Inspection Plan
William D. Corbett
KTA-Tator, Inc.
Preparing a Coating
Inspection Plan
Webinar Content
Purpose and benefits of developing an inspection plan
Review the content of the SSPC Guide for Planning
Coatings Inspection
Common formats of inspection plans
Common inspection check points that are transferred
from the specification to the inspection plan
Common inspection instruments, standards, guides
and methods used to perform inspection that are
listed on an inspection plan
Listing the acceptance criteria from the specification
onto the inspection plan
Learning Outcomes
Completion of this webinar will enable the participant to:
Describe the purpose and importance of an inspection plan
Explain the benefits of an inspection plan
Recognize the SSPC Guide for Planning Coatings Inspection
Describe the various formats of inspection plans
Extract inspection check points from a specification
Identify the instruments, guides and methods used to
inspect
Extract the acceptance criteria from a specification for each
of the inspection check points
Prepare an inspection plan
Purpose of an Inspection
Plan
Benefits of a Coatings
Inspection Plan
Coating specifications can be complex
documents
Specifications typically contain the quality
requirements for a coatings project
Good inspection doesnt happen by
accident; it requires planning
Inspection plans make specification
enforcement more streamlined and
complete
Provide a key communication tool between
QA and QC personnel
Documents
Project specification
Referenced standards (SSPC, NACE, ASTM,
etc.)
Product data sheets
MSDS
Complex
Simple format, plus three additional columns
Testing Frequency
Standard Test Method Reference
Specification Reference (Part/Item No.)
Technique/Instrumen
t
Acceptance
Criteria
Verify pre-blast
Visual
surface cleanliness
Removal of all
visible grease, oil &
debris
Expendable, angular
slag, no visible oil;
< 1,000 S/cm
Verify compressed
air cleanliness
Blotter test
Verify installation
of protective
coverings
Visual
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test
Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify preblast
surface
cleanliness
Visual
100% of
surface
SSPC-SP 1
3.4.2
Removal of all
visible grease,
oil & debris
Verify
correct type
and
cleanliness
of abrasive
media
Visual &
conductivity
meter
Each lot of
abrasive
SSPC AB 1
ASTM D 7393
ASTM D 4940
2.3.1
Expendable,
angular slag,
no visible oil;
< 1,000 S/cm
conductivity
Verify
compressed
air
cleanliness
Blotter test
Twice per
work shift
ASTM D 4285
3.4.7
Verify
installation
of
Visual
Prior to
surface
preparation
NA
3.4.1
Properly
installed &
maintained
Hold Point 1
Pre-Surface Preparation
Examples of inspection check points
Contractor submittals
Surface preparation media
Coatings materials
Containment and ventilation
Waste management
Surface contamination
Oil, grease and debris
Soluble salts
Hold Point 2
Post-Surface Preparation
Examples of inspection check points
Ambient conditions
Surface preparation media
Removal of surface contamination
Surface cleanliness
Surface profile
Surface imperfections
Waste management
Hold Point 3
Surface Conditions for
Coatings Application
Examples of inspection check points
Surface cleanliness
Ambient conditions
Recoat windows
Hold Point 4
Coating Application
Examples of inspection check points
Coatings materials
Mixing, thinning and straining
Ambient conditions
Wet film thickness
Coatings application defects
Hold Point 5
Post-Coating Application
Examples of inspection check points
Coating thickness
Ambient conditions
Recoat window/free of contamination
Hold Point 6
Post-Curing of Coating
Examples of inspection check points
Coating application defects (each coat)
Dry film thickness (each coat)
Pinhole/holiday detection
(buried/immersion service)
Hold Point 7
Final Inspection
Examples of inspection check points
Repair and touch-up
Waste removal
Site restoration
Verification of corrective action
implementation
Guides
Purpose
Sling psychrometer
Psychrometric charts
Electronic psychrometer
Conductivity Meter
Comparator Discs
Depth micrometer
Blotter paper
SSPC VIS 1
SSPC VIS 3
Paint thermometer
Developing an
Inspection Plan
Example based on maintenance painting
of a bridge structure
First, populate from the specification:
Column
Column
Column
Column
1:
3:
5:
6:
Verify
grease/ oil
removal
Technique/
Instrumen
t
Frequency
of Tests
100% of
surfaces,
prior to
surface
prep.
Standard
Test
Method
Reference
Spec.
Referenc
e
45-2.03
Acceptance
Criteria
No visible oil
or grease
contamination
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test
Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
grease/ oil
removal
100% of
surfaces,
prior to
surface
prep.
45-2.03
No visible oil
or grease
contamination
Verify
surface
chloride
removal
Three tests
per 1000
sq. ft.
45-2.03
< 7 g/cm2
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test
Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
grease/ oil
removal
100% of
surfaces,
prior to
surface
prep.
45-2.03
No visible oil
or grease
contamination
Verify
surface
chloride
removal
Three tests
per 1000
sq. ft.
45-2.03
< 7 g/cm2
Verify
correct
abrasive
type &
cleanliness
Each lot
45-2.04
Expendable;
angular; no
oil;
<1000
Mho/cm
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test
Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
grease/ oil
removal
100% of
surfaces,
prior to
surface
prep.
45-2.03
No visible oil
or grease
contamination
Verify
surface
chloride
removal
Three tests
per 1000
sq. ft.
45-2.03
< 7 g/cm2
Verify
correct
abrasive
type
Each lot
45-2.04
Expendable;
Angular
Verify
compressed
air
cleanliness
Once per
shift
45-2.04
No visible oil
or water on
collector
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test
Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
grease/ oil
removal
100% of
surfaces,
prior to
surface
prep.
45-2.03
No visible oil
or grease
contamination
Verify
surface
chloride
removal
Three tests
per 1000
sq. ft.
45-2.03
< 7 g/cm2
Verify
correct
abrasive
type &
cleanliness
Each lot
45-2.04
Expendable;
angular; no
oil;
<1000 S/cm
Verify
compressed
air
cleanliness
Once per
shift
45-2.04
No visible oil
or water on
collector
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
surface
profile depth
Three tests
per area
cleaned, per
shift
45-2.04
1.5-3 mils
Verify
surface
prep.-toprimer
interval
After final
surface
prep., per
area
45-2.04
Within same
day as blast
cleaning
Verify dust
removal
Prior to
primer appl.
45-2.04
No visible dust
Verify correct
coating
matls.
Prior to
surface
prep.
45-2.05
OZ/EP/PU from
1
manufacturer
Coating
thickness
After each
coat
45-2.05
Primer: 3-5
mils
Interm: 5-7
mils
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Measure
ambient
conditions &
surface
temp.
Prior to
coating
mixing and
4 hr.
intervals
45-2.06
Verify proper
mixing of
coatings
During
mixing
45-2.07
Mechanical
mixing blade
Verify
straining of
primer
Prior to trsfr.
to spray pot
45-2.07
Strained
Verify proper
thinning
Prior to
addition
45-2.07
Verify
lighting
Prior to
production
45-2.07
Verify
Prior to
45-2.07
Minimum 50 fc
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify spray
pot agitation
During
primer
application
45-2.07
Constant
agitation
during appl.
Stirrer w/i 2
from bottom
Verify primer
appl. by
spray
Prior to
primer appl.
45-2.08
Spray
Verify
intercoat
cleanliness
Prior to each
successive
coat
45-2.08
No moisture,
dust, grease,
etc.
Verify recoat
intervals
Prior to each
successive
coat
45-2-08
Minimum and
maximum per
PDS
Verify
workmanship
After appl.
of each coat
45-2.08
No runs, drips,
sags or misses
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test
Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
enclosure
integrity
Daily
45-2.09
No damage to
work, property
or persons
Verify proper
stenciling
Prior to
demobilizati
on
45-3
Proper
location, size,
content and
color
Verify time of
operations
Daily
45-2.04
45-2.05
Daylight hours
only
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
grease/ oil
removal
Visual
and/or
water break
100% of
surfaces,
prior to
surface
prep.
SSPC-SP 1
45-2.03
No visible oil
or grease
contaminatio
n
Verify
surface
chloride
removal
Latex
patch/sleev
e
Clstrip/tube
Three tests
per 1000
sq. ft.
SSPC Guide
15
45-2.03
< 7 g/cm2
Verify
correct
abrasive
type &
cleanliness
Visual;
Vial test
(oil);
Conductivit
y meter
Each lot
SSPC AB 1;
Oil:
ASTM D 7237
Conductivity:
ASTM D 4940
45-2.04
Expendable;
angular; no
oil;
Verify
compressed
air
cleanliness
Blotter test
Once per
shift
ASTM D 4285
45-2.04
<1000 S/cm
No visible oil
or water on
collector
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
surface
profile depth
Visual
comparator
Depth
micro.
Replica
tape
Three tests
per area
cleaned, per
shift
ASTM D 4417
45-2.04
1.5-3 mils
Verify
surface
prep.-toprimer
interval
Visual
After final
surface
prep., per
area
NA
45-2.04
Within same
day as blast
cleaning
Verify dust
removal
Visual/tactil
e
Prior to
primer appl.
NA
45-2.04
No visible dust
Verify correct
coating
matls.
Visual
Prior to
surface
prep.
NA
45-2.05
OZ/EP/PU from
1
manufacturer
Coating
Thickness
Calib. dry
film
After each
coat
SSPC-PA 2
45-2.05
Primer: 3-5
mils
Methods
A, B, or C
Technique/
Instrument
Frequenc
y of Tests
Standard
Test Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Measure
ambient
conditions &
surface
temp.
Sling
psychromete
r;
psychrometri
c charts;
surf.
thermometer
Prior to
coating
mixing and
4 hr.
intervals
ASTM E 337
45-2.06
Verify proper
mixing of
coatings
Visual
During
mixing
NA
45-2.07
Mechanical
mixing blade
Verify
straining of
primer
Visual
Prior to
trsfr. to
spray pot
NA
45-2.07
Strained
Verify proper
thinning
Visual
Prior to
addition
NA
45-2.07
Verify
lighting
Light Meter
Prior to
production
SSPC Guide
12
45-2.07
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify spray
pot agitation
Visual
During
primer
application
NA
45-2.07
Constant
agitation
during appl.
Stirrer w/i 2 of
bottom
Verify primer
appl. by
spray
Visual
Prior to
primer appl.
NA
45-2.08
Spray
Verify
intercoat
cleanliness
Visual/tactil
e
Prior to
each
successive
coat
NA
45-2.08
No moisture,
dust, grease,
etc.
Verify recoat
intervals
Visual
Prior to
each
successive
coat
NA
45-2-08
Minimum and
maximum per
PDS
Verify
workmanshi
Visual
After appl.
of each coat
NA
45-2.08
No runs, drips,
sags or misses
Technique/
Instrumen
t
Frequency
of Tests
Standard
Test
Method
Reference
Spec.
Referenc
e
Acceptance
Criteria
Verify
enclosure
integrity
Visual
Daily
NA
45-2.09
No damage to
work, property
or persons
Verify proper
stenciling
Visual
Prior to
demobilizati
on
NA
45-3
Proper
location, size,
content and
color
Verify time of
operations
Visual
Daily
NA
45-2.04
45-2.05
Daylight hours
only
Summary
During this webinar, we have:
Described the purpose and importance of an inspection plan
Explained the benefits of an inspection plan
Reviewed the SSPC Guide for Planning Coatings Inspection
Described two basic formats of inspection plans
Identified common inspection check points invoked by a
specification
Listed common instruments, guides and methods used to
inspect
Described how to extract the acceptance criteria invoked by
a specification for each of the inspection check points
Prepared an inspection plan for recoating a bridge
Preparing a Coating
Inspection Plan
THE END