Академический Документы
Профессиональный Документы
Культура Документы
The inventory problems in the European distribution center. HP faced long delivery
lead time of about four to five weeks from its production facility in Vancouver,
Washington, to Europe. The Vancouver plant is a high speed, high- volume facility
where manufacturing takes about a week.
HP concerned with high inventory levels and inventory imbalance in Europe. One
of the characteristics of the DeskJet product line is that it is customized for local
markets, a process called localization. This involve adding labeling and
documentation in the correct language and customizing the power supply for the
correct voltage level and plug.
What are the frameworks, tools and concepts that companies can use as they
think about the product engineering process and its impact on supply chain
performance?
The supply chain: which focuses on the flow of physical products from
supplier through manufacturing and distribution all the way to retail outlets
and customers, and
The development chain: which focuses on new product introduction and
involves product architecture, make/buy decisions, earlier supplier
involvement, strategic partnering, supplier footprint, and supply contracts.
These two chains will intersect as products move from development to
production, and just as clearly, decision made in the development chain
will impact the efficiency of the supply chain.
How can design for logistics concepts be used to control logistics costs and
make the supply chain more efficient?
DFL addresses ,using the following three key components: Economic packaging and transportation.
Concurrent and parallel processing.
Standardization.