Events
TD BFP A tripping on 27/06/2013(15.48)
TD BFP A tripping on 27/06/2013(18.24)
MD BFP C discharge v/v closed on
24/07/2013(15.15)
Approach, Learning's!
Unit Tripping- What it means ?
Queries?

Events
TD BFP A tripping on 27/06/2013(15.48)
TD BFP A tripping on 27/06/2013(18.24)
MD BFP C discharge v/v closed on
24/07/2013(15.15)

Team
1.
2.
3.
4.
5.
6.
7.
8.

Shift In charge- Sh. T N Yadav


Unit Controller- Sh. Rakesh Anand.
Er. Naveen Kumar
Er. Anoop Kr. Sharma
Er. Saroj Kr. Yadava
Er. Sandeep Kr. Malik
Rahul Kumar(DT)
Jatinder Singh(DT)

TD BFP A tripping on 27/06/2013(15.48)

Unit Condition before tripping (15:47)


1.
2.
3.
4.
5.

7 Mills in Service A,B,C,D,G,H,J


Unit Load 502 MW
Throttle Pressure 168.7
Coal flow 310 T
Drum level -10

TD BFP A tripping on
27/06/2013(15.48)

At 15. 48 TD BFP A tripped, Alarm came


in BHEL ,no sound was there.

TD BFP A tripping on
27/06/2013(15.48)
Reason
1. De aerator level transmitter root v/v left
side was isolated by TMD worker.
2. Resulting in D/A lvl V. low tripping in TD BFP.

Scheme
Root
v/v

Root
v/v

DE AERATOR

D/A lvl V. Low tripping 2


out of 3
1,2,3 - TD BFP A,B
2,3,4- MD BFP C
1

2
Level Gauge

TD BFP A tripping on
27/06/2013(15.48)
Actions
1. In Boiler side Feeder J was cut at 15.49.20,
Mill G at 15.49.50was cut immediately.
2. Load was decreased immediately to 350
MW by
Pr max. final limiter.
3. Subsequently feeder H was cut and Mill H,J
were cut.
4. MD BFP was in auto.

Pr. Max

Actual
Load

Feeder J cut
Mill G Cut

Mill J Cut
Mill H Cut

Load
Drum
Level
Coal Flow

Roadblocks & Handling


MD BFP C scoop struck at 73, was taken in
manual and flow raised to 1000 T.
Drum level was maintained within trip limits.

Function

Minimum

Maximum

Load

270 @15.59

499 @15.47

Drum Level

-328 @15.50

129 @16.02

Coal

151 @ 15.51

310 @15.47

TD BFP A tripping on 27/06/2013(18.24)

Unit Condition before tripping (18:23)


1.
2.
3.
4.
5.

7 Mills in Service A,B,C,D,E,H,J


Unit Load 505 MW
Throttle Pressure 170.7
Coal flow 318 T
Drum level +15

TD BFP A tripping on
27/06/2013(18.24)

At 18. 24 TD BFP A tripped, Alarm came


in BHEL.

TD BFP A tripping on
27/06/2013(18.24)
Reason
1. TD RJ Bearing Vibration shoot up to 149 for
5s
2. Resulting in TD BFP A tripping at RJB
vibration V high.
Alarm value at 50 mm/sec
Trip value at 70 mm/sec for 5 sec.
Now changed to 30 sec.

TD BFP A tripping on
27/06/2013(18.24)
Actions
1. In Boiler side Mill J was cut at 18.26, Mill H
at 15.26.50 was also cut immediately.
2. Load was decreased immediately to 350
MW by
Pr max. final limiter.
3. Subsequently Mill E was cut.
4. MD BFP was in Auto.

Pr. Max
Actual
Load

Mill H,J Cut


Mill E Cut

Throttle Pr.

Load
Drum
Level
Coal Flow

Roadblocks & Handling


MD BFP C was taken in manual to manage
drum level.
Drum level was maintained within trip limits.
Pr Max. was reduced to 300 MW resulting in
increase in Throttle Pressure by 178 so By
pass opened , load should be taken, feeding
in top
mill should
be decreased.
Function
Minimum
Maximum
Load

251 @18.26

492 @18.24

Drum Level

-326 @18.26

191 @18.34

Coal

152 @ 18.24

318 @18.31

MD BFP C Discharge v/v closed on


24/07/2013(15.15)
Unit Condition before tripping (15:14)
1.
2.
3.
4.
5.

7 Mills in Service A,B,C,D,F,G,H


Unit Load 498 MW
Throttle Pressure 171.2
Coal flow 312 T
Drum level -5

MD BFP C Discharge v/v closed on


24/07/2013(15.15)
Observations
1. Drum level started decreasing as MDBFP
recirculation opened.
2. We tried to close re circulation, but it was
not getting closed.
550-600 T flow was shown in screen so
scoop was increased.
3. Mean while it was seen that discharge
pressure was 0 kg and discharge valve was
in closed condition.

MD BFP C Discharge v/v closed on


24/07/2013(15.15)
Actions:
1. Immediately scoop was reduced to 0 and
in some time discharge valve was opened
from local.
2. Mill F,G,H were cut.
3. Load was reduced by Pr. Max to 350 MW.

Actual
Load
Throttle Pr.

Mill F,G,H
Cut

Load
Drum
Level
Coal Flow

Roadblocks & Handling


TD BFP A came in manual ,ACV opened ,
speed reduction took time.
High reduction in coal flow so load reduced
to 220 hence drum level shoot up , 1st
roadblock added to it.
1 person was sent in local to open discharge
v/v and then scoop was increased along with
Function
Minimum
Maximum
feeding
Load

219 @15.33

498 @15.16

Drum Level

-354 @15.22

349 @15.27

Coal

145 @ 15.25

311 @15.19

Approach, learning's !
Cut 2 Mills
Immediate
ly

After some
time delay
(30s) cut
3rd Mill

Decrease
Load to
350 by Pr.
Max

SAVING UNIT, HANDLING EMERGENCY


In MD
Tripping
Manage TD
with large
commands
for good
response

If by pass
opens take
load,
decrease
feeding in
top mill

Further
reduction to
300 MW
watching
throttle Pr.

Unit Tripping-What it Means?


500 MW for 1 hr.
500*1000=0.5 *10^6
0.5MU lost in 1 hour.
Taking 1 unit cost Rs. 1 (NTPCs avg. 2.50)
0.5 million rupee.
For 4 hours 2 million rupees
Adding cost due to loss of schedule and oil etc.
Approx. 25 lac