Drilling
What can Devico technology
help in
Tunnelling Projects
Chris Tai
Devico AS
TGN-24
4.1 Directional drilling techniques are now
available to drill from ground level to great
depth and then along a horizontal alignment.
This method does not require provision of
working space at the tunnel level and can be
very useful in GI for deep tunnels.
Product
Product
10
12
13
DeviDrill Wireline 76
Technical Specification
Hole : N-Size (76mm)
Core : 31.5mm / 3m length
Recommended dogleg =
9deg/30m ( R=180m )
Max. dogleg = 12deg/30m
Onboard survey tool
Measure while drilling (MWD)
Requires no reaming out
Bluetooth communication
14
Dogleg
A jargon in directional drilling industry
Three dimensional (3D) borehole trajectory
Expressed in terms of deg/30m
E.g. dogleg = 9 means deviated 9 degrees in
30m as a summation of both in inclination and
azimuth(bearing)
15
DeviTool Peewee
Technical
Specification
Electronic Multishot System (EMS)
Weight : 2.4 kg / 5.29lb w/
batteries
Diameter : 30mm / 1.18
Length = 975mm / 38.4
Battery Capacity : ~40,000
measures
Internal Memory : 1,984 measures
Temperature : -15 to 75oC (5 to
167oF)
Pressure : 300bar / 4350psi
Azimuth Range : 0o-360o
Inclination Range : 0o-180o
Bluetooth communication
16
Accuracy :Inclination : 0.2o
Azimuth : 0.5o
Toolface (Gravity) : 0.2o
DeviFlex
Technical
Specification
Electronic Multishot System (EMS)
Weight : 20kg
Diameter : 40mm
Length = 4m
Battery Capacity : 3-4months
(continues)
Internal Memory : 1,984 measures
Temperature : -15 to 75oC (5 to
167oF)
Pressure : 300bar / 4350psi
Inclination Range : 0o-180o
Bluetooth communication
Accuracy :Inclination : 0.2o
Azimuth : 0.01o/station
Toolface (Gravity) : 0.2o
17
Applications
Geotechnical projects Drill to follow the
tunnel alignment to investigate the
geological information
Mining industry Multilateral borehole
drilling, sidetracking
Target drilling By pass certain area under
the ground and hit the ultimate target
18
19
20
21
23
Subsea tunnel
Length 930 m
Reduced risk
Improved QA
Resulted in redesigned tunnel
allignment
24
25
26
27