Agenda
This delivery manual is intended as a guide for correct handling of the
machine in reassembly and inspections.
1.
2.
3.
4.
5.
6.
Machine Dimension
Transportation Mode
On-Carriage at Discharging Port
Machine Stock at Depot or/ and Dealer
Reassembly at Depot or/ and Dealer
DI (Delivery Inspection) at Depot or/ and Dealer
1. Machine Dimension
1-1 General purpose machine
Figure
13216
4090
858
4390
4600
650
2700
4000
4230
650
Width (mm)
Height (mm)
Weight (kg)
13,216
4,230
4,600
70,000
1. Machine Dimension
1-2 Mass excavation machine
12192
Figure
4825
4665
4090
Width (mm)
Height (mm)
Weight (kg)
12,192
4,230
4,852
70,000
2. Transportation Mode
Overview (GP)
70 ton
Mode 1
67 ton
Mode 2
63 ton
Mode 3
47 ton
Mode 4
22ton
25 ton
3- 4 ton
7 ton
23 ton
23 ton
Note) The weight is based on GP machine with 650mm shoe, this weight is subject to specification of machine.
2. Transportation Mode
2-1 Mode 1: Complete Machine with loose Bucket
Figure
Description
EU : Possible, Need permit. Transport will be very
high, long and low to the ground
Width (mm)
Height (mm)
Weight (kg)
13,211
4,230
4,300
66,300
2. Transportation Mode
2-2 Mode 2: Complete Machine with loose Arm & Bucket
Figure
Description
EU :Very well possible, This a transport mode
very often used. Complete machine including
arm and bucket can be shipped on one big truck
Width (mm)
Height (mm)
Weight (kg)
11,640
3,500
3,710
62,900
Note) Removed side walk and hand rail and retracted 750mm shoe.
Weight and dimension is changeable subject to specification.
2. Transportation Mode
2-3 Mode 3: Base Machine with loose Boom, Arm, Bucket, CWT & Cylinders
Figure
Description
EU :Very well possible, This a transport mode
very often used. Complete machine including
arm
and bucket can be shipped on 1 big truck
Shoe Width
(mm)
650
6,730
3,510
4,000(3400)
46,000
750
6,730
3,510
4,100(3500)
47,700
900
6.730
3,510
4,250(3650)
47,800
2. Transportation Mode
2-4 Mode 4: Dismantling of Super Structure and Track Frame Assembly
Description
Figure
Length (mm)
Width (mm)
Height (mm)
Weight (kg)
Supper Structure
5,535
3,420
2,651
22,000
Track assy
5,990
650
1,395
12,200
900mm shoe
5,990
900
1,395
14,000
2. Transportation Mode
2-5 Loose Parts Specification (Boom, Arm, Bucket, CWT & Cylinders)
Figure
Description
B
A
B
A
B (mm)
Boom
8,015
1,770
6,200
Arm
4,233
2,118
3,400
Bucket
2,280
1,780
1,730
2,900
C.W.T
3,420
795
1,274
11,400
Width (mm)
Weight (kg)
4 Reassembly
4-1 Building size & Facilities
The Indoor
The Outdoor
4-3 Reassembly
4-3-1. Procedures before Start
4-3-2. Installing of Side Track Frame Assembly
4-3-3. Pre-Cleaner Assembly
4-3-4. Track Extension
4-3-5. Counterweight Assembly
4-3-6. Boom and Boom cylinder assembly
4-3-7. Hydraulic Hoses connection Boom cylinders
4-3-8. Hydraulic Hoses connection Boom piping
4-3-9. Arm assembly
4-3-10. Bucket assembly
4-3-11. Before Starting Operation
4-3-12. Reassembly Check Sheet
Description
1. Check appearance, leakage of oil, water.
2. Stock in a level and firm place.
(Avoiding the mud and a stony field)
3. Apply the rust protection at the potential point
before machine stock
4. Stocking
- Without Boom/Arm: No additional work
- With Boom/Arm: Arm & Bucket is vertical shape
as like left picture with circle
5. Turn off the Radio, light, A/Con switch and
RPM Switch with lowest position in stocking
6. In case of long stocking, turn off the master switch
Dimension
Remark
Description
1. Check the battery charging status, electronic
panel, engine status by starting monthly at least
2. Check the traveling and attachment operating
3. Check leakage of oils, water and rust
- refer to the regular check sheet
4. After checking, take a countermeasure for each
abnormal status
Dimension
Remark
Checking
Hyd Oil Level
Hyd Oil Fading
Gauge 1/2
Good
Coolant level
Fuel Level
Over 1/3
None
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Oil
Exterior
Electrics
Functions
Volvo
Criteria
Remarks