COAL BED METHANE (CBM)

EXPLORATION PROGRESS STATUS


UNSRI PALEMBANG
25 April 2016

AGENDA
Introduction
CBM Potential S. Sumatra
Tanjung Enim Pilot Project
Reserves
Commercialization
Conclusion

UNCONVENTIONAL GAS - TRANSFORMATIVE AND


CBM and shale have transformed the energy landscape in North
GLOBAL
America and Australia
Europe and Asia have significant untapped unconventional gas
resources
The long-term sector dynamics are favourable and Dart is well
placed to leverage on these
Canada

Natural gas reserves: 70 Tcf


CBM resources: 1,660 Tcf
Shale resources: 385 Tcf

USA
Natural gas reserves: 300 Tcf
CBM resources: 740 Tcf
Shale resources: 850 Tcf

North America Case


Study

United Kingdom

Russia

Natural gas reserves: 7 Tcf


CBM resources: 71 Tcf
Shale resources: 21 Tcf

Natural gas reserves: 1,575 Tcf


CBM resources: 1,730 Tcf

Poland
Germany
Natural gas reserves: 3.5 Tcf
CBM resources: 106 Tcf
Shale resources: 7 Tcf

Over 20-year history of CBM


production
23% of US natural gas in 2010
accounted for by shale gas1

Natural gas reserves: 3.5 Tcf


CBM resources: 106 Tcf
Shale resources: 180 Tcf

China
37

India
Natural gas reserves: 42 Tcf
CBM resources: 282 Tcf
Shale resources: 60 Tcf

Indonesia
Natural gas reserves: 105 Tcf
CBM resources: 450 Tcf
Shale resources: 575 Tcf

Australia
Study
Proven natural gas reserves
Source: EIA, Datafusion

1 EIA Annual Energy Outlook 2012 (Early Release) http://www.eia.gov/forecasts/aeo/er/pdf/0383er(2012).pdf

Natural gas reserves: 110 Tcf


CBM resources: 1,300 Tcf
Shale resources: 1,260 Tcf

Australia
Natural gas reserves: 135 Tcf
CBM resources: 350 Tcf
CaseShale resources: 390 Tcf

70% of Queenslands gas supplied


by CBM
4th largest LNG exporter
Expected to be the largest in <10
years once projects in development
come online

CBM INDONESIA POTENTIAL

CBM INDONESIA IMPORTANT BASINS

Sedang
dieksplorasi

Coal Gas Indonesia: Tertiary in age (5-6,5 my, Lignite Sub Bituminous type)
5

Courtesy : SKK Migas

Coalbed Methane Basics


CBM is composed of mainly methane, formed during coalification
process
Coal is a source rock, seal, as
well as a reservoir rock
Gas is adsorbed on the coal
surface with little free gas
Gas is released by lowering the
pressure through dewatering

Coal sample with cleats the natural fracture system that


controls permeability
6

Gas is delivered through a fracture


network known as the cleat system

CBM projects typically have long


life > 30 years

S. SUMATERA REGIONAL TECTONIC SETTING

Sub-basinal physiography of South Sumatera Basin (Sarjono and Sardjito,


1989; Susena et al, 1992)
TANJUNG ENIM CBM PROJECT AREA

Located in SSB Back arc


basin
Part of NW-SE Pre-Tertiary
basement high
Pull-apart basin bounded by
major fault

SOUTH SUMATERA TERTIARY STRATIGRAPHY NOMENCLATURE

Source : G & G Study 2012, Tanjung Enim CBM PSC


8

COAL SEAMS OF MUARA ENIM FM.


Key bed (white)

Manggus 1 (A1) Coal Seam

SURFACE GEOLOGY ENIM CBM PSCOF TANJUNG


Regional Geology around Tanjung
enim block based on surface map:

Surface geology map based on P3G Bandung data.

10

Oldest formation outcropped is


Gumai Fmn: claystone and shale;
marine

Air Benakat fmn: claystone with


siltstone and shale; shallow marine

Muara Enim fm : Thick coal


seams
interbedded
with
claystone and
sandstone,
siltstone terrestrial

Kasai fmn: tuff, sandy tuff and


tuffaceous sandstone; terrestrial

Young volcanic,Breccia, lavas and


tuff of andesitic composition

Surface geology map shows


Tanjung Enim block is covered by
Air benakat Fm, Muara enim Fm,
Kasai Fm, and several younger
volcanics.

Typical CBM Well


CBM is adsorbed in the micropore of
coal and trapped by pressure
Pressure is lowered by fluid production
(mainly water) for about 6-24 months
After the pressure is depleted, CBM will
be released and flow to surface

11 11

CBM Production Curve

PRODUCTION PLATEAU

Note :
Curve of a CBM well
To produce high production
rate, a great number of wells are
needed.
12 12

TANJUNG ENIM CBM PSC

TARGET COAL SEAMS

13

Exploration Plan

14

Coal Description

15

LAYOUT OF PILOT LOCATION

16

TANJUNG ENIM PILOT PROJECT WATER POND

17

TECBM#P01-P COMPLETION DESIGN

18

GAS COMPOSITION

19

WATER ANALYSIS

20

PILOT IMPORTANT INFORMATION


CBM Producibility
CBM Composition Good
Formation Water Quality Expect Some Degree of Treatment
Qualitative Coal Permeability Stimulation is a Must?
Sub-commercial Production for Non-stimulated and cemented Well

21

Tanjung Enim Un-cemented Production Liner

22

LIULIN CASE STUDY THE INSEAM CLUSTER


Inseam Cluster

1 x drilling site
2 x inseam wells
2 x seams targeted
14km inseam hole (per site)
Drainage area: 3.2-4.0 km 2 (per site)

Most cost effective well in Liulins low perm and


challenging topography

Slanted
production well

Inseam hole

1 x Site

Radius
bend

Lined laterals

23

LIULIN CASE STUDY THE INSEAM CLUSTER

24

RESERVES CERTIFICATION (AFTER TECBM#P03-P


PILOT WELL)

25

CBM Commercialization Prospect


CBM for electrical power
CBM for another domestic
consumption
CITY GAS
CNG for
TRANSPORTATION
INDUSTRY

CBM for LNG


Courtesy : Ditjen MIGAS
26 26

Conclusion

CBM industry in Indonesia is quite prospect,


resources up to 453 TCF -> future energy
resources
High Risk High Return business
Still to find suitable method; completion
technology, drilling, cost effective
Conclusive production tests
New energy that needs support and incentives
from government (UU No.30/2007)

27 27