PLANNING,

COORDINATION,
SCHEDULING AND
EXECUTION

MAINTENANCE
MANAGEMENT

BERKAITAN DENGAN CARA


MENGELOLA AKTIVITAS
PERAWATAN AT THE SHOP
FLOOR DENGAN TUJUAN
UNTUK MENCAPAI
MAINTENANCE EXCELLENCE
State of maintenance
management and
performance that applies
leading edge policies,

INTEGRATED MAINTENANCE
MANAGEMENT PARTNERSHIP

KEY TO ACHIEVING
MAINTENANCE
EXCELLENCE

GET THE BASIC RIGHT AND


MAKE MAINTENANCE
EXCELLENCE A GOAL OF
ENTIRE ORGANIZATION
Planning, parts acquisition,
work measurement,
coordination and scheduling
are foremost things in

WHAT IS MAINTENANCE
PLANNING ?

Maintenance planning is the process by which


the elements required to perform a task are
determined in advance of the job start or the
development of a detailed program to achieve
an end (What, Who, How to do the
maintenance job and for How Much ?)

SCOPE OF MAINTENANCE
PLANNING
Analysis of work to be
performed
Sequence of associated tasks
Methods to be used
Required resources which
include :
1. Crew size and skills and
man-hours
2. Components, tools and
special tools

Classification of Maintenance Work According


to Planning and Scheduling Purposes
Routine maintenance:
are maintenance operations of a periodic nature.
They are planned and scheduled and in advance.
They are covered by blanket orders and these
include PM or PdM, inspection, lubrication,
adjustment, cleaning, repair and overhaul etc.
Emergency or breakdown maintenance:
interrupt maintenance schedules in order to be
performed. They are planned and scheduled as they
happened.

Design modifications : are planned and


scheduled and they depend on eliminating the
cause of repeated breakdowns.
Timely backlog relief :
Backlog is all work available to be done.
Backlog work has been approved, parts are
either listed or bought and everything is ready
to go

ROLE OF MAINTENANCE
PLANNER

MAINTENANCE
COORDINATION
Encompasses logistical
efforts of assembling all
necessary resources so the
job is ready to be
scheduled.
This activity is conducted in
harmony with Purchasing,
Operations, Engineering,
Maintenance, Store and

MAINTENANCE SCHEDULING :
IS THE WRITTEN PROCESS WHERE
LABOR RESOURCES AND SUPPORT
EQUIPMENT ARE ALLOCATED TO
SPECIFIC JOB AT A FIXED TIME
(When to do the job)

MAINTENANCE EXECUTION :
The process where all planned job
package are executed or done at the
shop floor and this activity is under
the responsibility of maintenance
supervisor

Planner or Scheduler
Interfaces, Activities and
Responsibilities

BASIC MAINTENANCE
PLANNING PROCESS

NEGOTIATING MAINTENANCE
WINDOW

TYPICAL BALANCED
BACKLOG

WHY PLAN, COORDINATE AND


SCHEDULE MAINTENANCE JOBS ?
1. Jobs can be accomplished more
efficiently
2. At lower cost to execute
3. Fewer disturbances of operations
4. Higher quality process
5. Improved morale with greater job
satisfaction
6. Increase longevity of equipment
7. Reduce parts usage
8. Planned job requires only half as

CONSIDERED TOGETHER, PLANNING,


COORDINATION AND SCHEDULING
CONSTITUTE

JOB PREPARATION
Maintenance management will
achieve its best results when
each mechanic or technician is
given specific tasks to be
completed in a definite time
period (scheduling) in a specific
manner (planning)

OBJECTIVE OF WORK
PREPARATION

1. Coordinates use of the various


input resources
2. Relieves supervisor workload so
that he can more focus to job
execution efforts
3. Allows a maintenance craftsman
to prepare for, safely perform and
economically complete each job
4. Supports the operation to
produce quality product at low
cost

PREREQUISITES
1. ADANYA LEAD TIME YANG CUKUP
2. STRUKTUR ORGANISASI YANG
JELAS
3. EFFECTIVE MANAGEMENT OF
MATERIALS
4. MISI DEPARTEMEN YANG JELAS
5. ADANYA DUKUNGAN DARI
ENGINEERING
6. PERLU ADANYA MAINTENANCE
TECHNICAL LIBRARY (MTL) YANG