It is a proof that a product has successfully passed all the tests according to the referred Standards Type Test
program (e.g. IEC xxxx)
Its technical drawings have been verified and a visual inspection has been carried out
To receive this certificate, the equipment tested must fulfill all the requirements of the standard and the
relevant ratings assigned by the manufacturer
KEMA Type Test Certificates can be issued only if all relevant tests have been successfully performed at the
DNV GL laboratories
For utilities and network operators, a gold KEMA Type Test Certificate says the component meets all
requirements of the standard and no further effort is needed to assess it
2015 K-Electric, All rights reserved.
Sometimes, a manufacturer / customer will choose to have one or more tests carried out according to the
customers instructions in a particular standard (e.g. IEC xxxx), but not all of them
It is a proof that when a component successfully passes a subset of a Standards Type Test program,
Its technical drawings have been verified and a visual inspection has been carried out
This might happen when, for example, the end customer wishes to have reassurance on a particular point only,
when the manufacturer wants to assess the development of a design, or when a product is not capable of
withstanding certain tests
KEMA Report of Performance is a document specifying which tests have been conducted and what the results
were
A Report of Performance is not a confirmation that the product has passed the test successfully
The end customer may use these results and test program to determine if they are applicable and sufficient for
2015 K-Electric, All rights reserved.
3
their needs
This also means that the manufacturer / customer choose to have one or more tests carried out according to
the customers instructions in a particular standard (e.g. IEC xxxx), but not all of them
This could mean that the tests did not fulfill the requirements of the Standard
It could also mean that the drawings were not provided or there was no visual inspection
The Grey report (Test Report) could be for tests based on any criteria e.g. clients instructions, clients
specification, international standards, or a combination of these. The results may be positive or negative but
KEMA will not comment on it in the report.
When utilities and network operators see a grey KEMA Test Report, they must read it carefully to
assess the components performance themselves, which requires deep technical knowledge of
standards and expertise on how to interpret them
2015 K-Electric, All rights reserved.
An Inspection Report records tests witnessed by DNV GL inspectors in non-DNV GL laboratories, i.e. at
Manufacturer Factory / premises
If the witnessed test complies with the full type test program then an Inspection Report regarding Type Test is
issued
Inspection Reports can cover a wide range of tests, and a one page summary is available on request
DNV GL Inspectors make sure that the testing equipment / instruments are well calibrated as per standards and
only perform test after its assurance
KEMA also provide factory acceptance and special inspection reports regarding quality deviations or process audits.
On request, they can also supply a one page summary of the report
2015 K-Electric, All rights reserved.
5
DIFFERENCE PARAMETERS
GOLD
SILVE
R
GRE
Y
INSPECTI
ON
Gold
Silver
Grey
Simple
White
Seal
Gold
Silver
Grey
No Seal
Ribbon
Red
Green
Grey
No Ribbon
May be
N/A
May
be
May be
May
be
May be
May
be
May be
Visible Difference
Technical Difference
N/A
N/A
May be
.
Equipment has passed all the test as
per
The
GreyIEC
report (Test Report) could be for tests based on any criteria e.g. clients instructions, clients specification, international standards,
or a combination of these. The results may be positive or negative but KEMA will not comment on it in the report, as it is the readers
N/A
May
May be
responsibility to evaluate the Grey report.
be
Suppliers always mention that KEMA Laboratories has no time slots available on a short notice?
Please let me assure you that this is never the case. Together with the customer we always seek to
find a way, acceptable to both parties to perform the tests. We always find a suitable solution. For
future projects, if any of your vendors informed that KEMA do not have timeslots available, please
contact us directly so we can check and see if we can be of service
________________________________________________________________________________________________________________
KE 2
How can end user make sure that the submitted KEMA Type Test certificate are genuine?
KEMA End User can ask KEMA / DNV GL to verify and confirm if the KEMA Type Test Certificate / Report,
provided by the Manufacturer are Genuine;
Please forward them to us. KEMA will not charge any fee and checking of any of the reports is Free
of Cost
In addition, a copy of the original Report can be issued only with the consent of the Client (who
ordered the test)
Doubtful (fake) reports can also be checked at our website http://ttc.dnvgl.com
________________________________________________________________________________________________________________
KE 3
Do KEMA perform Type Testing of Energy Meters? and on which IEC standards?
10
How much time required for Type Test of Energy Meters? How many meters do you require?
KEMA We require 8 to 10 samples normally, so that a number of tests can be performed in simultaneously. The
total test program
takes about 8 weeks normally or minimum 3 weeks under special agreement. This will
be included in the quotation.
________________________________________________________________________________________________________________
KE 8
Can End user witness the Type Test along with the Client (Manufacturer)?
KEMA Yes; they can. However, it totally depends on the client (manufacturer) if they wants the End User to
witness the Type Test or not.
________________________________________________________________________________________________________________
KE 9
For Energy Meters, is it necessary that Type Test has to be performed in DNV GL Labs?
KEMA KEMA issues the Gold, Silver, Grey Reports; if Energy meters are only tested in our labs in Arnhem. We
have a type test certificate for compliance to the full standard or a type test report for other cases.
At present our customers require PDF certificates only. These are the same as the printed Gold certificates
and can be issued
in the printed form against normal charges for certificates.
________________________________________________________________________________________________________________
KE 10
DNV GL / KEMA website shows KEMA offices in Beijing & Shanghai. What are they? Can they perform
Type Test in China?
KEMA No, they cannot;
Those are only our SALES offices,
For Type Test Certificate, Meter has to be send to our labs in Arnhem
However, our Salesoffice
Shanghai
route
the reports (issued from Netherlands) to our
2015 in
K-Electric,
Allmay
rights
reserved.
11
Microsoft Word
97 - 2003 Document
THANK YOU