Академический Документы
Профессиональный Документы
Культура Документы
Background
Fulfilling one of the courses that is required
for students of Chemical Engineering
University of Riau.
Learn and study the processing of Heavy Oil,
including Oil Treating Plant (OTP) and Water
Treating Plant (WTP)
Gaining knowledge in the design of the
pipeline in PT. CPI.
Activities During
Practical Work
Flare
Stack
Float
Pit A&B
ORF
Disposal
Wells
Softene
r
API Sep
4X
To Prod line
SOP
FFF
API Separator)
Salt
GFW
MFU
NDC Cogenerator
Sand
Trap-B
SFI
Sand
Trap-A
Cooling Pond
Water
Disposal
Backgroud of Particular
Task
NDC blow down pit is a pit of waste water from
co-generator. In blow down pit usually used portable
pumps, pipelines and hose to transport the waste
water to a waste water injection tank to be injected
into the injection well. Beside that, there is a pump
that is not used, so it can be used as a permanent
pump for transporting of waste water. The purpose
of this particular task to design the pipeline used
permanently, which is to study and design a
transport pipe for distribution of NDC Blow down Pit.
Piping Layout
NDC Blow down
Pit
Data Pump
Pressure
Discharge
(psi)
Speed
(RPM)
260
81
Data Pump:
Speed = 81 RPM
Pressure Discharge =
260 psi
Q = 68,83 GPM
Diameter pipe 4
Velocit and 6
y
Diameter pipe
3
No
Ye
s
Result is
Pipe
diameter
3
Diameter pipe
3
Ye
s
1-4 psi/100
ft
Pressure
Drop
No
Diameter pipe 4
and 6
Dikeahui:
1. V= 69,1 gal/min
= 69,1 X 6,309x10-5
= 0,0044 m3/s
2. d= 3= 0,0762 m
A=
A=
A = 0,00456 m2
3.
v = 0,98 m/s
4. Re =
Re =
5. ff
= 0,021 (Moody
Chart)
6. mayor loss
hf = ff
=
= 12,95 m
7. Minor loss
* Kf elbow 900 =0,9
Number elbow =25
hf = 0,9 x 25
= 22,5
hf = kf x
= 22,5 x
= 1,1 m
*enlargement
= 74.674
/d = 0,00066
hf = 0,03 m
minor loss
= 1,1+ 0,03
= 1,13 m
8. Total hl
=mayor loss + minor
loss
= 12,95 + 1,13
= 14,08 m
9. Pressure drop
= 1000 x 9,81 x 14,08
= 138.125 N/m2
= 138.12 N/m2 x
= 20,03 psi
10. Pressure drop on elevation 15 ft
Pressure Drop(P)
Size
Pipa
(inchi)
Flow
rate
(ft3/s)
Pressure
Drop
pipephase
(psi)
3
4
6
0,2
0,2
0,2
29,85
17,51
13,64
Pressure Pressure
Pressure
Drop
Drop
Drop
(psi/100 Perhitung
(psi/100
ft)
an manual
ft)
(psi)
1
0,6
0,4
26,53
11,42
7,24
1
0,4
0,3
Referensi
Pressure
Drop pipe
of water
(psi/100
ft)
Result
1-4
1-4
1-4
Yes
No
No
Velocity (v)
Velocity
(ft/s)
Referensi
velocity pipe
of water
(ft/s)
Result
0,2
3,1
3-15
Yes
0,2
1,8
3-15
No
0,2
0,8
3-15
No
No.
Size
Pipa
(inchi)
Flow rate
(ft3/s)
1.
2.
3.
Data pipe :
Material Carbon
Steel A 106
P = 40 psi
D = 3 inc = 3,5
inc (diameter
actual)
T = 200 F
The
The value
value of
of SS
(( Table
Table 402.3.1a
402.3.1a ))
Get
Get value
value of
of tt
c = 3/16
inch
Get
Get value
value
of
of
tn
tn
Select Schedule
Number 40 for pipe
3
Calculation of Thickness
Pipe 3 "Info: :
t = pressure design wall
thickness
S = stress value for material
D = outside diameter of pipe
Pi = internal design gage
pressure
tn = nominal wall thickness
c = corrosion allowances
Conclusion
1. The processing in the gas boot due to decreased pressure
so that oil and gas will be separated.
2. Process in the FWKO tank and Wash tank there is a
separation based on differences in density.
3. The process in the ORF there is a filtration media that is
pecan-walnut and garnet-anthracit, while the filtration
media that we learned in college is using sand and clay.
4. Pipe Size is selected as the transportation of NDC Blow
down Pit to the Waste Water Storage Tank is 3 , with the
schedule Number 40 and the pipe thickness 0.216".
Pressure drop obtained at 1 psi / 100 ft and a velocity of
3.1 ft / s.
TERIMAKASIH