Yes

Issue red flag

Alterations

No

Check
operators
for quality

No

100%
inspection

Yes

Check as per
traffic light
system

Issue white flag

Choose single
Yes
sampling plan as
per order size

Final
Audit

Yes

Final Audit for


presentation

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

No

FQA

Alterations

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

73

L1 Processes in Sewing
L1 processes
1. CCPL Sewing Process

Sewing

Rashmi Rao, Projects, Madura Clothing

74

Process Map : Sewing(Jackets)


Section wise
planning

PPC

Receive style details


and loading plan

IE

Manufacturing
(Fabric/Trims
Stores)

Control sheet

Trim kit

Manufacturing
(Cutting)

Manufacturing
(Sewing)

Cut parts

1
Receive plan

2
Receive material

Alteration /
Rework

Processing
(Sleeve,)

No

Start

Bundle wise
loading

4
Processing (Lining)

Body
assembly

Sleeve
assembly

7 Inspection
Yes

4
Processing (Body)

Manufacturing
(Finishing)

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

End
Issue to
Finishing

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

75

L1 Processes in Finishing
L1 processes
1. CCPL Finishing Process

Finishing

Rashmi Rao, Projects, Madura Clothing

76

Process Map : Finishing(Jackets)

Manufacturing
(Sewing)

Garments

Start

Spot remover

3 Shoulder & sleeve


press

Manufacturing
(Finishing)
4

External
process

Receive material

Left & right front press

L2 processes
within L1 process

7 Button sewing
(Front button)

8 Button sewing
(Lining button)

13 Lapel pressing &


touch up

Label attaching on
sleeve
14

Collar press

12 Lining ironing &


fabric touch up

15

10
Armhole touch up

11
Sleeve touch up

16

Button marking

5
Side & back press

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Wrapping

Issue to FQC

End

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

77

L1 Processes in Warehouse
L1 processes
1. CCPL Warehouse Process

Warehouse

Rashmi Rao, Projects, Madura Clothing

78

Process Map : Dispatch (JACKETS)


Stores

Packing trims

Garments

Finishing
Section

11 Receive details of

Start

Re audit

1
Receipt of garments

Factory
Warehouse
2

Final quality
audit if qty >
80%

Yes

No

3 Put size ring for


jacket/trouser with
hanger

confirmed orders which


are dispatched

Packing

Appearance
audit

Yes

No

4 Paring of jacket &


trouser

Audit by
8 buyer QC

Rescreen

12
Check for cost variance
in SAP & TECO

Yes

End

No

Rescreen
Tagging of price tag
5 with barcode

Rescreen

10
Dispatch to WH

Central
warehouse

External
process

9 Generate DC

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

79

L1 Processes in Quality
L1 processes
1. CCPL Quality Process

Quality

Rashmi Rao, Projects, Madura Clothing

80

Process Map : Quality(Jackets)


CAD

Check
marker

Cutting

Check
laying

Yes

Check
cutting

No

Re - laying

Yes

No

Re - cutting

Sewing

Check
operators
for quality

Yes

Issue green flag Yes

No

Yes

Check
fusing

Check
panels

No

Check
bundling

No

Change fusing
parameters

Check
critical
operations

Yes

Re - cut

End of sections
check for
quality output

Yes

No

Issue red flag

Alterations

No

Check
operators
for quality

No

100%
inspection

Yes

Issue white flag

Choose single
Yes
sampling plan as
per order size

Final
Audit

Yes

Final Audit for


presentation

Output
Interfaces

Decision
Stored Data
Event
T -Rashmi
Template
Rao, Projects, Madura Clothing

No

FQA

Alterations

External
process

L2 processes
within L1 process

Inter-linked L1
processes

Input
Interfaces

81

END OF DOCUMENT

82
Rashmi Rao, Projects, Madura Clothing

82

Вам также может понравиться