Вы находитесь на странице: 1из 29

Security Level:

06/23/15

Installing and Commissioning


RTN 900 V1R3 Hybrid Microwave
MW Dept HCPT Project
www.huawei.com

Huawei Confidential

Contents
Key Points
Hardware Installation
Equipment Commissioning
DCN Commissioning

Key Points
1

Caution

Cause

Requirement

Properly handle the IF board

The field personnel do not know how

This point must be imparted

and SCC power switches.

to operate the power switches. As a

to every field engineer,

result, a large number of boards on

especially the personnel of

the existing network are damaged.

the partners.

Do not reseat IF cables

The ODU and IF board are damaged

This point must be imparted

when the power is on.

by the reseating of IF cables when

to every field engineer,

the power is on.

especially the personnel of


the partners.

Do not tear up the ODU seal

If the seal of the ODU is torn up or

This point must be imparted

or remove the ODU cover.

the cover of the ODU is removed, the

to every field engineer,

vendor will refuse to provide warranty

especially the personnel of

services.

the partners.

Do not damage equipment

If the damage is caused by artificial

This point must be imparted

with improper operations.

factors, the vendor will refuse to

to every field engineer,

provide warranty services.

especially the personnel of


the partners.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

Key Points

Train microwave partners for standardized operations according to projects.


Hand out related training materials to every partner and every engineering team.
Provide special trainings for the partners with serious problems.
Provide effective trainings to all new partners.

Properly handle the IF board and SCC power switches.

These boards are damaged due to

improper operations of the personnel.


Note: So many boards are found
damaged in only one project!

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 4

Key Points

Train microwave partners for standardized operations according to projects.


Hand out related training materials to every partner and every engineering team.
Provide special trainings for the partners with serious problems.
Provide effective trainings to all new partners.

Do not reseat IF cables when the power is on.

Ensure the power is off before

reseating IF cables or IF boards.


Pull IF cables out of the IF board, IF

jumper, or ODU or plug into them


after the power is off.
IF boards should also be reseated

after the power is off.


Be careful in the use of a multimeter

for testing the IF output voltage to


avoid short circuits.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 5

Key Points

Train microwave partners for standardized operations according to projects.


Hand out related training materials to every partner and every engineering team.
Provide special trainings for the partners with serious problems.
Provide effective trainings to all new partners.

Do not reseat IF cables when the power is on.

Power off the IF board before

reseating IF cables.
Reseating IF cables when the power is on

tends to cause a short circuit between the


-48V power supply and the GND, which will
blow out the protection tube.
The picture shows the short circuit.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

Key Points

Train microwave partners for standardized operations according to projects.


Hand out related training materials to every partner and every engineering team.
Provide special trainings for the partners with serious problems.
Provide effective trainings to all new partners.

Do not tear up the ODU seal or remove the ODU cover.


If the seal of the ODU is torn up or

the cover of the ODU is removed


without permission, the vendor will
refuse to provide warranty services.
The seal of the ODU shall not be torn

up.
The ODU cover shall not be removed

without permission.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

Key Points

Train microwave partners for standardized operations according to projects.


Hand out related training materials to every partner and every engineering team.
Provide special trainings for the partners with serious problems.
Provide effective trainings to all new partners.

Do not damage equipment with improper operations.


If the damage is caused by artificial

factors, the vendor will refuse to


provide warranty services.
Handle ODUs with care.
Hoist and install ODUs with caution

to avoid collision with the tower.


If the damage is caused by artificial

factors, the vendor will refuse to


provide warranty services.
The ODUs damaged during

engineering operations must be


returned as soon as possible. The
vendor shall not provide warranty
services after the warranty expires.
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 8

Contents
Key Points
Hardware Installation
Equipment Commissioning
DCN Commissioning

Installation of RTN 900 V1R3 Hybrid


Microwave Hardware
Scenario

Note

Key Points

Installation of The operation is the same as


that of the traditional
ODUs
microwave.

Installation of The operation is the same


as that of the RTN 900
IDUs
V1R1.

HUAWEI TECHNOLOGIES CO., LTD.

The Standardized Operating Process


(SOP) is implemented based on the
existing process.
Courseware for partners .
3D animation.

Huawei Confidential

Page 10

Installation of IDUs
Requirements for the
input power of the
IDU

RTN 910

RTN 950

Rated Voltage

48V/60V

48V/60V

Voltage Range

38.4V 72V

38.4V 72V

Number of Input Power


Supplies

Recommended Fuse
Capacity

10A

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

20A

Page 11

Contents
Key Points
Hardware Installation
Equipment Commissioning
DCN Commissioning
Acceptance
Other Specifications

Commissioning Strategies

Remote commissioning is recommended.

Third-party service channel or


direct connection

Microwave
NMS

IDU

IDU

BSC
MSC

BTS
Means for supporting the partner to complete the
construction of BTSs independently:
WEBLCT
Handheld terminal
Remote access in wireless mode
SOP

HUAWEI TECHNOLOGIES CO., LTD.

Means for remote access:


Downloading the script files for remote
access in wireless mode
Centralized NMS (including 2M and
shared 2M)

Huawei Confidential

Page 13

Service
configuration
tools
U2000
U2000 LCT

Equipment Commissioning Strategies

It is recommended that the partners complete the


station work independently.

Central Telecommunications Room

System
commissioning

Software commissioning
engineers

Service
configuration

Station work

RTN 900

Hardware
installation

Equipment
power-on

RF
configuration

Hardware personnel

HUAWEI TECHNOLOGIES CO., LTD.

Hardware
installation

Antenna
alignment
Complete
the
station
work

Equipment commissioning

Antenna
alignment

Huawei Confidential

Page 14

Equipment Commissioning Key Points


Methods for commissioning the hybrid microwave are described as
follows:

The AM function of the hybrid microwave should be disabled before the


antennas are aligned.
The antennas should be aligned in low modulation mode provided by
network planning.
The received signal level (RSL) value must be within the scope as
required. The AM function of the hybrid microwave must be enabled after
the antennas are aligned.

Note: During equipment commissioning, perform operations as


required. Otherwise, the boards may be damaged and you have to enter
the station to replace the damaged boards!

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 15

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Align
antennas

Equipment Commissioning
Power On
There is no power switch on the RTN 900 IDU cabinet, so that, it is
important to test the input voltage value.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 16

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Align
antennas

Equipment Commissioning
Power on equipment and IF

boards

RTN 950

Power on the corresponding


power distribution box first.
Power on the ODUs on the IF
board (including active and
standby ODUs). Note: The
switches must be first pulled
out and then turned.

RTN
910

The switches must be


pulled out first and then
turned to the right. Forcible
pulling is prohibited!
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 17

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Align
antennas

Equipment Commissioning
Connect Laptop with RTN 900

ETH-OAM

WEBLCT

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 18

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Equipment Commissioning
Login U2000 Web

LCT

password T2000

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 19

Align
antennas

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Equipment Commissioning

Creat NE

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 20

Align
antennas

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Equipment Commissioning

Align
antennas

Configure NE
names.
Change NE IDs.
The IDs in one
network must be
unique.

Configure NE ID/ NE Name

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 21

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Equipment Commissioning
Add boards.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 22

Align
antennas

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Align
antennas

Equipment Commissioning
Create the IF 1+1 protection group (this step can be omitted for the 1+0 mode).

Slot 1 and Slot 2 constitute a protection group with


Slot 1 as the recommended working slot.
Slot 3 and Slot 5 constitute a protection group with
Slot 3 as the recommended working slot.
Slot 4 and Slot 6 constitute a protection group with
Slot 4 as the recommended working slot.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 23

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Align
antennas

Equipment Commissioning
Configure Link

See Next Page


HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 24

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Align
antennas

Equipment Commissioning

Configure Hybrid/AMset IF channel band and confirm

that the AM function is disabled.

Confirm that the AM function is disable


.the default value is disable.

Set the channel space and


modulation accroding to the design
document.

Input the E1 number of the Hybrid


microwave frame. The E1 number
should be the same as the design
document.

The number of E1 should be the same


in one hop.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 25

Power on
equipment

Basic
configuration

Confirm that the AM


function is disabled

Equipment Commissioning
Align the antennas query the receive power.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 26

Align
antennas

Contents
Key Points
Hardware Installation
Equipment Commissioning
DCN Commissioning

DCN Commissioning Extended ECC


Communicate NMS information through the extended

ECC.
For one telecom room, multiple RTN600s can interwork through
the extended ECC. This work must be made clear to partners in
advance.

NMS
HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 28

Thank you
www.huawei.com

Вам также может понравиться