Академический Документы
Профессиональный Документы
Культура Документы
2015
DISCLAIMER
This presentation may contain forward looking statements that are subject to risk factors associated with the natural
resources sector and the business of coal mining.
Sharyn Gol JSC believes that the expectations reflected in these statements are reasonable however they may be
affected by a range of variables and changes in underlying assumptions which could cause actual results or trends
to differ materially, including but not limited to: price fluctuations, supply and demand dynamics, currency
fluctuations, drilling and production results, estimates of reserves and resources, loss of market, industry
competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and
financial market conditions in various countries and regions, political risks, project delay or advancement, approvals
and cost estimates.
Sharyn Gol JSC believes that any information contained in this document was accurate as Apr 2014. However,
Sharyn Gol JSC does not warrant its accuracy or reliability.
This information is provided expressly on the basis that recipients will carry out their own independent enquiries into
the matters contained here in and make their own independent decisions about the affairs, financial position, or
prospects of Sharyn Gol JSC; who reserves the right in its absolute discretion, to update or amend and/or
supplement any information at anytime.
Anniversary Celebrations
July 31 - August 1
Discovered
1930
Mining Started
1965
Exploration
1958-1960
Drill program,
JORC report
2011
Listed in MSE
1993
Peak production
2.5 Mtpa
(1975-1983)
Fully privatized
2003
50 Year
Anniversary
2015
Wash plant
commissioned
Sharyn Gol coalfield was discovered in the 1930s, but it wasnt until 1958 that a joint venture between
Mongolian and Russian exploration teams recognized its economic potential.
Exploration was conducted up until 1961, culminating in mine construction commencing in 1962, with first
production achieved in 1965.
By 1975, the mine was producing 1.1 Million tons per annum (Mtpa) before expansion to a design capacity of
2.5 Mtpa, between 1976 and 1980.
However, due to the withdrawal of Soviet financial support, transition period to market economy, production
was unable to keep pace and a gradual reduction in coal production was experienced in the 1990s.
In 2003, company fully privatized
Tonnes
RD,
ASH,
CV,
IM,
VM,
FC,
S,
g/cc
Kcal/kg
Measured
61,371,000
1.7
33.4
4,480
2.9
29.0
34.6
0.9
Indicated
31,222,000
1.7
35.4
4,344
2.9
27.9
33.8
0.9
Inferred
24,641,000
1.7
35.7
4,405
2.9
27.8
33.6
1.0
117,233,000
1.7
34.4
4,428
2.9
28.5
34.2
0.9
Total
Tonnes
RD,
ASH,
CV,
IM,
VM,
FC,
S,
g/cc
Kcal/kg
Measured
110,697,000
1.7
32.5
4,382
2.8
29.3
35.4
1.4
Indicated
48,314,000
1.7
32.3
4,352
2.8
29.5
35.4
1.6
Inferred
61,318,000
1.6
30.3
4,479
2.6
30.4
36.8
2.1
220,329,000
1.7
31.8
4,403
2.7
29.7
35.8
1.7
Total
Commissioned 6/17/2015
In 2015 thermal coal and coal based product demand is to reach 15 Mtpa
Government of Mongolia has approached to development program for
Darkhan City Area as heavy industrial zone and power generating expansion
point due the shortage of power grid.
Darkhan TPP expansion 68 MW expected
Darkhan Heavy Industrial Development Zone development 128 MW
Erdenet TPP expansion 48 MW
Erdenet Copper Mines Extension on the power generating section
New Coal Heating Power Plants Project /above 5 GW/
Pig Iron Plant extension
Smokeless fuel demand to reduce the air pollution in areas of Ulaanbaatar,
Darkhan and Erdenet Cities
Cement Factory expansion due to rapid increase of construction demand
Increase in production to 2.5 Mtpa
Sales mix with higher proportion of industrial or unregulated sales
The Future
5000
4500
Power
Deficit
4000
CHP 2
3500
CHP 3
3000
CHP 4
2500
Erdenet
2566
2000
CHP 5
1500
1000
Darkhan
774
Import
214
Demand
500
0
2011
2012
2013
2014
2015
2020
In 2015 thermal coal and coal based product demand is to reach 15 Mtpa to cover the deficit of energy
in near future.
Power plant
Status
Producing power
capacity
Location
Demand
(000s ton)
1 Amgalan Powerplant
Operational
300
killowatt
Ulaanbaatar
500
2 Powerplant #3
Operational
50
Megawatt
Ulaanbaatar
300
3 Powerplant #4
Operational
100
Megawatt
Ulaanbaatar
500
4 Dornod Powerplant
Operational
100
Megawatt
Dornod
300
5 Bayanteeg Powerplant
Plan
40
Megawatt
Uvurkhangai
250
6 Telmen Powerplant
Plan
100
Megawatt
Zavhan
450
7 Ulaanbaatar #5 Powerplant
Plan
450
Megawatt
Ulaanbaatar
3000
8 Tavantolgoi Powerplant
Plan
450
Megawatt
Sogth gobi
3000
9 Baganuur Powerplant
Plan
700
Megawatt
Baganuur
1600/3200
10 Shivee-Ovoo Powerplant
Plan
300
Megawatt
Gobisumber
1300
11 Chandagan Powerplant
Plan
600
Megawatt
Khenty
3000
TOTAL
3,190
12,600
Industrial Projects
Status
Pr
Location
Operational
Steel
Darkhan
Demand
(000s ton)
300
2 Erdenet Uildwer
Operational
Cement
Erdenet
250
Operational
Cement
Ulaanbaatar
120
4 Erel Cement
Operational
Cement
Darkhan
100
5 Achit ikht
Operational
Copper
Erdenet
10
Power plant
TOTAL
12,600
Retail Market
Retail
715
710
710
705
700
700
Retail
700
695
690
690
690
685
2012
680
0.5
1.5
2014
2013
2
2.5
3.5
2015
4
4.5
2016
5
5.5