What is APQP?
Advanced Product Quality
Planning Cycle
APQP Background
Automotive industry challenges:
Solution:
Ford, GM, Chrysler APQP Task Force jointly developed in the
late 80s to standardize their respective supplier quality
systems.
Continuous Improvement:
Many industries outside the Automotive industry have
embraced the AIAG APQP process to achieve similar benefits
INPUTS:
Assure
Assure that
that
customer
customer needs
needs
and
and expectations
expectations
are
are clearly
clearly
understood.
understood.
Design Goals
Reliability & Quality
goals
CONC targets
Preliminary Bill of
Materials
Preliminary Process
Flow Chart
Preliminary list of
Special Product and
Process
Characteristics
Product Assurance
Plan
Management Support
* The inputs and outputs applicable to the process may vary according to the
product process and customer needs and expectations.
OUTPUTS:
Design Failure Mode and Effects
Analysis (DFMEA)
Design For Manufacturability and
Assembly
Design Verification
Design Reviews
Prototype Build Control plan
Engineering Drawings (Including
Math Data)
Engineering Specifications
Material Specifications
Drawing and Specification
Changes
OUTPUTS:
New Equipment, Tooling and
Facilities Requirements
Special Product and Process
Characteristics
Gages/Testing Equipment
Requirements
Team Feasibility
Commitment
Management Support
Develop a
manufacturing
system and its
related control
plans to achieve
quality products.
OUTPUTS:
Packaging Standards
Product/Process Quality
System Review
Process Flow Chart
Floor Plan Layout
Characteristics Matrix
Process Failure Mode and
Effects Analysis (PFMEA)
Pre-Launch Control Plan
Process Instructions
Measurement Systems
Analysis Plan
Preliminary Process
Capability Study Plan
Packaging Specifications
Management Support
Validate manufacturing
process through
production trial run.
Validate that the control
plan and process flow
chart are effective and
that the product meets
customer expectation.
Packaging Standards
Product/Process Quality
System Review
Process Flow Chart
Floor Plan Layout
Characteristics Matrix
Process Failure Mode and
Effects Analysis (PFMEA)
Pre-Launch Control Plan
Process Instructions
Measurement Systems
Analysis Plan
Preliminary Process
Capability Study Plan
Packaging Specifications
Management Support
OUTPUTS:
Measurement Systems
Evaluation
Significant Production Run
Preliminary Process
Capability Study
Production Part Approval
Production Validation
Testing
Packaging Evaluation
Production Control Plan
Quality Planning Sign-Off formal
Management Support
Evaluate outputs,
effectiveness of
the product
quality planning
efforts.
OUTPUTS:
Reduced Variation
Improved Customer
Satisfaction
Improved Delivery and
Service
Effective use of best
practice, lessons learned
Maximum ROI
Minimum Waste
Minimum CONC
10
Low Volume
APQP plans may be specific to part families with activities focused
on the parent part
More limited validation would be done on child parts
Family part differences should be understood and higher risk
differences incorporated into APQP plans
11
APQP Summary:
What we do:
Design Quality
DFMEA / PFMEA /
DFM/A
Manufacturing Quality
Control Plans
Process Flows
Measurement
System Analysis
Capability Analysis
Process Validation
Run at rate
Supplier Qualification &
Quality Requirements
Product Qualification
1st Article
Inspection
PPAP
Tooling & Gauges
Testing
How we do it:
APQP
What we get:
UP
FRONT
DETAILED
QUALITY
Defect Free
Launches
Reduced Warranty
Claims
Zero Spills
Customer
Satisfaction
Robust Products
Greater Supplier
Control
Reduced supplier
cost
PLANNING
Leadership
Engagement is Critical
1
2014 Eaton. All Rights Reserved.
12
APQP Benefits:
Manufacturing process functions that are clearly planned,
validated, documented and communicated that result in:
CONC
Redesign
Re-qualifications
Escape Investigations
Development
Production
Time
13
14
16
16
What is PPAP?
Production Part Approval Process
Standard used to formally reduce risks prior to product
or service release, in a team oriented manner using
well established tools and techniques
Initially developed by AIAG (Auto Industry Action
Group) in 1993 with input from the Big 3 - Ford,
Chrysler, and GM
AIAGs 4th edition effective June 1, 2006 is the most
recent version
PPAP has now spread to many different industries
beyond automotive
2014 Eaton. All Rights Reserved.
17
Production Run
PPAP data must be submitted from a
production run using:
18
Purpose of PPAP
Provide evidence that all customer
engineering design record and specification
requirements are properly understood by the
organization
To demonstrate that the manufacturing
process has the potential to produce product
that consistently meets all requirements during
an actual production run at the quoted
production rate
2014 Eaton. All Rights Reserved.
19
20
20
Correction of discrepancy
Change to optional construction or material
Sub-supplier or material source change
Change in part processing
Parts produced at a new or additional location
PPAP is required with any significant
change to product or process!
2014 Eaton. All Rights Reserved.
21
22
Level 2
Level 3
Level 4
Level 5
23
24
25
PPAP Status
Approved
The part meets all Eaton requirements
Supplier is authorized to ship production quantities of the
part
Interim Approval
Permits shipment of part on a limited time or piece quantity
basis
Rejected
The part does not meet Eaton requirements, based on the
production lot from which it was taken and/or accompanying
documentation
Production quantities shall
not be shipped before Eaton
Approval
2014 Eaton. All Rights Reserved.
26
27
28
Component drawings
Assembly drawings
Bill of Materials
Referenced engineering specifications
Material specifications
Performance or test specifications
29
30
31
Materials selection
Tolerance stack-up
Software
Interfaces
DVP&R (life cycle tests)
PROLaunch element
Initial DFMEA in Phase 2
Complete DFMEA in Phase 3
32
33
34
35
Create PFMEA
Customer CTQs identified
After
Suppliers Selected
After
Gage Plan Created
36
37
38
Engineers
Operators
Supervisors
Maintenance
Supply Chain
Engineering specifications
Lead time requirements
Target manufacturing costs
Operator experience
Observation
Brainstorming
2014 Eaton. All Rights Reserved.
39
Receiving
Storage/ material handling
Manufacturing
Offline inspections and checks
Assembly
Testing
Shipping
40
41
Objective or Purpose
Identifies potential failure modes,
causes, and effects. Inputs come from
the process flow diagram.
Identifies key inputs which affect quality,
reliability and safety of a product or
process.
When to Use It
IMPORTANT!
42
FMEA Origins
Initially developed by the
US Military as Failure
Mode Effects and Criticality
Analysis (FMECA)
Widely adopted by NASA
during the 1960s to prevent
errors on the Apollo
program
Brought over to the
automotive industry by
Ford after issues with Pinto
fuel tanks
2014 Eaton. All Rights
Reserved.
43
PFMEA - Step 1
Failure Modes
For each Process Input,
determine the ways in
which the input can go
wrong.
TIP
There should be at least one failure mode for each input.
2014 Eaton. All Rights Reserved.
44
Typical failure modes could be, but are not limited to:
Bent
Open circuited
Dirty
Binding
Cracked
Improper setup
Burred
Deformed
Tool worn
Handling Damage
45
Bend
Test
Remove /
Unload
Insert
Index
Measure
Y Orientation
Radial
Orientation
Dirt
Contamination
Damage
No test
Over Insertion
Fails to Remove
Non-Conforming
Part
Removes
Conforming Part
Miscategorizatio
n
No remove
No measure
Inaccurate
Gaging
Missed op
Damage
Flattened
Contamination
Cracked
Folded
Broken fold
Scratch
Dents
Chips
Deformed
No bend
X Orientation
Z Orientation
No Insertion
Partial Insertion
X-Y Orientation
No index
46
Dip
Package
Initialize
No Stake
Missed
Operation
Incorrect Qty
Under Stake
Over Stake
Partial Dip
Incorrect Label
Incorrect Box
Mixed Parts
Damage
Feed-Out
Wrong Wire
No Feed
Wind
Cut-Of
Fail to Clear
Registers
Write Incorrect
Value to Register
During Clearing
Press
No Cut-Of
High force
Low force
Tooling
alignment
Too Fast Speed
Setup
Pump-Up
Fail to Recognize
Station
Synchronize
Incorrect Setup
No Synchronize
Incomplete
Setup
No Setup
Load
Fill / Oil
Torque
Wrong part
Mix part
Wrong fluid
Too much fluid
Damaged
component
No torque
Dirty part
Wrong lane
Wrong
orientation
Damage
Over torque
47
Mold
Partial Rotation
Over Rotation
No rotation
Rotate to wrong
side
Damaged
component
Rotate
Incomplete
Illegible
Wrong Mark
Mark
Wrong Grease
no grease
X-Y Orientation
Density variation
Dimension variation
Sink
Missing Mark
Z Orientation
Flowlines
Wrong location
Contamination
Damage
Too much
Too little
Contamination
Incorrect
number of
greasing points
Shorts
Warp
Molded
contamination
Weldlines
color variation
brittleness
scratches
drag marks
gate stubs
burns
flash
mixed parts
part count incorrect
bubbles
sirface contamination
voids
splay
damaged part
wrong part
48
PFMEA - Step 2
Potential Failure Effects
For each Failure Mode,
determine what effect
the specific failure
could have on the
process output.
TIPS
There should be at least one failure effect for each failure mode.
Effects should be specific, clear, and leave no doubt to the uninformed reviewer.
2014 Eaton. All Rights Reserved.
49
50
PFMEA Step 3
Class
Identify special product or
process characteristics
51
PFMEA - Step 4
Potential Causes
For each Failure Mode,
determine the possible
cause of the failure.
TIP
There should be at least one potential cause for each failure mode.
2014 Eaton. All Rights Reserved.
52
53
PFMEA - Step 5
Current Controls
For each potential
cause, list the current
method used for
preventing and/or
detecting failure.
TIPS
This step in the FMEA begins to identify initial shortcomings or gaps in the current control plan.
If a procedure exists, enter the document number.
If no current control exists, list as none. There may not be both preventive and detection controls.
2014 Eaton. All Rights Reserved.
54
PFMEA - Step 6
Assign Detection
(How easily can the
cause or failure
mode be detected?)
Assign Severity
(How serious is the
effect if it fails?)
Assign
Occurrence
(How likely is
the cause to
occur?)
55
56
57
58
59
PFMEA - Step 7
TIPS
60
61
FMEA Step 8
62
Resp (responsibility)
Assign a specific person
who will be responsible
for recommended actions.
Actions Taken
As actions are identified
and completed, document
in the Actions Taken
column.
64
65
66
After
After
67
Objective? - Planning
Needed gaging, testing, error
proofing
Sampling and frequencies
How to react when something
fails a test or inspection
When to Use It
Implementing a new process
Implementing a process
change
2014 Eaton. All Rights
Reserved.
68
Control Plan
Tool Interaction
Department/Group Project
High Level Process Map
Project Idea
6 Sigma Project
High Level Process Map
Get WO Assigned
Begin/Work
Project
Follow DMAIC or
DFSS process
6 Sigma Assigns
Project Number
Monitor Progress
through Power
Steering and
Monthly
Financial
Reviews
Other Required
Signatures:
Segment CEO
Champion
Process Owner
BB or GB
No
Finance Approval
and Signature
No
Monitor Progress
through BiWeekly Updates
and Monthly
Reviews
6 Sigma
Project
Does the
Project Involve
>2 Groups in
Eng?
Yes
Department
or Group
Project
Does the
Project Involve
>3 Depts.
outside Eng?
O
D
Potential
Causes C OCurrent Controls
E
S
C C
E Potential Causes
Current ControlsT
V
C
Inadequate
None
staffing
in mail
Inadequate
None
10
roomstaffing in mail 7
7 room
7
Identify
Customer
Identify
Customer or bank
Acct identifies problem
Poka-Yoke wire transer
did not
include or bank whenAcct
trying
to applyproblem
process
Customer
identifies
Poka-Yoke wire tran
name
didand/or
not include 5 payment
when trying to apply 5 250
process
account
info
on
name
and/or
payment
10 account
5
5 250
wire
transfer info on
Customer
line
Finance Approval
and Signature
Other Required
Signatures:
Champion: Dir T&E
Process Owner
Project Owner
Dept BB or MBB
No
No
Wire
Information not AR balance is
Transfer
supplied
pastAR
duebalance is
Wire
Information not
reference
Transfer
supplied
past due
10
line reference
wire transfer
Incorrect
Invoice shows
Customer error
(AR
Identify Invoice Checks invoice
Incorrect outstanding
Invoice shows
Customer error
5
supplied
balance
does go(AR5
invoice
outstanding
down)
supplied
balance does go 5
down)
Identify Invoice Checks
Invoice number Invoice
shows
Customer error
outstanding
(AR
Identify Invoice Checks not supplied
Invoice number
Invoice shows
Customer error 10
does go(AR5
not supplied balance
outstanding
down)
balance does go 5
Identify Invoice Checks
Enter Remaining
Information on
Master Form
Yes
Yes
Process Steps
Final Project
Review
No
No
Close
Project
Follow DMAIC or
DFSS process
Is Hard
Savings > $???
Does the
Project Involve
Only Your
Group?
Other Required
Signatures:
Champion: Dir T&E
Process Owner
Project Owner
Dept BB or MBB
Get DLN
Assigned
Begin/Work
Project
Complete Project
(Has to be fully
Documented)
Finance Approval
and Signature
Complete all
Documentation
including a
(1) Page Closeout Sheet
Finance Approval
and Signature
Do you
have BB/GB to
Assist/Work the
project?
Group Assigns
Project Number
Yes
Yes
Enter Remaining
Information on
Master Form
Final Project
Review
Other Required
Signatures:
Champion:
Process Owner
Project Owner
Dept GB/BB/MBB
Prefer to work
this project
within your
area?
Yes
Complete Project
(Has to be fully
Documented
Key
S
Potential
Potential
Process
Key Failure Mode Failure Effects E
Potential
Potential V
Process Step Input
Process
Failure Mode Failure Effects
Input
Receive
Checks
Delay internal AR balance does
Payment
Receive
Checks mail Delay internalnot go
ARdown
balance does
7
Payment
mail
not go down
Process Step
Close
Project
Complete all
Documentation
including a
(1) Page Closeout Sheet
New/Revised Process
Steps
R
DP
EN
E
Actions
RO E Recommended
Actions
PC O
Recommended
T N C
Investigate mail room
staffing
and
associated
Investigate
mail roo
490
processes
staffing and associa
10 490
processes
250
10 250
250
5 250
invoice
Provide payment stub
with Provide
statement
for each
payment
stu
invoice
with statement for e
down)
Process FMEA
Process Flowchart
Ri
s
Pr k P
oc r
es ior
s it i
St ze
ep d d
s
e
ov ols
r
p tr
m
I on
C
Pr
oc
es
ds
se ps Ste
i
ps
ev te
R
/ sS
w es
Ne oc
Pr
Control Plan
2014 Eaton. All Rights Reserved.
69
invoice
70
Administrative Section
Identifies part number and description,
supplier, required approval signatures,
and dates.
71
3 Distinct Phases
1. Prototype a description of the dimensional measurements and material
and performance tests that will occur during Prototype build.
2. Pre-Launch a description of the dimensional measurements and material
and performance tests that will occur after Prototype and before full
Production.
3. Production a comprehensive documentation of product/process
characteristics, process controls, tests, and measurement systems that will
occur during mass production
2014 Eaton. All Rights
Reserved.
72
73
74
75
76
77
78
79
80
81
82
Use process flow diagram and PFMEA to build the control plan;
keep them aligned
Controls should be effective. Keep it simple.
Ensure that the control plan is in your document control system
Good control plans address:
All testing requirements - dimensional, material, and performance
All product and process characteristics at every step throughout the process
83
84
When to Use It
On systems measuring critical inputs
and outputs prior to collecting data
for analysis.
For any new or modified process in
order to ensure the quality of the
data.
Who Should be Involved
Everyone that measures and makes
decisions about these measurements
should be involved in the MSA.
85
86
Observed Variation
Resolution
Precision
(Variability)
Repeatability
Reproducibility
Measurement
System
Variation
Linearity
Accuracy
Observed
Observed
Variation
Variation
(Central
Location)
Bias
Stability
Process
Variation
87
Resolution
Error in Resolution
Possible Cause
88
Possible Cause
Equipment Variation
89
Possible Cause
Appraiser Variation
90
91
Automatically calculates
%GRR, %PV, ndc
92
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
1.
Select 10 items that represent the full range of long-term process variation
2.
Identify the appraisers they should be operator who normally use the gage
3.
If appropriate, calibrate the gage or verify that the last calibration date is valid
4.
Open the GR&R VAR(Tol) worksheet in the AIAG Core Tools file to record data, or use
MiniTab
5.
Have each appraiser assess each part 3 times preferably in random order (Minitab can
generate a random run order)
6.
7.
8.
9.
93
94
95
MSA Summary
Measurement systems must be analyzed BEFORE
embarking on process improvement activities
MSA helps understand how much observed variation is
from the measurement system
MSA will tell you about the repeatability, reproducibility and
discrimination
Sample selection is very important sample during normal
production to capture total range of process variation
MSA assessors should be operators that would normally
use the measurement system
MSA should be done on a regular basis
2014 Eaton. All Rights Reserved.
96
Objective or Purpose
What is It?
Evidence that dimensional
verifications have been completed
and results indicate compliance with
specified requirements
97
Dimensional Results
Reviewers Checklist
All design record specifications (notes, referenced specifications,
etc.) shall be included in the Dimensional Results
Material and performance specifications results can be reported on the
separate Material, Performance Test Results
98
99
Material Results
The
The
100
101
102
103
Process Capability:
The Two Voices
104
Product produced
beyond both
Upper and Lower
Spec Limits.
Product produced
above the
Upper Spec Limit.
Product produced
below the
Lower Spec Limit.
105
Capability Studies
Process Data forCo2
15
UCL=14.18
IndividualValue
14
13
X=12.64
12
LCL=11.10
11
10
9
0
50
100
150
Observation Number
IndividualValue
14
13
X=12.64
12
LCL=11.10
11
10
9
0
50
100
150
Observation Number
106
Step 2 Step 3
Step 4
Step 5
Step 6 Step 7
107
20
15
Frequency
10
10
12
14
16
Mfg Hours
18
20
22
Bimodal Data
Histogram of Mfg Hours
Mean 19.98
StDev 1.713
N
100
25
Mean
StDev
N
15
Frequency
20
Frequency
15
10
10
5
5
16
18
20
Mfg Hours
22
Normal Data
24
-15
15
30
45
Mfg Hours
60
75
Skewed Data
108
20.19
18.87
100
109
LSL
Cp > 1.67
Cpk > 1.67
Cp > 1.67
Cpk < 1.00
Capable,
Centered
Capable,
Not Centered
USL
LSL
USL
Cp < 1.00
Cpk < 1.00
Cp < 1.00
Cpk < 0
Not Capable,
Not Centered
Not Capable,
Centered
LSL
USL
LSL
USL
110
Acceptance Criteria
Acceptance criteria for critical vs. non-critical characteristics
Red (Bad)
Yellow (Marginal)
Green (Good)
Short-term
Long-term
<1.33
<1.00
1.33-1.67
1.00-1.33
>1.67
>1.33
Decision
111
112
113
IMPORTANT!
Only applies for parts with color, grain,
or surface appearance requirements
114
Administrative Section
Identifies part number and description,
supplier, required approval signatures,
and dates.
115
116
117
Objective or Purpose
Confirm cosmetic or functional
part approval.
When to Use It
Sample parts should be delivered
WITH the PPAP submission
118
119
120
121
122
123
PFA (cont.)
124
PFA (cont.)
125
PFA (cont.)
126
PFA (cont.)
127
Gage Plan
128
129
130
When to Use It
Prior to shipping production parts
131
132
133
134
135
136
137
138
139
140
PPAP Summary
PPAP checks that any process changes have
been properly designed and validated, and the
resulting process is capable of repeatedly
producing parts to specification
The PPAP elements should be part of your
Quality Management System. PPAP shouldnt
require much extra effort, because youve already
done the work internally to manage your changes.
Reacting to later issues with the product or
process can be expensive and time-consuming!
2014 Eaton. All Rights Reserved.