Work In Process
Oracle Work in Process is a complete production management system. Work in Process supports
discrete, project, repetitive, assemble-to-order, work order-less, lot based jobs,or a combination of
manufacturing methods.
Inquiries and reports give you a complete picture of transactions, materials, resources, costs, and job and
schedule progress.
Agenda
Bulk
Miscellaneous
issue
Supplier
(outside
processing)
Work
WorkininProcess
Process
Push
issue
Raw material
subinventory
Supplier
warehouse
Complete
Operation pull
backflush
Replenish
Floor stock
inventory
Assembly pull
backflush
Finished goods
subinventory
Agenda
Discrete Job
Click to View
components
Reports from
Discrete job
Agenda
Agenda
WIP Transactions
Inventory
Work in Process
Issue material
Jobs and
schedules
Raw material
inventory
Complete
finished
assemblies
Finished goods
subinventory
Move assemblies on
the shop floor and
charge resources
Scrap rejected
assemblies
WIP Transactions
WIP Transactions Include:
WIP(Component
Issue)
WIP(Component
Issue)
WIP(Component
Issue)
Enter lot /
serial info
WIP(Component Issue-Lot)
WIP(Move Transaction)
Intra
Operation
Move
Agenda
Queue
Run
To Move
Reject
Scrap
WIP(Resource Transaction)
WIP(
Completion Transaction
Quantity available to
complete
WIP(
Completion
Subinventory
Completion Transaction
Agenda
WIP(Job closing)
Status Complete
WIP(Job closing)
Click to View
Value summary
Click to view
Distribution of
Costs
Agenda
Define
Resources
Create
Discrete
Jobs
Create
Routing
Perform
Move
Transaction
Requisitions
Auto Created
Define
Departments
Create BOM
Approve
Req and Auto
Create PO
Attach
Resource to
Department
Enter
Appropriate
Cost info
Receive
Material
Click to Enter
Resource
information
Resource
Information
Routing Information
Outside
Processing
Outside Processing
Requisition
Information
Auto Create
Outside processing PO
Agenda
Oracle Master Scheduling/MRP and Supply Chain Planning does not create planned orders or
reschedule recommendations for nonstandard jobs.
Oracle Capacity considers resource load for nonstandard jobs.
Oracle Master Scheduling/MRP and Supply Chain Planning does not deduct scrapped assemblies
from the MRP net quantity, or deduct the MRP net quantity by the item shrinkage rate for non
standard jobs.
Work in Process does not implement engineering change orders(ECOs) on nonstandard jobs
Agenda
Back Flushing
A Material Transaction that automatically issues component items into work in process from inventory
when a move or completion transaction is performed.
When performing move and completion transactions that complete assembles at an operation or
complete assemblies into inventory, the system automatically backflushes pull components not under
lot, serial number, or lot and serial control from their respective supply subinventories.
Reversing these transactions returns backflushed components back to their subinventories.
Raw material
subinventory
Bulk
Supplier
(outside
processing)
Work
Workin
inProcess
Process
Supplier
warehouse
Complete
Replenish
Assembly pull
backflush
Floor stock
inventory
Finished goods
subinventory
Operation 10
Move from
10Queue to
30To Move
Operation 20
Operation 30
Setup
Lot
WIP Move
Machine
Item
WIP Move
Machine
Item
WIP Move
Machine
Item
Manual
Worker
Item
Manual
Worker
Item
Manual
Worker
Item
Manual
Machine
Item
WIP Move
Agenda
Purge discrete job information using the Purge Discrete Jobs window and Purge Discrete Jobs (SRS).
Selectively purge some or all of the following job related information: job details (material requirements,
resource requirements, and operations), ATO configurations, move transactions, and resource cost
transactions.
Selective purging allows to retain pertinent historical information. Eg. you can retain operation
information but purge move transactions associated with these operations.