labor,
ensures
economic
and
balanced
Operations:-
Performance
in
accordance
with
targets
so
that
performance
can
be
Meaning:-
Production Planning
to
produce
the
desired
goods
at
the
Production Control
Meaning:Production control guides and directs flow of
production so that products are manufactured in a
best way and conform to a planned schedule and are
of the right quality.
Definition:"Production control refers to ensuring that all which
occurs is in accordance with the rules established and
instructions issued.
-Henry Fayol
planning
and
control
is
the
co-
Objectives of PPC
To ensure that various inputs like men, machine, materials
policies.
To introduce a proper system of quality control. Follow
finished products.
Objectives of PPC
To deliver goods in required quantities to customers
supporting departments
Need/Importance of PPC
For Increasing Production
For Co-coordinating Plant Activity
For Cost Control
Consumer Satisfaction
Functions of PPC
Routing
Scheduling
Dispatching
Expediting
Evaluating
Inventory Control
Routing
It is determining the exact path or routing which will be
Scheduling
Scheduling is the determining of time and date when each
Types of Schedules
Master scheduling
Operation scheduling
Detail operation scheduling
Dispatching
The term dispatching refers to the process of actually
Procedure
Assigning of work to machines.
Issuing of tools to production departments.
Issuing of job orders.
Recording of time taken.
Ensuring necessary changes.
Having proper liaison with routing (feedback).
Expediting
Follow up or expediting is that branch of production
control procedure which regulates the progress of
materials and part through the production process".
Procedure
Progress should be checked
Causes of differences should be ascertained
Helping in removing the deviations
Report with departments supplying materials.
Evaluating
Evaluation is also an important function of control. the
purpose of evaluation is to see whether the products
manufactured are of requisite quality or not.
It is carried on at various levels of production process
so that pre-determined standards of quality are
achieved. Evaluation is undertaken both of products
and inputs.
Levels of PPC
Strategic Planning(Long range):It is process of thinking though the organizations current
mission and environment and setting a guide for future
decisions and results e.g. Technology forecasting and
choice of appropriate technology for the long range time
horizon.
Tactical Planning(Intermediate Range):It is done over an intermediate term or medium range
time horizon by middle level management. These plans
focus on aggregate
products rather than individual
products.
Operational Planning(Short Range ):It is done over a short range time span developed by
junior level management. It is concern with utilization of
existing facilities rather than creation of new facilities.
Benefits of PPC
PPC
coordinates all
Operating system.
An
Limitations of PPC
Rigidity
Difficult for small firms
Costly
External factors