Intro
Power Systems in Industrial Facilities
The role of the Power Systems design engineer
Approaching the design process
1.
2.

5.

Developing the load list


1.
2.
3.

6.

Continuous
Intermittent
Stand-By

The Distribution System


1.
2.

7.

Developing/Updating the One-line


Circuit arrangement selection

Equipment Selections
1.
2.
3.
4.
5.
6.

8.

Generators
Transformers
Cables & Cable Support
Switchgear Systems
Electric Motors
Lighting Systems

Performer System Studies


1.
2.

9.
10.
11.
12.

Greenfield
Brownfield

Hand Calculation
Software Tools

Selecting Protective Devices


Grounding Systems
Hazardous Areas
Stand-by Power Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

INTRO
Course Objectives

Content development guideline

Assumptions

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Power Systems in Industrial Facilities

Power Generation
and distribution
systems are a critical
part of many
petrochemical
facilities worldwide

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Power Systems in Industrial Facilities

The primary objective of any industrial plant is to produce


consistently and economically. The ability to produce is
dependent to a large degree on the adequacy
and continuity of the electrical service. In many cases, the
cost of service interruptions can be evaluated directly in
terms of lost production. This cost may exceed the cost of
the physical damage to the electric equipment that caused
the interruption.
Therefore, it is of prime importance that the electrical
system be designed to serve continuously, reliably, and
hopefully unnoticed. Since no two plants have identical
requirements, a standard electrical distribution system is
not universally applicable. Therefore, it is essential to
analyze the specific requirements of each process
system and then design an electrical system which will
most adequately meet these
requirements.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Power Systems in Industrial Facilities

Power Systems are typically designed to provide


reliable and sufficient electric power to an array of
equipment and infrastructure hence the capacity,
arrangement and operation of the power systems is
dictated by the peculiar requirements of each plant
facility

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Power Systems in Industrial Facilities

In its simplest form a power generation & distribution


system would comprise of some form of electric
power generator or incoming utility feeder, distributive
switch-gear, cables & and equipment terminating
panels

Power Cables

Power Cables

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Power Systems in Industrial Facilities

A One-line representation of More Complex Systems


Acrobat Document
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

The role of the Power Systems design engineer

After Due consideration of peculiar project


requirements and constraints the PSE is required to
design a reliable, cost effective and constructible
power generation and distribution systems.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Bio-Slide: Shola Daley


Electrical/Electronics OAU
89
Shell Petroleum Warri E/I Engineer(Field)
90-92
Chevron Oil Escravos Facilities Engineer
92-95
Mobil Producing Qua Iboe Terminal Electrical Eng 95-96
Data Communications & Control SouthBank UK
96
Sandersons Construction Company , UK
97-99
Atlas Oil Company Consultant
2000-01
Amazon Energy Limited
2001-03
Ipgrupp Engineering Technical Director
2003-

44B Ajanaku Str Opebi, Lagos


08023036794

www.IPgruppEngineering.com

018984028

Approaching the design process

Basic Design Considerations

Safety
Reliability
Maintenance
Flexibility
Simplicity of Operation
Voltage Regulation
Cost

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Approaching the design process

One of the earliest tasks for the engineer who is designing a power system is to estimate the
normal operating plant load. He is also interested in knowing how much additional margin
he should include in the final design. There are no hard and fast rules for estimating loads,
and various basic questions need to be answered at the beginning of a project, for
example;

Is the plant a new, green field plant?


How long will the plant exist e.g. 10, 20, 30 years?
Is the plant old and being extended? (Brownfield)
Is the power to be generated on site, or drawn from an external utility, or a combination of
both?
Does the owner have a particular philosophy regarding the sparing of equipment?
Are there any operational or maintenance difficulties to be considered?
Is the power factor important with regard to importing power from an external source?
If a generator suddenly shuts down, will this cause a major interruption to the plant
production?
Are there any problems with high fault levels?

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Load List Summary

Load Summary
A load summary is a detailed listing of all loads to be served by
the electrical distribution system. It is used to determine the
power requirements of a systemin order to properly size power
sources, distribution equipment, and feeder systems. The load
summary also aids in determining system voltages

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Load List

Load Summary
To develop a load summary, data on all loads to be served and
information about the facility processes should be collected first.
Generally, industrial facility loads are a function of the process
equipment. A list of loads must be obtained from the process and
equipment designers. The list should include nameplate ratings of
motors, brake-horsepower of electric motor-driven equipment, and
kVA and kW ratings of all other process equipment.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Load List


Running Load
The actual electrical load of the facility during operation. Running load is
used to size utility service, generators, transformers, feeders, motor
control centers, circuit breakers, and uninterruptible power supplies. To
determine running load, individual loads must be identified as either
continuous, intermittent, or spare. Running load is the sum of all
continuous loads, including planned future continuous loads. Intermittent
loads are included on a percentage basis; spare loads are not included
in running load calculation.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Load List

Continuous load : Defined as a load that is expected to operate


continuously for 3 hours or more.
Intermittent loads: are loads that operate continuously for periods
of less than 3 hours.
Spare loads: are operated only when other loads are not operating.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Load List

Peak load, the maximum instantaneous load drawn by a system during a stated
period of time, is obtained when the facility is operating at full capacity and the
maximum instantaneous intermittent load is energized. All intermittent loads on a
system normally will not be energized at the same time. Therefore, to estimate peak
load the process must be evaluated to determine when the maximum intermittent
load will be energized. Peak load is the sum of the running load and the maximum
instantaneous intermittent load.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Load List


Stand-by loads should be identified on the load summary to enable the electrical
system designer to design the stand-by power system. Typically, stand-by loads
include critical loads that cause damage to the process or product if power is interrupted,
loads required for black start-up of a generator (e.g., jacket water heaters and
pumps), selected plant lighting and HVAC loads, and sewage pumps.
Emergency loads deemed essential for personnel safety (e.g., building egress
lighting) and UPS loads that require clean uninterrupted power (e.g., computers and
certain electronic instrumentation) should also be identified on the load summary.
Typically, emergency loads are powered from unit equipment separate from the
stand-by system because of the more stringent requirements of emergency systems.
Refer to Sections 124 and 1300 for more information on stand-by, emergency, and
UPS power systems.
As the design evolves, load estimates should be updated constantly. It is important
to coordinate with other design disciplines to ensure that up-to-date data are used.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Load List

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Load List

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

The Distribution System

Selecting a Power Distribution Arrangement Scheme


Once the load layout has been developed and areas of high load concentrations have
been identified, a power distribution scheme can be selected. A system should be
selected that will distribute power to the load centers by the most economical and
reliable means possible that meets the particular facility requirements.
The primary distribution voltage can be distributed to the load centers economically
and reliably with the following systems:
Radial
Primary selective
Primary loop
Secondary selective

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

The Distribution System


Radial System
In the radial system, one primary service feeder supplies power from a distribution
transformer to the loads (at utilization voltage) from a load center.
This system is simple in operation, and expansion is accomplished easily.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

The Distribution System


Primary Selective Distribution - A distribution system philosophy where equipment
such as Ring Main Units (RMU's), Switchgear, Load / Motor Control Center, and/or
Transformers are connected to two separate primary feeders through switching
equipment to provide a normal and an alternate source. Upon failure of the normal
source, the equipment can be switched to the alternate source.

Figure - Primary Selective System Example


(IEEE Std. 141-1993 Figure 2-2)
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

The Distribution System


Primary Open Loop Distribution - A distribution system philosophy where equipment
such as Ring Main Units (RMU's), Switchgear, Load / Motor Control Center, and/or
Transformers are connected through a number of tie circuits forming a loop. In this
configuration there are two routes which any point on a loop feeder can receive power.
The loop is considered "Open" when one of the series switches is open. See Figure
3.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

The Distribution System

Secondary Selective System


If two unit substations are connected through a normally open secondary tie circuit
breaker, the result is a secondary selective system.
If the primary feeder or a transformer
fails, the main secondary circuit breaker on the affected transformer is
opened and the tie circuit breaker closed. Operation may be manual or automatic.
Maintenance of primary feeders, transformers, and main secondary circuit breakers
is possible with only momentary power interruption (or no interruption if the
stations can be operated in parallel during switching). Complete station maintenance
will require a shut down. With the loss of a primary circuit or transformer, the
total substation load can be supplied by one transformer. To allow for this condition,
one or a combination of the following features should be considered.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

The Distribution System

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Selecting The System Voltage

Distribution Voltage
In most facilities it is necessary to
distribute power at a voltage higher
than the utilization voltages. When
choosing a distribution voltage, the
first voltage level to consider should
be the incoming utility (or generator)
voltage. If the utility supplies a voltage
in the range of 12,000 volts to 15,000
volts, it is often economical to use this
voltage as the primary distribution
voltage for the facility because
step down transformers are not
required.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection

Power Systems
Prime power generation in remote Oil & Gas
facilities are normally provided using Diesel
or Gas fuelled reciprocating engine
generator packages or gas turbine
generators.
For an individual generator that is rated
above 1000 kW, and is to be used in the oil
industry, it is usual practice to use a gas
turbine as the driving machine (also called
the prime mover). Below 1000 kW a diesel
engine is normally preferred, usually
because it is an emergency generator
running on diesel oil fuel.
On Many offshore smaller facilities it is also
common to see gas fuelled reciprocating
engine prime mover for power demands
below 1000MW
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Diesel Generators

Gas Turbine Generators


Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
The Gas Turbine Generator

Prime power generation in remote Oil


& Gas facilities are normally provided
using Diesel or Gas fuelled
reciprocating engine generator
packages or gas turbine generators.
Diesel Generators

Gas Turbine Generators


Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
The Gas Turbine Generator
Gas turbines can be classified in several ways, common forms are:-

Aero-derivative gas turbines.


available in single unit form for power outputs from about
8 MW up to about 25 MW. These outputs fall conveniently into the
typical power outputs required in the oil and gas production industry,
such as those on offshore platforms.

Light industrial gas turbines.


Easier maintenance is achieved by designing the combustion
chambers, the gas generator and compressor turbine section to be
easily removable as a single modular type of unit. The ratings of
machines in this category are limited to about 10 MW.
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
The Gas Turbine Generator

Heavy Industrial gas turbines.

Heavy industrial gas turbines are usually to be found in refineries, chemical plants and
power utilities. They are chosen mainly because of their long and reliable running times
between major maintenance overhauls. They are also capable of burning most types of
liquid and gaseous fuel, even the heavier crude oils. They also tend to tolerate a higher
level of impurities in the fuels. Heavy industrial machines are unsuitable for offshore
applications because:-

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
Selecting the Generator
What needs to be considered in selecting the generator:

Location: onshore/offshore

Source of Fuel.

Power Demand

Maintenance

Cost

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Sizing & Selection


Selecting the Generator
Step 1. Determine the generator power requirements, Pg (in kilowatts). It is
recommended that Pg for primary power generators equal running
load plus known future running load plus 10 to 20% spare capacity.
For stand-by and emergency generators, it is recommended that Pg
equal total connected load plus known future connected load plus 10
to 20% spare capacity.
Step 2. Select a standard generator rating (PG) equal to or greater than Pg. It
is recommended that the generator rating be based on a NEMA Class
B temperature rise. The generator should be specified with NEMA
Class F (or Class H) insulation so that it will operate below its insulation
temperature rating during normal operating conditions. This
design reduces the stress on the insulation and increases generator
life. The generator will also be able to operate in overload conditions
for short periods of time and still remain below the allowable temperature
Design Guide 1 -ratings.
Key Study Modules
Ipgrupp Engineering
www.Ipgrupp.com

Equipment Selection
Equipment Sizing & Selection

Selecting the Generator


Step 3. Determine the generator voltage drop during starting of the largest
motor. Usually a 15 to 20% voltage drop is acceptable if the motor is
not started often. The designer should refer to the generator
manufacturers motor starting applications data. As a rule of thumb, if
the
generator rating (in kW) is at least five times the numerical value of
the horsepower of the largest motor, the voltage drop will not be
greater than 15% with the generator already loaded to 50 to 75%.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
Selecting the Switchgear Assembly
What needs to be considered in selecting the generator:

Location: onshore/offshore

Source of Fuel.

Power Demand

Maintenance

Cost

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
Contents

1.

Equipment Selections
1. Generators
2. Transformers
3. Cables & Cable Support
4. Switchgear Systems
5. Electric Motors
6. Lighting Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
Contents

1.

Equipment Selections
1. Generators
2. Transformers
3. Cables & Cable Support
4. Switchgear Systems
5. Electric Motors
6. Lighting Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Selection
Equipment Sizing & Selection
Contents

1.

Equipment Selections
1. Generators
2. Transformers
3. Cables & Cable Support
4. Switchgear Systems
5. Electric Motors
6. Lighting Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Key One-Line Diagram


Contents

1.

Equipment Selections
1. Generators
2. Transformers
3. Cables & Cable Support
4. Switchgear Systems
5. Electric Motors
6. Lighting Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Key One-Line Diagram


Contents

1.

Overall One-LineDiagram

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Key One-Line Diagram


Contents

1.

Overall One-LineDiagram

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Developing The Key One-Line Diagram


Contents

1.

Overall One-LineDiagram

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Performing Systems Studies


Contents

1.

Perform System Studies


1. Hand Calculation
2. Software Tools

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Selecting Protective Devices


Contents

1.
2.
3.
4.

Selecting Protective Devices


Grounding Systems
Hazardous Areas
Stand-by Power Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Grounding Systems
Contents

1.
2.
3.

Grounding Systems
Hazardous Areas
Stand-by Power Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Hazardous Location
Contents

1.

Hazardous Areas

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Stand-By Power Systems


Contents

1.

Stand-by Power Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Electrical Design Process Summary Overview

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Electrical Design Process Phase Deliverables

Design Guide 1 - Key Study Modules

Ipgrupp Engineering

Hazards of Electricity

Risk/Effects of Shock
The effects depend on the
current (not the voltage), and
the worst damage occurs along
its path from the entry to the exit
point. Causes of immediate
death are ventricular fibrillation
and paralysis of the brain's
breathing centre or of the heart

Adhering strictly to applicable


International design codes and
regulations help to reduce the
risk of this hazard

Design Guide 1 - Key Study Modules

Ipgrupp Engineering

Typical Body response to Current

Design Guide 1 - Key Study Modules

Ipgrupp Engineering

Arc Flash

Current flowing through the air


Produces temperatures above
35,000 degrees F
Statistics show upwards of
2000 persons a year suffer
mild to serious injury from this
hazard
IT Can Kill You!!

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Electrical Hazards

Adhering strictly to applicable International design


codes and regulations help to reduce the risk of
this hazard

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Major Standards Used for Power System Design

OSHA Occupational Safety and Health Administration


NFPA 70-2005 NEC
NFPA 70E Electrical Safety in the Workplace
IEEE Recommended Practices
IEC

International Electro-Technical Commission

BS

British Standards

U.L. Underwriters Laboratories


ANSI American National Standards Institute
Client Preferred Design Instruction Guides
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

NFPA 70 - NEC
The National Electric Code was first
established in1897
Sponsored by the NFPA
Primary design codes for domestic
and commercial electrical installations
in North America
Not a Design Standard but a minimum
Code requirement for safe electrical
designs
Provides for several exemptions from
Code

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

ANSI
The American National Standards

Institute established in
1918
ANSI coordinates and endorses
standards produced by accredited
standards developers
Created to avoid duplication of
standards developed from IEEE, ASME,
ASTM and many others
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

IEC
Established In 1906 through leading
scientists and pioneering industrialists
from around the globe.
Ensures global standardization of
electrical apparatus and machinery.
The (IEC 60364) document provides
guidance to an authority on developing
national wiring principles that would, in
turn, serve as the basis to further
develop practices & Codes.
Predominantly used Electrical standards
in Europe

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

The Institute of Electrical and Electronic Engineers(IEEE)

Publishes Technical Standards.


The colored books
Categorized into 13 colored books
Blue Book is IEEE Std 1015-2006
Bronze Book is IEEE Std 739-1995
Brown Book is IEEE Std 399-1997
Buff Book is IEEE Std 242-2001
Emerald Book is IEEE Std 1100-2005
Gold Book is IEEE Std 493-2007
Gray Book is IEEE Std 241-1990
Green Book is IEEE Std 142-2007
Orange Book is IEEE Std 446-1995
Red Book is IEEE Std 141-1993
White Book is IEEE Std 602-2007
Violet Book is IEEE Std 551-2006
Yellow Book is IEEE Std 902-1998

www.IEEE.org
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

General Design Considerations

Coordination with other engineering disciplines( Process,Piping, Structural)


Plant Operating Considerations ( Onshore/Offshore?-Remote-Plant?)
Green Field/Brown Field Facility??

Plant Maintenance Considerations( Accessibility, By-Pass & redundancy)

Economic Considerations (Cost of Equipment Failure/ Start-Up Cost??)

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Key Study Modules Chapter 2

Electrical Load List Development


Power Supply and Distribution Selection
One-Line Diagram Development

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Electrical Load-List Development

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Electrical Load-List Development

Process Requirements
Utility Requirements
Electrical Code/Safety Specific
Requirements

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Electrical Load-List Development

P & ID

PUMP CALCULATION SHEET


Client
Project
Calc No
Name
Date
Equipment Number
Fluid Pumped

NGC

Fire Water Pump

By
Chk'd By
App'd By
Rev

O.U

00

4th-Jan-2006

Service
Water
1 x 100%
Duty
PHYSICA L PROPERTIES
Fluid Temperature, T
Max
30 C
40.0 C
Viscosity @T
0.797 cP
Density @T
996 kg/ m
Vapour Pressure @max T
4.247 kPaa
PUMP SPECIFICATION
Volumetric Flowrate
114 m/ h
Design Margin, Flow
10.0 %
Design Flowrate
125 m/ h
Pump Type
Centrifugal
Pump Centre Line Elevation
0.76 m
(above grade)
Pump Speed
3000 rpm
Pump Suction Impeller Type
single suction
SUCTION CONDITIONS
Suction Vessel Pressure
10.370 m
101.325 kPaa
Suction Liquid Level Elevation
2.34 kPa
1.00 m
(above grade)
Maximum Vapour Pressure
4.247 kPaa
0.435 m
Line / Fittings Pressure Drop
0.0 m
0.00279 kPa
Suction Head
103.667 kPaa
10.610 m
Available NPSH
99.42 kPa
10.175 m
NPSH Design Margin
9.77 kPa
1.00 m
Required NPSH
5.10 m
DISCHARGE CONDITIONS
Line / Fittings Press. Drop
1.044 m
10.2 kPa
Discharge Vessel Pressure
108.354 m
1058.7 kPaa
Discharge Liquid Level Elevation
0.95 kPa
0.86 m
(above grade)
Discharge Head
1069.85 kPaa
109.495 m
POWER
Differential Head
966.18 kPa
98.9 m
Flowrate
125 m/ h
Hydraulic Power
33.526 kW
Pump Efficiency
90.0%
Assumed
Estimated Power
37.251 kW
Calculated- X Inputed- X

Electrical Load-List Development

Rule Of Thumb: Matching Load HP to Motor Hp


Driven machine
power rating (kW)
Up to 15
16 to 55
56 and above

Margin of motor rating


above
the machine rating multiplier
1.25
1.15
1.10

Select 60HP(45KW) motor as your load


Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

Electrical Load-List Development

Select for Arial Lighting

Plot Plan
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

Power Supply & Distribution Selection

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Power Supply & Distribution Specification

Power Distribution Types


Voltage Selection

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Radial Distribution Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Primary Selective Distribution Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Secondary Selective Distribution Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Network Distribution Systems

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Voltage Selection
Usually 480Y/277 or 415Y/240
depending on National preference
Industrial loads normally supplied
through 3phase 480/415V
Lighting and low demand domestic
loads would be supplied through the
Phase to- Neutral Single phase
System 277/240
Further Voltage reduction to
208Y/120V is also employed in some
Countries to supply Light/domestic
loads

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Voltage Selection
Usually 4,160Y/2,400V, 11,000Y/6351V
13,200/7620V
Used when the load center becomes too
great or of significant distance from
source of power
11,000V/4,160V are the preferred
generating voltages for land based
facilities in the Oil industry.

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Develop Preliminary One-Line Diagram

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

One-Line Diagram Development

Graphic representation of all the loads, their


supply feeder cables, the protective devices
on the feeders and termination switchgear
equipment
The preliminary load list is a key input
document required to develop single line
diagrams along with derived feeder circuit
protective devices.
One drawing can typically be produced to
depict just a few devices in simple load to
feeder representation or up to hundreds of
devices as required to capture whole sections
of the distribution network.
Requires the engineers to have good
knowledge of standards graphical symbols
used to represent power circuit components
Design Guide 1 - Key Study Modules
www.Ipgrupp.com

Ipgrupp Engineering

One-Line Diagram Development

Typical Graphical Symbols employed


Naturally the preliminary load list is a key
input document required to develop single line
diagrams along with derived feeder circuit
protective devices.
One drawing can typically be produced to
depict just a few devices in simple load to
feeder representation or up to hundreds of
devices as required to capture whole sections
of the distribution network.
Requires the engineers to have good
knowledge of standards graphical symbols
used to represent power circuit components

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Develop Preliminary Single Line Diagram

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Key Study Modules Chapter 3

Equipment Selection, Sizing and Specification

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Equipment Sizing/Selection

Motor
Feeder Cables
Transformers

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

The majority of the electrical loads within


the process areas of a Oil & Gas plant
are motors.
Correct sizing of these equipment to
match the load is essential stage of the
electrical design.
Recall earlier example of fire water
pump

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Several other factors, Standards and


electrical Code requirements need to be
taken into consideration prior to selecting
the motor for your application
Article 430.4 Part winding Motors
Article 430.7 Markings on Motors

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Key Study Modules Chapter 4

System Studies

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

System Studies

Short Circuit Analysis


Load Flow & Voltage Drop
Protective Relay Coordination
Harmonic Analysis

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

Arc Flash

Design Guide 1 - Key Study Modules


www.Ipgrupp.com

Ipgrupp Engineering

General Information

This training guide was developed by Ipgrupp Engineering. Information contained in this
guide is subject to change without notice and Ipgrupp Engineering assumes no
responsibility for any damages resulting from use of the information contained herein.
The Information contained in this training guide is protected under the Federal Republic of
Nigeria copyright laws and may not be reproduced in whole or in part without written
consent by Ipgrupp Engineering
The class participant, by accepting this manual, agrees to the conditions listed on this page

Design Guide 1 - Key Study Modules

Ipgrupp Engineering
www.Ipgrupp.com

Design of Electrical Systems For the Oil & Gas Industry

Design Guide 1 - Key Study Modules


www.Ipgrupp.com