Академический Документы
Профессиональный Документы
Культура Документы
Wells
By Ashita Hiregoudar
Roll No: 311006
TE Petroleum
Contents
Introduction
DrillString Problems
T&D
Buckling
Bending
Case Study
Conclusion
References
Introduction
Horizontal
Long Radius
Well
Vertical
Section
Medium
Radius
Build Up
Section
Short Radius
Type of Radii
Well
(ft)
What
2 They
6/100
are ft
high
angle wells
drilled to
improve
reservoir
performance
by
8 50/100
ft
placing a long
wellbore section
1.5 inside
3/ft the
Horizontal
reservoir.
Section
Why
Horizo
ntal
Interva
Types
l (ft)
Radius
Fluid Flow
LRW
3000- Long
2000problems1000 Wells
5000
Heterogeneo
us Reservoirs
MRW
700EOR
125
SRW
40-20
Medium Radius
Wells
1500Short
Radius
2000
Wells
300400
DrillString Problems
Major tehcnical difficulties in Horizontal Wells:
Increased frictional resistance
Solid settling
Difficulty in controlling direction and applying
WOB
In Vertical
The
frictional
Section
force
which
resists
the
Drag
result
rotation of the
of
minor
drillstring.
DRAG
In Build Up
The
Sectionforce
HORIZONTAL
frictional
SECTION
which
resists the pull
Increased
or push of the
drillstring. area of
Drag is
higher
contact
Sliding
Downward travel Cutting beds
Drilling
Compression
Vc= Circumferential Velocity compone
while
Va= Axial Velocity
Component
Vr = Resultant Drilling.
Velocity Component
doglegs and
tension inRotation
the drill
string.
Torque is
Vc
higherVthan
r
Axial Drag
drag and
contributes
Va
N = Wall contact forces
to the
frictional
Buckling
Critical Buckling Load is given by:
Fc = (4EIWm
sin)
Locked
(12r)
Up
Moment of
Helical
Buoyant
Property
of
Radial
Inclination ()
Inertia
(I)
Weight (Wm)
Material( E)
Clearance (r)
Bucklin
Image Source: Roberto Aguilera- Horizontal
Helps decide
IncreasesWells
Remains
Vertical Well
Increases
the
g
the max
with size of
same for all
with depth
As
Sinusoi
hole size for
drillpipe.
as tubulars
increases, FcThe 4.5
OD 41 lb/ft drillpipes.
drillpipe is giving
better
stability
a particular
More stability
are dal
increases.
than increased
5 OD 25.6 lb/ft drilllpipe but at the cost of
drillpipe
Bucklin
increased
T&D.
g
Bending
Cyclic
Also
Cyclic
Loading
Cyclic
Stress
5
19.50
lb/ft
4
16.6
0
lb/ft
13.
3
lb/f
t
FATIGUE
Case Study
Efect on Buckling ?
Conclusion
Image Source: J.E. Smith, Grant TFW Inc- SPE Paper 23990
Case Study(cont.)
Efect on Bending Stress ?
Efect of Tensile Load on the
Bending Stress:
Image Source: J.E. Smith, Grant TFW Inc- SPE Paper 23990
Conclusion
Build Up Rate High
Low
T&D- highest in BUR
the horizontal
BUR
section
More
Lesser
stable wrt
T&D
Buckling & Bending- WhichBuckling
type of
tubular
?
BucklingLesser
Longer
BucklingCost and
Horizontal
Bendinghigh
well timeBendinglarger
Interval
angle
small
build
smaller
OD
Reduced
Conventio
rate
TVD
OD nal Tools
Variation
References
Roberto Aguilera et al, Horizontal Wells,
Contributions in Petroleum and Engineering, Gulf
Publishing Company, Houston, Texas- 1991.
J.E. Smith, Grant TFW Inc:Drillpipe for Horizontal
Well SPE Paper 23990- Presented at the 1992
SPE Permian Basin Oil and Gas Recovery
Conference held in Midland, Texas.
Dawson, R. and Paslay, P.R.: Drill Pipe Buckling in
Inclined Holes Journal of Petroleum Technology,
October 1984