Вы находитесь на странице: 1из 24

TECHNICAL AUDIT

An Introduction

Technical Audit - Organogram


Chief Technical Services

Head Technical Audit


NR & HQ
MR - Offshore

Head SMP
Head QAD
Head EM

WR AMD, MHN, ANK


ER AA, A&AA, Silchar
CR Kolkota, Tripura
SR Cauvery, Rajahmundry

Head IMPETUS

Inception
Instituted in 1985-86 with an
objective to enhance equipment life
cycle.
To ascertain compliance to maintenance
programs.
To assess overall system integrity.
To be an effective Management Tool for
monitoring equipment health.

Objective

To assess and verify the


installation and compliance
to maintenance efforts for its
desired performance with an
ultimate aim to enhance the
equipment life cycle.

TA Group, Technical Services

Technical Audit
A systematic & structured approach for
physical assessment and verification of
plant & machinery to identify.

Compliance to maintenance plans.


Equipment health & condition.
Operational risk.
And suggest to maximize performance.

An element of TS Performance and MOU


with ONGC & MOPNG.
Observation implementation an element of
performance
monitoring
of
Assets
/
Services / Plants by PMBG.
5

TA Group, Technical Services

Installation Details
Offshore

Process Complexes
Wellhead Platforms
Drilling Rigs
:
OSVs & MSVs
:
Process Plants
:

:
:

12 nos.
127 nos.
9 nos.
17 nos.
2 nos.

Onshore
GGS, GCP, GCS, EPS
:
ETP, WIP, CTF, CPP
:
Drilling Rigs
:
Work Over Rigs
:
Project & Central W/shop :
nos.
Other (Power & Pump
:

Plants etc.)
House,
TotalAC
Installations
:
nos.
TA Group, Technical Services

128 nos.
57 nos.
70 nos.
60 nos.
7
38 nos.

531

Audit Periodicity
A
systematic
process
to
ascertain
conformance to established operation and
maintenance practices of equipment with
the defined periodicity.
Plants &
Installations
: Every
Year
Drilling & Work Over Rigs :
Year

Every

CWS
Year

Every

&

Project

Un-Manned
Year
7

OSV & MSV

Workshop :

Platform
:

Every

Every 2 Year

TA Group, Technical Services

CONCEPT LIFE CYCLE MANAGEMENT


BUSINESS PLAN
OPERATING

ACQUISITION

ACTIVITIES

STRATEGY DEV. &


REVIEW
ASSET
DISPOSAL

MAINT. MGMT
IMPROVEMENT

MAINT. MGMT
EVALUATION

MAINT. MGMT
PLANNING

MAINT. MGMT
EXECUTION

MAINT.
MGMT
BUDGET

EQUIPMENT - CONCEPT

Availability Concept
The condition, health and performance of an
equipment, system and Installation can be
assessed using the concept of availability.
Parameters of equipment operating, PMS,
breakdown, stand by, overhauling hours are
used for calculation.
The availability is calculated on monthly
and annual basis for all critical and
essential equipment at installation.
Compliance
to
maintenance
indicates
maintainability of equipment.
10

RELIABILITY -CONCEPT
RELIABILITY
PREVENT

LUBRICATION
ALIGNEMENT

OBJECTIVE

SUBJECTIVE

BALANCING
CLEANING
OPERATIONAL
PRACTICES
INSTALLATION
PRACTICE
FILTERATION
ADJUSTMENT

DOWN TIME
COLLECT DATA

VIBRATION
ANALYSIS
OIL ANALYSIS
NDT
STROBOSCOPE

LOOK
LISTEN
FEEL
SMELL

ROOTCAUSE
ANALYSIS

Technical Audit Process


Preparation of Annual Plan.
Service Level Agreement with Assets, Basins and
Plants.
Audit Execution by Regional TA Group as per
plan.
Collection of Equipment Operation &
Maintenance data.
Discussion with field executives on equipment
performance.

12

Technical Audit Process contd.


Discussion with Area In-Charge for action initiated
to resolve critical issues.
Scrutiny of Equipment operation & maintenance
records (log books, history sheets etc.).
Application of equipment health monitoring
criteria.
Field visit for overall physical assessment of
installation.

13

Technical Audit Process contd.


Preparation of Draft TA report covering brief of
installation and audit observations for user
comments.
Issue of final report with audit observations
indicating category and type.
Category as Vital, Essential & Desirable.
Type as Repair, Safety, Overhauling, Preventive
Maintenance, Test & Inspection, Painting,
Housekeeping, Documentation & Others.
TA Observation follow up program.
14

TAO Implementation
Trend
3000

2800

2786

2743

2600

2535

2400

2302
2200
08-09

15

09-10

10-11

TA Group, Technical Services

11-12

TAO Pending Trend


2500
2411
2250
2000

2007
1681

1750
1500
1250
1000
08-09

16

1127
09-10

10-11

TA Group, Technical Services

11-12

TAO Trend - Raised Vs


Implemented
2900
2800

2786

2743

2700
2600

2535
Raised

2500
2400

2427

2339

2300 2302

2209

2200

2232

2100
2000
08-09

17

09-10

10-11

TA Group, Technical Services

11-12

Technical Audit SAP


Module
Transaction Code - ZPMTA
Access to all users.
Display of TA Observations with
Category & Type.
User can update action being taken &
compliance.

Analysis of TA observations by
Selection of location, category, period
and status.
Report of TA observations can be
generated in PDF.

18

TA Group, Technical Services

COTA - Mandate
Committee on Technical Audits (COTA) was
constituted in 2007 to enable in resolving
critical Technical Audit issues and has the
following mandate.

19

Appraisal of Technical Audit progress &


effectiveness.
Strategies for effective auditing & timely
implementation.
Review of vital / critical issues.
Review
&
Development
of
Audit
processes & techniques in line with best
global practices.
Review of manpower
and their training
TA Group, Technical Services

Revised Audit
Process
Equipment specific audit process.
Checklist replaced with audit sheets.
Analytical & Compliance approach for
Equipment operational, maintenance &
overhauling data.
Measurable and result oriented approach.
A transparent and even process for all
Installations.
TA Report with analysis to Auditee with
focus on equipment health & performance.

20

TA Group, Technical Services

Evaluation Criteria
Analytical approach Performance Rating
Equipment availability.
Equipment reliability.
System availability.
Installation availability.
Compliance approach Maintenance Rating
Compliance to PMS.
Compliance to OH.
Compliance to Health Monitoring.
Compliance to TA Observations.
Substantive approach Physical
Assessment Rating
Equipment : Operation & safety.
Housekeeping.
Electrical System.
Documentation.
21

TA Group, Technical Services

TA Rating Revised

A A A

Physical
Assessment

1. Equipment
Operation &
Maintenance
Safety.
2. Electrical
Systems.
3. Housekeeping.
Performance
4. Documentation.
1.
PMS
Compliance.
1. Equipment
2. Health Monitoring
Availability.
Compliance.
2. Equipment
3. Overhauling
Reliability.
Compliance.
3. System
4. TA Compliance.
Availability.
4. Installation
22
TA Group, Technical Services
Availability.

Presentation Sum-up

23

The Technical Audit


Important tool to monitor health and
condition of equipment.
Focus
on
equipment
life
cycle
management.
Provide user with data to arrive at
desired
action
for
improving
performance and reliability.
Observations are indicator of action
being taken by users.
To maintain consistency & a judicious
audit process, the TA process is being
revised and a manual prepared for
TA Group, Technical Services
auditors guidelines.

Thanks

Вам также может понравиться