STEP 1
Develop/update
RCM Program Plan
STEP
STEP2A
2
STEP
STEP2B
2
STEP 7
STEP 9
Current
Equipment Design
New
Equipment Design
Recommended
Perform
Functional Significance Determination for each function
STEP 3
Yes
STEP 10
SSWG
Yes
Select
Severity Class for the
failure mode
Yes
STEP 11
STEP 13
Yes
Complete
FMECA.
Calculate or estimate
failure distribution
curve
No
Complete
End Item & Level 1
Breakdown
STEP 4
Identify
all failure modes and
their failure effects
(Local, Next Higher &
End Effects)
No
Complete
Level 2 Breakdown
STEP 5
SIGNIFICANT FUNCTION
Select a failure mode for
RCM Analysis and
perform
STEPS 11 thru 23
Complete
Levels 3 and 4
Breakdowns
STEP 6
Identify
all functions
STEP 14
STEP 8
STEP 12
Identify
all functional failures
and Compensating
Provisions
RELIABILITY ANALYSIS
IMPLEMENTATION TASKS
OPERATIONS
OTHER EVENTS
FMECA TASKS
FEEDBACK TASKS
2-7
2 8 (Blank)
Answer
failure consequences questions.
(MODULE 10)
Is
Is the
the functional
functional failure
failure or
or effect
effect of
of the
the failure
failure mode,
mode, on
on its
its own,
own, evident
evident to
to the
the operator
operator while
while performing
performing normal
normal duties?
duties?
YES
NO
EVIDENT
EVIDENT
Does
Does the
the failure
failure mode
mode cause
cause aa function
function loss
loss or
or secondary
secondary damage
damage that
that
could
could have
have an
an adverse
adverse effect
effect on
on operating
operating safety
safety or
or lead
lead to
to serious
serious
environmental
environmental violation?
violation?
HIDDEN
HIDDEN
Does
Does the
the occurrence
occurrence of
of the
the hidden
hidden failure
failure mode
mode in
in combination
combination with
with aa second
second
failure
failure // event
event cause
cause aa function
function loss
loss or
or secondary
secondary damage
damage that
that could
could have
have an
an
adverse
adverse effect
effect on
on operating
operating or
or lead
lead to
to serious
serious environmental
environmental violation
violation safety?
safety?
NO
YES
Evident
Safety / Environment
STEP 15
NO
Evident
Economic / Operational
YES
YES
Hidden
Economic / Operational
Hidden
Safety / Environment
NO
STEP 18A
STEP 18A
Develop
PHM task
STEP 18B
Develop
Servicing / Lubrication PM task
STEP 16
Develop
PHM task
STEP 18B
Develop
Servicing / Lubrication PM task
STEP 18C
STEP 17
STEP 18C
Determine
Number of OC or PHM
tasks required during PF
interval to meet Pacc
Develop
On-Condition PM task
Determine or estimate
PF condition, PF-FF
interval or wear out/life
limit age
Develop
On-Condition PM task
STEP 18D
STEP 18D
Determine
PM intervals for all tasks
Develop
Hard Time PM task
Develop
Hard Time PM task
Determine
Single task total manhours and cost
STEP 18E
STEP 18E
Develop
Other Action
Develop
Other Action
STEP 18F
Develop
Failure Finding PM task
2-7
2 8 (Blank)
STEP 19
STEP 19
STEP 19
STEP 19
Determine costs
associated with each
STEP 18A thru 18E item
Determine costs
associated with each
STEP 18A thru 18E item
+
No action taken costs
Determine costs
associated with each
STEP 18A thru 18F item
+
No action taken costs
Determine costs
associated with each
STEP 18A thru 18F item
STEP 20
STEP 20
STEP 20
STEP 20
Analysis / Select
which option or combination of
options is best at meeting RCM
metrics
PM Task/s
required
Redesigned
required
Analysis/ Select
which option or combination of
options is best at meeting RCM
metrics
Redesigned
required
Analysis/ Select
which option or combination of
options is best at meeting RCM
metrics
No action
required
PM Task/s
required
STEP 23
Repeat
STEPS 11 thru 23 until all
FM(s) have been analyzed
Analysis/ Select
which option or combination of
options is best at meeting RCM
metrics
PM Task/s
required
Design Testing
In-service
STEP 24
STEP 24
Redesigned
required
Recommended PM
acceptable?
STEP 21
GO TO
STEP 2B
YES
GO TO
STEP 2B
Provide
usage prediction data (STEP 13) to logistics to
ensure adequate replacement parts are available
STEP 25
Perform
Packaging Process
STEP 22
Was engineering judgment / estimated values
used during any part of the RCM analysis?
*-
YES
PMA / APML
Develop
Age Exploration task
STEP 26
Perform LORA and update
maintenance plan
NO
Direct PM task to be implemented
regardless of RCM results
NO
Go to
STEP 2B
STEP 28
Collect
test and in-service data
STEP 29
Does new data support
current FMECA and RCM
entries?
YES
Go to
STEP 28
NO
Go to
STEP 6